ASBE0034-004 Effective 06/09/2025
| Trade | Rate | Fringe | Total |
| ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS WHETHER THEY CONTAIN ASBESTOS OR NOT) | $55.34 | $34.03 | $89.37 |
BOIL0647-003 Effective 01/01/2025
| Trade | Rate | Fringe | Total |
| BOILERMAKER | $48.00 | $31.14 | $79.14 |
BRMN0001-007 Effective 05/01/2023
| Trade | Rate | Fringe | Total |
| BRICKLAYER: BRICKLAYER, BLOCKLAYER, CAULKER, CLEANER, POINTER, STONEMASON (SIBLEY COUNTY) | $45.11 | $25.61 | $70.72 |
BRMN0001-009 Effective 05/01/2023
| Trade | Rate | Fringe | Total |
| MARBLE SETTER | $45.47 | $26.33 | $71.80 |
BRMN0001-012 Effective 05/01/2023
| Trade | Rate | Fringe | Total |
| BRICKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON (MCLEOD COUNTY) | $45.11 | $25.61 | $70.72 |
BRMN0001-020 Effective 05/01/2023
| Trade | Rate | Fringe | Total |
| TILE LAYER (SIBLEY COUNTY) | $34.92 | $21.81 | $56.73 |
| TILE LAYER (MCLEOD COUNTY) | $39.17 | $10.16 | $49.33 |
BRMN0001-023 Effective 05/01/2023
| Trade | Rate | Fringe | Total |
| TILE FINISHER | $28.50 | $8.20 | $36.70 |
BRMN0001-035 Effective 05/02/2022
| Trade | Rate | Fringe | Total |
| TERRAZZO WORKER/SETTER (MECHANIC) | $44.36 | $22.35 | $66.71 |
| TERRAZZO WORKER/SETTER (FINISHER) | $42.67 | $22.04 | $64.71 |
| TERRAZZO WORKER/SETTER (BASE MACHINE) | $40.60 | $21.94 | $62.54 |
CARP0068-001 Effective 05/05/2025
| Trade | Rate | Fringe | Total |
| LATHER | $39.55 | $28.63 | $68.18 |
CARP0068-004 Effective 04/29/2024
| Trade | Rate | Fringe | Total |
| SOFT FLOOR LAYER (MCLEOD (E. PART, INCLUDING WINSTED, SILVER LAKE, LESTER PRAIRIE, PLATO & GLENCOE) & SIBLEY (NE PART, INCLUDING GREEN ISLE)) | $39.03 | $25.00 | $64.03 |
CARP0548-004 Effective 05/01/2025
| Trade | Rate | Fringe | Total |
| MILLWRIGHT | $42.95 | $36.81 | $79.76 |
CARP0930-018 Effective 04/29/2024
| Trade | Rate | Fringe | Total |
| CARPENTER: WOOD FRAME CONSTRUCTION (MCLEOD) | $36.71 | $20.17 | $56.88 |
| CARPENTER (MCLEOD) | $36.71 | $20.17 | $56.88 |
CARP1382-003 Effective 04/29/2024
| Trade | Rate | Fringe | Total |
| CARPENTER & PILEDRIVERMEN (SIBLEY COUNTY (EASTERN 1/3)) | $36.71 | $20.17 | $56.88 |
CARP1382-011 Effective 04/29/2024
| Trade | Rate | Fringe | Total |
| CARPENTER & PILEDRIVERMEN (SIBLEY COUNTY (WESTERN 2/3 INCLUDING GREEN ISLE, NEW AUBURN, AND GAYLORD)) | $36.71 | $20.17 | $56.88 |
ELEC0292-008 Effective 07/01/2023
| Trade | Rate | Fringe | Total |
| ELECTRICIAN ELECTRICAL CONTRACTS UNDER $5MILLION (MCLEOD COUNTY) CABLE SPLICER = $1.00 ADDITIONAL PER HOUR | $43.67 | $22.35 | $66.02 |
| ELECTRICIAN ELECTRICAL CONTRACTS $ 5 MILLION AND OVER (MCLEOD COUNTY) CABLE SPLICER = $1.00 ADDITIONAL PER HOUR | $44.12 | $22.57 | $66.69 |
ELEC0343-004 Effective 09/01/2025
| Trade | Rate | Fringe | Total |
| ELECTRICIAN (SIBLEY COUNTY) | $40.25 | $23.32 | $63.57 |
ENGI0049-012 Effective 05/01/2012
