MO20260019
BuildingDavis-Bacon Act general wage determination for building construction in Missouri.
Track MO20260019
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0063-002 Effective 11/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $31.97 | $14.00 | $45.97 |
BRMO0011-009 Effective 04/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $32.79 | $21.31 | $54.10 |
CARP0012-002 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INCLUDING DRYWALL HANGING & FORM WORK) | $44.19 | $21.85 | $66.04 |
CARP1310-003 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (FLOOR LAYER) (RESILIENT & VINYL FLOORING ONLY) | $40.08 | $21.85 | $61.93 |
ELEC0453-003 Effective 09/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $39.70 | $19.84 | $59.54 |
ENGI0513-001 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $35.76 | $30.38 | $66.14 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATOR: (PAVER) | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/ TRACKHOE) | $39.06 | $30.38 | $69.44 |
IRON0396-017 Effective 08/07/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, STRUCTURAL | $41.67 | $31.25 | $72.92 |
LABO0840-003 Effective 03/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER (COMMON OR GENERAL & LANDSCAPE) | $30.33 | $15.30 | $45.63 |
| LABORER (BRICK MASON TENDER) | $32.23 | $15.30 | $47.53 |
PAIN1185-005 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: DRYWALL FINISHING/TAPING | $33.90 | $17.21 | $51.11 |
PAIN1185-013 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER (BRUSH & ROLLER ONLY) | $33.90 | $17.21 | $51.11 |
PLAS0527-006 Effective 04/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $36.63 | $9.85 | $46.48 |
PLUM0562-011 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 |
ROOF0020-012 Effective 09/19/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $33.60 | $19.99 | $53.59 |
SFMO0669-003 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER (FIRE SPRINKLERS) | $45.94 | $27.53 | $73.47 |
SHEE0036-010 Effective 08/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION ONLY) | $52.00 | $27.12 | $79.12 |
SUMO2010-018 Effective 03/08/2010 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $25.57 | $0.00 | $25.57 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $23.65 | $4.50 | $28.15 |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 |
| LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS) | $24.90 | $0.00 | $24.90 |
| IRONWORKER, REINFORCING | $20.90 | $8.88 | $29.78 |
| GLAZIER | $29.87 | $1.47 | $31.34 |
| BRICKLAYER | $23.65 | $7.92 | $31.57 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Missouri.
Get notified when MO20260019 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.