MO20260056
BuildingDavis-Bacon Act general wage determination for building construction in Missouri.
Track MO20260056
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
BOIL0027-001 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $46.00 | $36.25 | $82.25 |
BRMO0001-008 Effective 06/04/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $41.15 | $23.90 | $65.05 |
BRMO0018-007 Effective 07/05/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $34.09 | $19.91 | $54.00 |
| TILE FINISHER | $28.50 | $18.15 | $46.65 |
CARP0012-001 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INCLUDING DRYWALL HANGING & FORM WORK) | $44.19 | $21.85 | $66.04 |
CARP1310-001 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (FLOOR LAYING-CARPET AND VINYL ONLY) | $40.08 | $21.85 | $61.93 |
ELEC0257-002 Effective 03/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING INSTALLER; ALARM, COMPUTER & TELEPHONE INSTALLATION) | $40.50 | $23.26 | $63.76 |
ENGI0513-005 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: ROLLER | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATORS: PAVER | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATORS: LOADER | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATORS: GRADER/BLADE | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATORS: FORKLIFT | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATORS: CRANE | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATORS: BOBCAT/SKID LOADER | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATORS: BACKHOE/EXCAVATOR | $39.06 | $30.38 | $69.44 |
IRON0396-007 Effective 08/07/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL | $41.67 | $31.25 | $72.92 |
LABO0840-006 Effective 03/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: COMMON OR GENERAL; ASPHALT SHOVELER; PIPELAYER | $30.33 | $15.30 | $45.63 |
| LABORER: BRICK & CEMENT/CONCRETE MASON TENDER | $32.23 | $15.30 | $47.53 |
PAIN0513-001 Effective 11/01/2020 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| GLAZIER | $40.00 | $24.25 | $64.25 |
PAIN1185-009 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER (DRYWALL FINISHING/TAPING) | $34.90 | $17.21 | $52.11 |
| PAINTER (BRUSH AND ROLLER) | $33.90 | $17.21 | $51.11 |
PLAS0527-009 Effective 04/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $36.63 | $9.85 | $46.48 |
PLUM0562-008 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION) | $50.60 | $30.13 | $80.73 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER) | $48.66 | $22.79 | $71.45 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION) | $50.60 | $30.13 | $80.73 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER) | $48.66 | $22.79 | $71.45 |
ROOF0002-001 Effective 03/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $40.00 | $22.05 | $62.05 |
SFMO0669-004 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER (FIRE SPRINKLERS) | $45.94 | $27.52 | $73.46 |
SHEE0036-001 Effective 08/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $52.00 | $27.12 | $79.12 |
SUMO2023-001 Effective 06/14/2010 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: SPRAY | $17.78 | $0.00 | $17.78 |
| OPERATOR: HOIST | $26.02 | $13.01 | $39.03 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Missouri.
Get notified when MO20260056 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.