BOIL0169-002 Effective 07/01/2025
Trade Rate Fringe Total
BOILERMAKER $43.50 $37.64 $81.14
CARP0100-007 Effective 06/01/2025
Trade Rate Fringe Total
CARPENTER (ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION) $31.50 $21.15 $52.65
CARP1102-005 Effective 06/01/2025
Trade Rate Fringe Total
MILLWRIGHT $40.04 $26.47 $66.51
ELEC0275-003 Effective 06/01/2023
Trade Rate Fringe Total
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) $35.68 $23.36 $59.04
ENGI0324-028 Effective 06/01/2024
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $33.71 $25.25 $58.96
POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $39.57 $25.25 $64.82
IRON0025-005 Effective 06/01/2025
Trade Rate Fringe Total
IRONWORKER: STRUCTURAL $36.55 $29.51 $66.06
IRONWORKER: REINFORCING $36.55 $29.51 $66.06
IRON0025-009 Effective 04/01/2025
Trade Rate Fringe Total
IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY) $30.02 $27.43 $57.45
LABO0355-018 Effective 06/01/2024
Trade Rate Fringe Total
LABORER: MASON TENDER - BRICK/CEMENT/CONCRETE EXCLUDES OPEN CUT CONSTRUCTION $30.72 $12.95 $43.67
LABORER: COMMON OR GENERAL; SANDBLASTER EXCLUDES OPEN CUT CONSTRUCTION $23.34 $11.60 $34.94
PAIN0845-014 Effective 06/01/2024
Trade Rate Fringe Total
PAINTER: BRUSH, ROLLER, AND SPRAY ONLY $27.07 $16.56 $43.63
PAINTER (DRYWALL FINISHING/TAPING ONLY) $27.32 $16.72 $44.04
PAINTER: BRUSH, ROLLER, AND SPRAY ONLY $27.07 $16.56 $43.63
PAINTER (DRYWALL FINISHING/TAPING ONLY) $27.32 $16.72 $44.04
PAIN0845-014 Effective 06/01/2025
Trade Rate Fringe Total
PAINTER: BRUSH, ROLLER, AND SPRAY ONLY $27.07 $16.56 $43.63
PAINTER (DRYWALL FINISHING/TAPING ONLY) $27.32 $16.72 $44.04
PAINTER: BRUSH, ROLLER, AND SPRAY ONLY $27.07 $16.56 $43.63
PAINTER (DRYWALL FINISHING/TAPING ONLY) $27.32 $16.72 $44.04
PLAS0016-041 Effective 04/01/2014
Trade Rate Fringe Total
PLASTERER $21.18 $12.43 $33.61
CEMENT MASON/CONCRETE FINISHER $22.02 $12.38 $34.40
PLUM0174-006 Effective 07/01/2020
Trade Rate Fringe Total
PIPEFITTER (HVAC PIPE INSTALLATION ONLY) $37.09 $22.52 $59.61
PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) $37.89 $23.67 $61.56
PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) $37.89 $23.67 $61.56
PIPEFITTER (HVAC PIPE INSTALLATION ONLY) $37.09 $22.52 $59.61
PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) $37.89 $23.67 $61.56
PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) $37.89 $23.67 $61.56
PLUM0174-006 Effective 07/01/2021
Trade Rate Fringe Total
PIPEFITTER (HVAC PIPE INSTALLATION ONLY) $37.09 $22.52 $59.61
PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) $37.89 $23.67 $61.56
PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) $37.89 $23.67 $61.56
PIPEFITTER (HVAC PIPE INSTALLATION ONLY) $37.09 $22.52 $59.61
PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) $37.89 $23.67 $61.56
PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) $37.89 $23.67 $61.56
SFMI0669-003 Effective 01/02/2025
Trade Rate Fringe Total
SPRINKLER FITTER (FIRE SPRINKLERS) $41.34 $27.39 $68.73
SHEE0007-005 Effective 05/01/2023
Trade Rate Fringe Total
SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION) $35.41 $15.86 $51.27
SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) $35.41 $15.86 $51.27
SUMI2011-062 Effective 02/14/2011
Trade Rate Fringe Total
TRUCK DRIVER: FLATBED TRUCK $16.80 $3.97 $20.77
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $15.65 $3.12 $18.77
ROOFER $15.73 $7.41 $23.14
OPERATOR: TRACTOR $19.60 $7.31 $26.91
OPERATOR: ROLLER $28.02 $7.07 $35.09
OPERATOR: GRADER/BLADE $24.04 $6.03 $30.07
OPERATOR: BULLDOZER $22.34 $1.22 $23.56
LABORER: LANDSCAPE & IRRIGATION $12.84 $0.00 $12.84
GLAZIER $16.95 $4.74 $21.69
FLOOR LAYER: CARPET $19.59 $7.57 $27.16
ASBESTOS WORKER/HEAT & FROST INSULATOR $19.82 $7.31 $27.13

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Michigan.

Get notified when MI20260137 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.