MO20260012

Building

Davis-Bacon Act general wage determination for building construction in Missouri.

Modification 2, revised 05/18/2026 26 trade rates 1 county View on SAM.gov

Track MO20260012

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ASBE0027-004 Effective 10/06/2025
Trade Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR $45.60 $35.47 $81.07
BRMO0003-005 Effective 06/01/2023
Trade Rate Fringe Total
TILE SETTER $40.53 $15.99 $56.52
BRMO0015-010 Effective 04/01/2023
Trade Rate Fringe Total
BRICKLAYER $39.85 $21.70 $61.55
CARP0005-014 Effective 05/01/2024
Trade Rate Fringe Total
CARPENTER (DRYWALL HANGING, FORM WORK & METAL STUD INSTALLATION ONLY) $42.06 $22.40 $64.46
ELEC0124-019 Effective 08/26/2024
Trade Rate Fringe Total
ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS) $51.01 $26.25 $77.26
ENGI0101-012 Effective 04/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: ROLLER $45.48 $22.42 $67.90
POWER EQUIPMENT OPERATOR: GRADER/BLADE $45.48 $22.42 $67.90
POWER EQUIPMENT OPERATOR: (LOADER) $45.48 $22.42 $67.90
IRON0010-030 Effective 04/01/2025
Trade Rate Fringe Total
IRONWORKER: REINFORCING AND STRUCTURAL $39.00 $34.25 $73.25
LABO0663-001 Effective 04/01/2025
Trade Rate Fringe Total
LABORER (LANDSCAPE) $26.50 $13.18 $39.68
LABORER (BRICK MASON TENDER) $28.00 $13.18 $41.18
PAIN0003-018 Effective 04/01/2019
Trade Rate Fringe Total
PAINTER (DRYWALL FINISHING/TAPING ONLY) $31.74 $17.76 $49.50
PAINTER (BRUSH & ROLLER ONLY) $30.54 $17.76 $48.30
PLUM0008-001 Effective 06/01/2025
Trade Rate Fringe Total
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $58.38 $25.29 $83.67
PLUM0533-008 Effective 06/01/2025
Trade Rate Fringe Total
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $57.51 $28.35 $85.86
ROOF0020-001 Effective 06/01/2024
Trade Rate Fringe Total
ROOFER $38.45 $22.29 $60.74
SHEE0002-014 Effective 07/01/2023
Trade Rate Fringe Total
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $50.43 $26.96 $77.39
SUMO2010-011 Effective 03/08/2010
Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK $28.92 $0.00 $28.92
PAINTER: SPRAY $18.79 $8.12 $26.91
OPERATOR: WATER TRUCK $28.37 $0.00 $28.37
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) $24.47 $0.00 $24.47
OPERATOR: BACKHOE/TRACKHOE $23.55 $7.47 $31.02
LABORER: COMMON OR GENERAL $16.18 $7.12 $23.30
GLAZIER $22.71 $0.00 $22.71
CEMENT MASON/CONCRETE FINISHER $17.95 $6.64 $24.59
CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION $23.33 $7.42 $30.75

Modification History

Modification Publication Date
1 01/30/2026
2 05/18/2026

Counties Covered

This wage determination applies to 1 county in Missouri.

Get notified when MO20260012 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.