| Trade | Rate | Fringe | Total |
| POWER EQUIPMENT OPERATOR GROUP 8 MECHANICAL SPACE HEATER (TEMPORARY HEAT); OILER OR GREASER; & ELEVATOR | $28.29 | $15.95 | $44.24 |
| POWER EQUIPMENT OPERATOR GROUP 7 AIR COMPRESSOR 600 CFM OR OVER; PUMP AND/OR CONVEYOR; BRAKEMAN; PICK-UP SWEEPER (1 CU. YD. & OVER HOPPER CAPACITY); TRUCK CRANE OILER; & WELDING MACHINE, FIREMAN TEMPORARY HEAT | $30.30 | $15.95 | $46.25 |
| POWER EQUIPMENT OPERATOR GROUP 6 CONCRETE BATCH PLANT; GUNITE; TRACTOR D2 OR SIMILAR SIZE; & FRONT END LOADER, UP TO 1 CU. YD | $31.42 | $15.95 | $47.37 |
| POWER EQUIPMENT OPERATOR GROUP 5 AIR COMPRESSOR 450 CFM OR OVER (2 OR MORE MACHINES); PUMP AND/OR CONVEYOR (2 OR MORE MACHINES); MECHANIC; PUMPCRETE OR COMPLACO TYPE MACHINE; FORKLIFT; BOOM TRUCK UP TO 100 FT.; CONCRETE MIXER; DRILL RIG - HEAVY ROTARY OR CHURN WHEN USED FOR CAISSON DRILLING FOR ELEVATOR CYLINDER OR BUILDING CONSTRUCTION; FRONT END LOADER (OVER 1 CU. YD.); HOIST ENGINEER (1 OR 2 DRUMS); STRADDLE CARRIER; POWER PLANT ENGINEER (100 KW & OVER ON MULTIPLES EQUAL TO 100KW & OVER); TRACTOR OVER D2; & WELL POINT PUMP | $32.93 | $15.95 | $48.88 |
| POWER EQUIPMENT OPERATOR GROUP 4 CRAWLER BACKHOE; HOIST ENGINEER (3 DRUMS OR MORE); LOCOMOTIVE OPERATOR; OVERHEAD CRANE OPERATOR (INSIDE BUILDING PERIMETER); & TRACTOR OPERATOR WITH BOOM | $33.10 | $15.95 | $49.05 |
| POWER EQUIPMENT OPERATOR GROUP 3 TRAVELING TOWER CRANE; MASTER MECHANIC; PILE DRIVING (WHEN 3 DRUMS ARE USED); TRUCK & CRAWLER CRANE, UP TO BUT NOT INCLUDING 150' OF BOOM, INCLUDING JIB; DERRICK (GUY & STIFFLEG); TOWER CRANE (STATIONARY) UP TO 200'; & ALL TERRAIN VEHICLE CRANE, BOOM TRUCK OVER 100 FT | $33.44 | $15.95 | $49.39 |
| POWER EQUIPMENT OPERATOR GROUP 1 HELICOPTER; TRUCK & CRAWLER CRANE WITH 200' OF BOOM & OVER, INCLUDING JIB ($.50 PREMIUM WITH 300' OF BOOM & OVER, INCLUDING JIB); & TOWER CRANE 250' & OVER | $35.19 | $15.95 | $51.14 |
IRON0512-004 Effective 04/30/2023
| Trade | Rate | Fringe | Total |
| IRONWORKER | $43.00 | $34.11 | $77.11 |
LABO0132-001 Effective 05/01/2008
| Trade | Rate | Fringe | Total |
| LANDSCAPER: SEEDING, SODDING , PLANTING OF EVERGREEN & DECIDUOUS SHRUBS & TREES ON ALL WORK, EXCEPT RESIDENTIAL OF 4 UNITS OR LESS (MCLEOD COUNTY) | $16.26 | $9.68 | $25.94 |
LABO0132-005 Effective 05/09/2016
| Trade | Rate | Fringe | Total |
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 4 FLAGPERSON (MCLEOD COUNTY) | $19.17 | $15.79 | $34.96 |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 4 FLAGPERSON (MCLEOD COUNTY) | $20.84 | $16.57 | $37.41 |
LABO0132-008 Effective 01/01/2017
| Trade | Rate | Fringe | Total |
| LABORER (ASBESTOS ABATEMENT) | $30.83 | $17.61 | $48.44 |
LABO0132-017 Effective 05/09/2016
| Trade | Rate | Fringe | Total |
| PLASTER TENDER | $21.97 | $15.79 | $37.76 |
LABO0563-004 Effective 01/01/2021
| Trade | Rate | Fringe | Total |
