Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
BOIL0169-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $43.50 | $37.64 | $81.14 |
CARP0100-007 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION) | $31.50 | $21.15 | $52.65 |
CARP0100-010 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (ALL OTHER WORK) | $31.50 | $21.15 | $52.65 |
CARP1102-005 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MILLWRIGHT | $40.04 | $26.47 | $66.51 |
ELEC0275-003 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $35.68 | $23.36 | $59.04 |
ENGI0324-028 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 |
IRON0025-005 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: STRUCTURAL | $36.55 | $29.51 | $66.06 |
| IRONWORKER: REINFORCING | $36.55 | $29.51 | $66.06 |
IRON0025-009 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY) | $30.02 | $27.43 | $57.45 |
LABO0355-018 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: MASON TENDER - BRICK/CEMENT/CONCRETE EXCLUDES OPEN CUT CONSTRUCTION | $30.72 | $12.95 | $43.67 |
| LABORER: COMMON OR GENERAL; SANDBLASTER EXCLUDES OPEN CUT CONSTRUCTION | $23.34 | $11.60 | $34.94 |
PAIN0845-014 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: BRUSH, ROLLER, AND SPRAY ONLY | $27.07 | $16.56 | $43.63 |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | $27.32 | $16.72 | $44.04 |
| PAINTER: BRUSH, ROLLER, AND SPRAY ONLY | $27.07 | $16.56 | $43.63 |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | $27.32 | $16.72 | $44.04 |
PAIN0845-014 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: BRUSH, ROLLER, AND SPRAY ONLY | $27.07 | $16.56 | $43.63 |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | $27.32 | $16.72 | $44.04 |
| PAINTER: BRUSH, ROLLER, AND SPRAY ONLY | $27.07 | $16.56 | $43.63 |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | $27.32 | $16.72 | $44.04 |
PLAS0016-015 Effective 04/01/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $21.15 | $12.78 | $33.93 |
PLUM0174-006 Effective 07/01/2020 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $37.09 | $22.52 | $59.61 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
| PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $37.09 | $22.52 | $59.61 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
| PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
PLUM0174-006 Effective 07/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $37.09 | $22.52 | $59.61 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
| PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $37.09 | $22.52 | $59.61 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
| PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
SFMI0669-003 Effective 01/02/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER (FIRE SPRINKLERS) | $41.34 | $27.39 | $68.73 |
SHEE0007-005 Effective 05/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION) | $35.41 | $15.86 | $51.27 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $35.41 | $15.86 | $51.27 |
SUMI2011-065 Effective 02/14/2011 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: FLATBED TRUCK | $16.80 | $3.97 | $20.77 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $15.65 | $3.12 | $18.77 |
| ROOFER | $15.73 | $7.41 | $23.14 |
| OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 |
| OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 |
| OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 |
| OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 |
| LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 |
| GLAZIER | $16.95 | $4.74 | $21.69 |
| FLOOR LAYER: CARPET | $19.59 | $7.57 | $27.16 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $19.82 | $7.31 | $27.13 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Michigan.
Get notified when MI20260140 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.