MO20260067
ResidentialDavis-Bacon Act general wage determination for residential construction in Missouri.
Track MO20260067
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
BRMO0015-019 Effective 04/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $32.79 | $21.31 | $54.10 |
ELEC0257-013 Effective 03/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $18.23 | $9.91 | $28.14 |
ENGI0101-036 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER (HOWARD COUNTY) | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR (HOWARD COUNTY) | $45.48 | $22.42 | $67.90 |
ENGI0513-021 Effective 05/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER (BOONE COUNTY) | $34.61 | $29.50 | $64.11 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR (BOONE COUNTY) | $34.61 | $29.50 | $64.11 |
LABO0955-010 Effective 03/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: COMMON OR GENERAL | $23.94 | $15.80 | $39.74 |
| LABORER (BRICK MASON TENDER) | $23.94 | $15.80 | $39.74 |
PAIN1185-007 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER (BRUSH AND ROLLER) | $28.56 | $17.21 | $45.77 |
PLUM0562-003 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER (MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION) | $50.60 | $29.38 | $79.98 |
| PLUMBER (MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER) | $50.60 | $29.38 | $79.98 |
ROOF0020-012 Effective 09/19/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $33.60 | $19.99 | $53.59 |
SHEE0002-032 Effective 07/01/2011 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER: INCLUDING HVAC DUCT AND HVAC SYSTEM (HOWARD COUNTY) | $27.37 | $8.14 | $35.51 |
SHEE0036-031 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER: INCLUDING HVAC DUCT AND HVAC SYSTEM (BOONE COUNTY) | $36.51 | $22.39 | $58.90 |
SUMO2011-011 Effective 08/11/2011 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $16.00 | $0.00 | $16.00 |
| CARPENTER | $18.33 | $1.32 | $19.65 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 2 counties in Missouri.
Get notified when MO20260067 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.