NM20260023

Building

Davis-Bacon Act general wage determination for building construction in New Mexico.

Modification 1, revised 05/18/2026 41 trade rates 1 county View on SAM.gov

Track NM20260023

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

CARP1245-004 Effective 06/01/2018
Trade Rate Fringe Total
CARPENTER (METAL STUD INSTALLATION ONLY) $24.08 $10.79 $34.87
ELEC0583-009 Effective 01/01/2025
Trade Rate Fringe Total
ELECTRICIAN (EXCLUDING LOW VOLTAGE WIRING FOR ALARMS) $38.00 $9.82 $47.82
ENGI0953-011 Effective 01/01/2024
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR ((8)CRANE) $31.43 $4.65 $36.08
POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER, LOADER (FRONT END)) $27.70 $4.65 $32.35
IRON0495-009 Effective 01/01/2023
Trade Rate Fringe Total
IRONWORKER: ORNAMENTAL $28.05 $18.11 $46.16
IRONWORKER, STRUCTURAL (METAL BUILDING ERECTION ONLY) $28.05 $18.11 $46.16
PLUM0412-007 Effective 01/02/2025
Trade Rate Fringe Total
PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) $43.07 $16.60 $59.67
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION $43.07 $16.60 $59.67
SHEE0049-012 Effective 01/01/2024
Trade Rate Fringe Total
SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY) $37.50 $18.51 $56.01
SUNM2010-011 Effective 11/09/2010
Trade Rate Fringe Total
TRUCK DRIVER: WATER TRUCK $16.25 $5.00 $21.25
TRUCK DRIVER: PICKUP TRUCK $15.91 $3.13 $19.04
TRUCK DRIVER: DUMP TRUCK $15.36 $5.00 $20.36
TILE SETTER $19.00 $0.00 $19.00
TILE FINISHER $14.02 $0.00 $14.02
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $22.01 $9.65 $31.66
ROOFER $13.24 $0.50 $13.74
PLASTERER $17.65 $7.15 $24.80
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING $16.58 $1.75 $18.33
OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) $16.80 $4.43 $21.23
OPERATOR: GRADER/BLADE $21.39 $4.94 $26.33
OPERATOR: FORKLIFT $21.13 $4.83 $25.96
OPERATOR: BACKHOE $22.13 $4.30 $26.43
LABORER: PIPELAYER $13.78 $2.20 $15.98
LABORER: MASON TENDER - CEMENT/CONCRETE $11.51 $0.85 $12.36
LABORER: MASON TENDER - BRICK $13.77 $4.35 $18.12
LABORER: LANDSCAPE & IRRIGATION $10.60 $0.24 $10.84
LABORER: COMMON OR GENERAL $13.12 $3.79 $16.91
IRONWORKER, STRUCTURAL, EXCLUDES METAL BUILDING ERECTION $22.20 $8.06 $30.26
IRONWORKER, REINFORCING $20.84 $7.68 $28.52
INSULATOR - BATT $24.44 $8.43 $32.87
GLAZIER $20.15 $3.95 $24.10
FLOOR LAYER: CARPET $22.31 $0.30 $22.61
DRYWALL FINISHER/TAPER $19.64 $2.75 $22.39
CEMENT MASON/CONCRETE FINISHER $17.72 $3.72 $21.44
ELECTRICIAN (Low Voltage Wiring for Alarms) $28.25 $6.62 $34.87
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION $20.86 $1.30 $22.16
CARPENTER (FORM WORK ONLY) $19.79 $6.14 $25.93
CARPENTER (DRYWALL HANGING ONLY) $21.39 $2.85 $24.24
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) $20.79 $0.00 $20.79
BRICKLAYER $20.36 $5.74 $26.10
BOILERMAKER $21.77 $3.98 $25.75

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in New Mexico.

Get notified when NM20260023 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.