MO20260013

Building

Davis-Bacon Act general wage determination for building construction in Missouri.

Modification 1, revised 05/18/2026 27 trade rates 1 county View on SAM.gov

Track MO20260013

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ASBE0063-002 Effective 11/01/2024
Trade Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR $31.97 $14.00 $45.97
BRMO0015-004 Effective 04/01/2023
Trade Rate Fringe Total
BRICKLAYER $33.67 $19.48 $53.15
BRMO0015-018 Effective 06/01/2023
Trade Rate Fringe Total
TILE SETTER $26.47 $14.89 $41.36
CARP0311-004 Effective 05/01/2024
Trade Rate Fringe Total
CARPENTER (DRYWALL HANGING, FORM WORK & METAL STUD INSTALLATION ONLY) $29.50 $21.50 $51.00
ELEC0095-007 Effective 06/01/2025
Trade Rate Fringe Total
ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS) $32.25 $20.81 $53.06
ENGI0101-008 Effective 04/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: ROLLER $30.91 $18.07 $48.98
POWER EQUIPMENT OPERATOR: GRADER/BLADE $31.62 $18.07 $49.69
POWER EQUIPMENT OPERATOR: BULLDOZER $31.62 $18.07 $49.69
POWER EQUIPMENT OPERATOR: (LOADER) $31.62 $18.07 $49.69
IRON0010-004 Effective 04/01/2025
Trade Rate Fringe Total
IRONWORKER: REINFORCING AND STRUCTURAL $36.00 $34.25 $70.25
LABO0663-007 Effective 04/01/2025
Trade Rate Fringe Total
LABORER (LANDSCAPE) $27.05 $13.62 $40.67
PAIN2015-005 Effective 05/01/2024
Trade Rate Fringe Total
PAINTER: DRYWALL FINISHING/TAPING ONLY (DADE, DOUGLAS, HICKORY, OZARK, ST. CLAIR, STONE, & TANEY COUNTIES) $25.79 $15.35 $41.14
PLUM0178-009 Effective 11/01/2024
Trade Rate Fringe Total
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $39.35 $15.72 $55.07
ROOF0020-003 Effective 02/01/2025
Trade Rate Fringe Total
ROOFER $30.73 $14.51 $45.24
SHEE0036-029 Effective 07/01/2025
Trade Rate Fringe Total
SHEETMETAL WORKER (HVAC DUCT AND UNIT INSTALLATION ONLY) $34.43 $17.86 $52.29
SUMO2010-012 Effective 03/08/2010
Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK $28.92 $0.00 $28.92
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION $23.31 $9.05 $32.36
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $22.25 $9.77 $32.02
PAINTER: SPRAY $18.79 $8.12 $26.91
OPERATOR: WATER TRUCK $28.37 $0.00 $28.37
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) $24.47 $0.00 $24.47
OPERATOR: BACKHOE/TRACKHOE $19.80 $7.47 $27.27
LABORER: MASON TENDER - BRICK $15.80 $7.31 $23.11
LABORER: COMMON OR GENERAL $14.99 $6.99 $21.98
GLAZIER $20.26 $2.45 $22.71
CEMENT MASON/CONCRETE FINISHER $17.95 $6.64 $24.59
CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION $18.22 $7.85 $26.07

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Missouri.

Get notified when MO20260013 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.