MO20260009
BuildingDavis-Bacon Act general wage determination for building construction in Missouri.
Track MO20260009
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0027-004 Effective 10/06/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $45.60 | $35.47 | $81.07 |
BRMO0011-001 Effective 04/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $32.79 | $21.31 | $54.10 |
| BRICKLAYER | $32.79 | $21.31 | $54.10 |
CARP0010-005 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER, EXCLUDES FORM WORK | $31.51 | $22.25 | $53.76 |
ELEC0257-011 Effective 03/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $40.50 | $23.26 | $63.76 |
ENGI0101-021 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: (PAVER) | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: (LOADER) | $45.48 | $22.42 | $67.90 |
IRON0010-004 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: REINFORCING AND STRUCTURAL | $36.00 | $34.25 | $70.25 |
LABO0955-002 Effective 03/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER (LANDSCAPE) | $27.71 | $15.50 | $43.21 |
| LABORER (BRICK MASON TENDER) | $29.71 | $15.50 | $45.21 |
PAIN1185-002 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER (BRUSH & ROLLER ONLY) | $28.56 | $17.21 | $45.77 |
PLUM0562-011 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 |
ROOF0020-001 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $38.45 | $22.29 | $60.74 |
SHEE0002-017 Effective 07/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $47.20 | $26.28 | $73.48 |
SUMO2010-008 Effective 03/08/2010 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $28.92 | $0.00 | $28.92 |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 |
| OPERATOR: BACKHOE/TRACKHOE | $31.12 | $0.00 | $31.12 |
| LABORER: COMMON OR GENERAL | $23.20 | $0.00 | $23.20 |
| GLAZIER | $14.19 | $5.19 | $19.38 |
| FORM WORKER | $26.44 | $0.00 | $26.44 |
| CEMENT MASON/CONCRETE FINISHER | $18.86 | $7.50 | $26.36 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 1 | 01/30/2026 |
| 2 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Missouri.
Get notified when MO20260009 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.