MO20260086
BuildingDavis-Bacon Act general wage determination for building construction in Missouri.
Track MO20260086
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
BRMO0001-009 Effective 06/04/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $41.15 | $23.90 | $65.05 |
BRMO0018-003 Effective 07/05/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $34.09 | $20.36 | $54.45 |
CARP1011-006 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER | $29.50 | $21.50 | $51.00 |
ELEC0095-005 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $32.25 | $20.81 | $53.06 |
ENGI0101-053 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: CRANE | $47.29 | $22.42 | $69.71 |
ENGI0513-023 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: FORKLIFT | $43.46 | $30.22 | $73.68 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $43.46 | $30.22 | $73.68 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $43.46 | $30.22 | $73.68 |
ENGI0513-026 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: OILER | $39.06 | $30.38 | $69.44 |
ENGI0513-027 Effective 05/07/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BULLDOZER | $45.96 | $30.57 | $76.53 |
IRON0010-003 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER | $39.00 | $34.25 | $73.25 |
LABO0110-007 Effective 06/04/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: PIPELAYER | $40.82 | $17.56 | $58.38 |
LABO1104-007 Effective 03/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: MASON TENDER - CEMENT/CONCRETE | $31.80 | $14.91 | $46.71 |
PLUM0178-004 Effective 11/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PIPEFITTER | $39.35 | $15.72 | $55.07 |
PLUM0562-019 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER | $52.60 | $29.93 | $82.53 |
SHEE0036-037 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER | $34.43 | $17.86 | $52.29 |
SUMO2020-015 Effective 10/10/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $29.48 | $13.19 | $42.67 |
| PAINTER | $20.78 | $5.15 | $25.93 |
| LABORER: COMMON OR GENERAL | $20.49 | $10.76 | $31.25 |
| CEMENT MASON/CONCRETE FINISHER | $31.40 | $18.32 | $49.72 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 4 counties in Missouri.
Get notified when MO20260086 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.