| LANDSCAPER: SEEDING, SODDING , PLANTING OF EVERGREEN & DECIDUOUS SHRUBS & TREES ON ALL WORK, EXCEPT RESIDENTIAL OF 4 UNITS OR LESS (SIBLEY COUNTY) | $28.25 | $16.20 | $44.45 |
LABO0563-005 Effective 05/01/2012
| Trade | Rate | Fringe | Total |
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 4 FLAGPERSON (SIBLEY COUNTY) | $16.35 | $13.94 | $30.29 |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 4 FLAGPERSON (SIBLEY COUNTY) | $18.04 | $14.70 | $32.74 |
PAIN0386-005 Effective 05/01/2012
| Trade | Rate | Fringe | Total |
| PAINTERS: SPRAY; STEEL; SANDBLASTER; SWING STAGE & EPOXY (MCLEOD) | $31.45 | $17.85 | $49.30 |
| PAINTERS: BRUSH; ROLLER; & WALLPAPER HANGER (MCLEOD) | $31.45 | $17.85 | $49.30 |
PAIN0386-006 Effective 05/01/2012
| Trade | Rate | Fringe | Total |
| DRYWALL: SANDER (MCLEOD) | $22.63 | $18.67 | $41.30 |
| DRYWALL: FINISHER (MCLEOD) | $30.17 | $18.67 | $48.84 |
PAIN0681-003 Effective 05/05/2025
| Trade | Rate | Fringe | Total |
| DRYWALL TAPER/FINISHER (SIBLEY COUNTY) | $19.00 | $25.79 | $44.79 |
PAIN0681-009 Effective 05/01/2025
| Trade | Rate | Fringe | Total |
| PAINTERS: 4 STORIES: BRUSH & ROLLER (SIBLEY COUNTY) PAPERHANGER - $0.25 PER HOUR ADDITIONAL. SPRAY - CREOSOTE, OTHER TOXIC MATERIALS - $0.25 PER HOUR ADDITIONAL | $35.28 | $25.49 | $60.77 |
| PAINTERS: 1 TO 3 STORIES: BRUSH & ROLLER (SIBLEY COUNTY) PAPERHANGER - $0.25 PER HOUR ADDITIONAL. SPRAY - $0.50 PER HOUR ADDITIONAL APPLICATION OF EPOXY, CREOSOTE, OTHER TOXIC MATERIALS - $0.25 PER HOUR ADDITIONAL | $19.00 | $3.00 | $22.00 |
PAIN1324-003 Effective 06/02/2025
| Trade | Rate | Fringe | Total |
| GLAZIER | $50.98 | $27.35 | $78.33 |
PLAS0265-003 Effective 06/01/2025
| Trade | Rate | Fringe | Total |
| PLASTERER | $42.52 | $30.37 | $72.89 |
PLAS0633-006 Effective 05/01/2023
| Trade | Rate | Fringe | Total |
| CEMENT MASON/CONCRETE FINISHER | $46.46 | $23.47 | $69.93 |
PLUM0015-003 Effective 05/01/2025
| Trade | Rate | Fringe | Total |
| PLUMBER (MCLEOD) FOOTNOTE: PAID HOLIDAY: LABOR DAY | $59.54 | $33.26 | $92.80 |
PLUM0034-008 Effective 05/01/2025
| Trade | Rate | Fringe | Total |
| PLUMBER: INCLUDES GAS FITTERS FOOTNOTE: PAID HOLIDAY: LABOR DAY | $36.78 | $34.51 | $71.29 |
PLUM0455-009 Effective 05/01/2024
| Trade | Rate | Fringe | Total |
| PIPEFITTER (SIBLEY COUNTY) | $37.05 | $30.27 | $67.32 |
PLUM0539-003 Effective 05/01/2024
| Trade | Rate | Fringe | Total |
| PIPEFITTER (MCLEOD) | $48.33 | $40.46 | $88.79 |
ROOF0096-007 Effective 05/05/2025
| Trade | Rate | Fringe | Total |
| ROOFER FOOTNOTE: PAID HOLIDAY - LABOR DAY | $48.32 | $25.54 | $73.86 |
SFMN0669-003 Effective 01/01/2025
| Trade | Rate | Fringe | Total |
| SPRINKLER FITTER | $42.94 | $27.26 | $70.20 |
SHEE0010-006 Effective 05/01/2025
| Trade | Rate | Fringe | Total |
| SHEET METAL WORKER FOOTNOTE: PAID HOLIDAY - LABOR DAY | $45.01 | $26.53 | $71.54 |
No trade rates match your search.