NM20260022

Building

Davis-Bacon Act general wage determination for building construction in New Mexico.

Modification 1, revised 05/18/2026 39 trade rates 1 county View on SAM.gov

Track NM20260022

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

CARP1353-007 Effective 06/01/2018
Trade Rate Fringe Total
CARPENTER (EXCLUDING ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, AND FORMWORK) $24.08 $10.79 $34.87
ELEC0611-017 Effective 01/01/2025
Trade Rate Fringe Total
ELECTRICIAN $46.35 $13.65 $60.00
ENGI0953-010 Effective 01/01/2024
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID L27.70ADER) $27.70 $4.65 $32.35
POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION)) $26.75 $4.65 $31.40
IRON0495-008 Effective 01/01/2023
Trade Rate Fringe Total
IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL $28.05 $18.11 $46.16
LABO0016-005 Effective 06/01/2024
Trade Rate Fringe Total
LABORER, MASON TENDER BRICK $23.69 $7.89 $31.58
PLUM0412-007 Effective 01/02/2025
Trade Rate Fringe Total
PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) $43.07 $16.60 $59.67
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION $43.07 $16.60 $59.67
SHEE0049-012 Effective 01/01/2024
Trade Rate Fringe Total
SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) $37.50 $18.51 $56.01
SUNM2010-010 Effective 11/09/2010
Trade Rate Fringe Total
TRUCK DRIVER: WATER TRUCK $15.16 $4.69 $19.85
TRUCK DRIVER: PICKUP TRUCK $15.91 $3.13 $19.04
TRUCK DRIVER: DUMP TRUCK $11.00 $0.00 $11.00
TILE SETTER $14.30 $1.02 $15.32
TILE FINISHER $14.02 $0.00 $14.02
SPRINKLER FITTER (FIRE SPRINKLERS) $20.00 $4.16 $24.16
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION $22.01 $9.65 $31.66
ROOFER $18.84 $0.00 $18.84
PLASTERER $17.65 $5.29 $22.94
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING $16.10 $1.79 $17.89
OPERATOR: LOADER (FRONT END) $19.76 $4.84 $24.60
OPERATOR: GRADER/BLADE $20.33 $4.94 $25.27
OPERATOR: FORKLIFT $20.86 $4.60 $25.46
OPERATOR: CRANE $24.38 $4.60 $28.98
OPERATOR: BACKHOE $18.79 $3.47 $22.26
LABORER: PIPELAYER $13.78 $2.20 $15.98
LABORER: MASON TENDER - CEMENT/CONCRETE $11.51 $0.85 $12.36
LABORER: LANDSCAPE & IRRIGATION $12.42 $1.47 $13.89
LABORER: COMMON OR GENERAL $12.99 $3.56 $16.55
LABORER: ASPHALT RAKER $10.25 $0.00 $10.25
GLAZIER $20.15 $3.63 $23.78
FLOOR LAYER: CARPET $18.05 $4.49 $22.54
DRYWALL FINISHER/TAPER $13.00 $0.00 $13.00
CEMENT MASON/CONCRETE FINISHER $16.27 $3.94 $20.21
CARPENTER (FORM WORK ONLY) $18.80 $5.61 $24.41
CARPENTER (DRYWALL HANGING ONLY) $19.13 $0.00 $19.13
CARPENTER (BATT INSULATION ONLY) $26.07 $5.96 $32.03
BRICKLAYER $20.80 $5.10 $25.90
BOILERMAKER $21.77 $3.98 $25.75
ACOUSTICAL CEILING MECHANIC $12.00 $0.00 $12.00

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in New Mexico.

Get notified when NM20260022 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.