MO20260005

Building

Davis-Bacon Act general wage determination for building construction in Missouri.

Modification 0, revised 05/18/2026 31 trade rates 1 county View on SAM.gov

Track MO20260005

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ASBE0063-002 Effective 11/01/2024
Trade Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR $31.97 $14.00 $45.97
BRMO0011-009 Effective 04/01/2023
Trade Rate Fringe Total
TILE SETTER $32.79 $21.31 $54.10
CARP0005-010 Effective 05/01/2024
Trade Rate Fringe Total
CARPENTER (INCLUDING DRYWALL HANGING & FORM WORK) $31.51 $22.25 $53.76
CARP0005-012 Effective 05/01/2024
Trade Rate Fringe Total
CARPENTER (FLOOR LAYER) (RESILIENT/VINYL FLOOR INSTALLATION ONLY) $31.39 $22.25 $53.64
ENGI0101-004 Effective 04/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: ROLLER $30.91 $18.07 $48.98
POWER EQUIPMENT OPERATOR: GRADER/BLADE $31.62 $18.07 $49.69
POWER EQUIPMENT OPERATOR: BULLDOZER $31.62 $18.07 $49.69
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $33.41 $18.07 $51.48
POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (PAVER) $27.91 $18.07 $45.98
POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (LOADER) $31.62 $18.07 $49.69
IRON0396-017 Effective 08/07/2024
Trade Rate Fringe Total
IRONWORKER, STRUCTURAL $41.67 $31.25 $72.92
LABO0663-010 Effective 04/01/2024
Trade Rate Fringe Total
LABORER (COMMON OR GENERAL & LANDSCAPE) $26.35 $13.01 $39.36
LABORER (BRICK MASON TENDER) $29.08 $13.01 $42.09
PAIN1185-005 Effective 04/01/2025
Trade Rate Fringe Total
PAINTER: DRYWALL FINISHING/TAPING $33.90 $17.21 $51.11
PLAS0518-020 Effective 03/01/2025
Trade Rate Fringe Total
CEMENT MASON/CONCRETE FINISHER $33.52 $15.88 $49.40
PLUM0562-011 Effective 07/01/2025
Trade Rate Fringe Total
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) $50.66 $23.34 $74.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) $52.60 $29.93 $82.53
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) $50.66 $23.34 $74.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) $52.60 $29.93 $82.53
ROOF0020-012 Effective 09/19/2023
Trade Rate Fringe Total
ROOFER $33.60 $19.99 $53.59
SFMO0669-003 Effective 04/01/2025
Trade Rate Fringe Total
SPRINKLER FITTER (FIRE SPRINKLERS) $45.94 $27.53 $73.47
SHEE0002-019 Effective 07/01/2023
Trade Rate Fringe Total
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $47.20 $26.28 $73.48
SUMO2010-004 Effective 03/08/2010
Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK $25.57 $0.00 $25.57
PAINTER: SPRAY $18.79 $8.12 $26.91
PAINTER: ROLLER $18.79 $8.12 $26.91
PAINTER: BRUSH ONLY $18.79 $8.12 $26.91
LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS) $24.90 $0.00 $24.90
IRONWORKER, REINFORCING $21.02 $9.49 $30.51
GLAZIER $29.87 $1.47 $31.34
ELECTRICIAN $25.82 $8.24 $34.06
BRICKLAYER $27.66 $5.88 $33.54

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Missouri.

Get notified when MO20260005 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.