NM20260034
HighwayDavis-Bacon Act general wage determination for highway construction in New Mexico.
Track NM20260034
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ELEC0611-003 Effective 07/01/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (BOOM OPERATOR) | $29.79 | $12.74 | $42.53 |
SUNM2011-002 Effective 08/25/2011 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: WATER TRUCK | $12.96 | $0.26 | $13.22 |
| TRUCK DRIVER: DUMP TRUCK | $15.04 | $0.26 | $15.30 |
| TRUCK DRIVER (PICKUP TRUCK) | $12.95 | $0.26 | $13.21 |
| TRUCK DRIVER (FLATBED TRUCK) | $13.51 | $0.26 | $13.77 |
| POWER EQUIPMENT OPERATOR: OILER | $22.08 | $8.72 | $30.80 |
| POWER EQUIPMENT OPERATOR: MECHANIC | $23.24 | $1.51 | $24.75 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) | $16.43 | $0.26 | $16.69 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $17.64 | $1.51 | $19.15 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER | $16.67 | $1.57 | $18.24 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER | $12.00 | $0.26 | $12.26 |
| POWER EQUIPMENT OPERATOR: (TRENCHER) | $15.22 | $0.26 | $15.48 |
| POWER EQUIPMENT OPERATOR: (ROLLER (ASPHALT AND DIRT)) | $16.27 | $1.51 | $17.78 |
| POWER EQUIPMENT OPERATOR: (PILEDRIVER) | $15.73 | $0.26 | $15.99 |
| POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/TRACKHOE) | $17.20 | $0.26 | $17.46 |
| POWER EQUIPMENT OPERATOR: LABORER: PIPELAYER | $17.13 | $5.04 | $22.17 |
| POWER EQUIPMENT OPERATOR: LABORER: MASON TENDER-CEMENT/CONCRETE | $10.25 | $0.35 | $10.60 |
| POWER EQUIPMENT OPERATOR: LABORER: COMMON OR GENERAL | $11.21 | $0.35 | $11.56 |
| POWER EQUIPMENT OPERATOR: LABORER (FLAGGER/CONE SETTER) | $13.55 | $0.35 | $13.90 |
| POWER EQUIPMENT OPERATOR: IRONWORKER, REINFORCING | $22.44 | $5.85 | $28.29 |
| POWER EQUIPMENT OPERATOR: HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER | $14.75 | $0.35 | $15.10 |
| POWER EQUIPMENT OPERATOR: ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION AND INSTALLATION) | $25.06 | $8.56 | $33.62 |
| POWER EQUIPMENT OPERATOR: CEMENT MASON/CONCRETE FINISHER | $14.60 | $0.26 | $14.86 |
| POWER EQUIPMENT OPERATOR: CARPENTER (INCLUDES FORM WORK) | $13.88 | $0.44 | $14.32 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in New Mexico.
Get notified when NM20260034 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.