MO20260082

Building

Davis-Bacon Act general wage determination for building construction in Missouri.

Modification 2, revised 05/18/2026 24 trade rates 6 counties View on SAM.gov

Track MO20260082

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ASBE0027-006 Effective 10/07/2024
Trade Rate Fringe Total
HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) $43.60 $33.52 $77.12
BRMO0015-021 Effective 06/01/2023
Trade Rate Fringe Total
BRICKLAYER $40.53 $16.69 $57.22
BRMO0018-003 Effective 07/05/2023
Trade Rate Fringe Total
TILE SETTER $34.09 $20.36 $54.45
CARP1011-005 Effective 05/01/2024
Trade Rate Fringe Total
CARPENTER $44.63 $22.40 $67.03
ELEC0124-012 Effective 09/01/2025
Trade Rate Fringe Total
ELECTRICIAN $54.01 $27.85 $81.86
ELEC0124-013 Effective 11/25/2024
Trade Rate Fringe Total
ELECTRICIAN (COMMUNICATION TECHNICIAN) $48.23 $25.35 $73.58
ENGI0101-052 Effective 04/01/2025
Trade Rate Fringe Total
OPERATOR: FORKLIFT $44.14 $22.42 $66.56
ENGI0101-053 Effective 04/01/2025
Trade Rate Fringe Total
OPERATOR: CRANE $47.29 $22.42 $69.71
ENGI0101-054 Effective 04/01/2025
Trade Rate Fringe Total
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $45.48 $22.42 $67.90
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $45.48 $22.42 $67.90
ENGI0513-026 Effective 05/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: OILER $39.06 $30.38 $69.44
ENGI0513-027 Effective 05/07/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: BULLDOZER $45.96 $30.57 $76.53
IRON0010-003 Effective 04/01/2025
Trade Rate Fringe Total
IRONWORKER $39.00 $34.25 $73.25
LABO0110-007 Effective 06/04/2025
Trade Rate Fringe Total
LABORER: PIPELAYER $40.82 $17.56 $58.38
LABO0264-009 Effective 04/01/2023
Trade Rate Fringe Total
LABORER: COMMON OR GENERAL $31.60 $18.25 $49.85
LABO1104-007 Effective 03/01/2025
Trade Rate Fringe Total
LABORER: MASON TENDER - CEMENT/CONCRETE $31.80 $14.91 $46.71
PLAS0518-015 Effective 04/01/2025
Trade Rate Fringe Total
CEMENT MASON/CONCRETE FINISHER $40.13 $20.50 $60.63
PLUM0008-021 Effective 06/01/2025
Trade Rate Fringe Total
PLUMBER $58.38 $25.29 $83.67
PLUM0533-014 Effective 06/01/2025
Trade Rate Fringe Total
PIPEFITTER $57.51 $28.35 $85.86
ROOF0020-023 Effective 06/01/2024
Trade Rate Fringe Total
ROOFER $38.45 $22.29 $60.74
SFMO0314-002 Effective 10/01/2024
Trade Rate Fringe Total
SPRINKLER FITTER $45.85 $25.50 $71.35
SHEE0002-036 Effective 07/01/2023
Trade Rate Fringe Total
SHEET METAL WORKER $50.43 $26.45 $76.88
SUMO2020-011 Effective 10/10/2023
Trade Rate Fringe Total
PAINTER $24.14 $9.67 $33.81
OPERATOR: LOADER $38.39 $17.55 $55.94

Modification History

Modification Publication Date
1 01/30/2026
2 05/18/2026

Counties Covered

This wage determination applies to 6 counties in Missouri.

Get notified when MO20260082 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.