CARP1977-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INCLUDING FORM WORK) | $57.69 | $21.53 | $79.22 |
ELEC0396-002 Effective 06/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LINE CONSTRUCTION (GROUNDMAN) | $38.74 | $19.36 | $58.10 |
ELEC1245-003 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LINE CONSTRUCTION (LINEMAN) | $70.16 | $24.71 | $94.87 |
ENGI0003-016 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 08 LOADER | $49.61 | $30.38 | $79.99 |
| POWER EQUIPMENT OPERATOR: GROUP 07 SCREED/SCREEDMAN (EXCEPT ASPHALTIC OR CONCRETE PAVING); (BARBER-GREENE AND SIMILAR) (ASPHALTIC OR CONCRETE PAVING) | $49.02 | $30.38 | $79.40 |
| POWER EQUIPMENT OPERATOR GROUP 11A POWER SHOVELS, CLAMSHELLS, DRAGLINES, BACKHOES AND GRADALLS {OVER SEVEN (7] CU. YDS. M.R.C.) {ASSISTANT TO ENGINEER REQUIRED; AN ADDITIONAL ASSISTANT TO ENGINEER IS REQUIRED IF THE SHOVEL OR DRAGLINE IS ELECTRICALLY POWERED) | $52.35 | $30.38 | $82.73 |
| POWER EQUIPMENT OPERATOR GROUP 11 POWER SHOVELS, CLAMSHELLS, DRAGLINES, BACKHOES, GRADALLS (OVER ONE [1] CU. YD. AND UP TO AND INCLUDING SEVEN [7) CU. YDS. M.R.C.) (ASSISTANT TO ENGINEER REQUIRED) (TWO [2) ASSISTANTS TO ENGINEER REQUIRED ON 120B, SIMILAR OR LARGER) | $50.71 | $30.38 | $81.09 |
| POWER EQUIPMENT OPERATOR GROUP 10 GRADESETTER, GRADE CHECKER | $50.28 | $30.38 | $80.66 |
ENGI0003-024 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR ((09) MECHANIC AND BACKHOE LOADER COMBO) | $49.93 | $30.38 | $80.31 |
ENGI0012-014 Effective 01/01/2026 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR, CRANE: GROUP 23 CRANE OPERATOR (OVER 350 TONS) | $72.38 | $36.40 | $108.78 |
| POWER EQUIPMENT OPERATOR, CRANE: GROUP 22 CRANE OPERATOR (OVER 300 TONS UP TO AND INCLUDING 350 TONS) | $71.92 | $36.40 | $108.32 |
| POWER EQUIPMENT OPERATOR, CRANE: GROUP 21 CRANE OPERATOR (OVER 250 TONS UP TO AND INCLUDING 300 TONS) | $71.16 | $36.40 | $107.56 |
| POWER EQUIPMENT OPERATOR, CRANE: GROUP 20 CRANE OPERATOR (OVER 200 TONS UP TO AND INCLUDING 250 TONS) | $70.55 | $36.40 | $106.95 |
| POWER EQUIPMENT OPERATOR, CRANE: GROUP 19 CRANE OPERATOR (OVER 150 TONS UP TO AND INCLUDING 200 TONS) | $69.94 | $36.40 | $106.34 |
| POWER EQUIPMENT OPERATOR, CRANE: GROUP 17 CRANE OPERATOR (INCLUDING 80 TONS UP TO AND INCLUDING 150 TONS) | $67.91 | $36.40 | $104.31 |
| POWER EQUIPMENT OPERATOR, CRANE: GROUP 16 CRANE OPERATOR (OVER 40 TONS UP TO AND INCLUDING 79 TONS) | $67.41 | $36.40 | $103.81 |
| POWER EQUIPMENT OPERATOR, CRANE: GROUP 12 CRANE OPERATOR (UP TO INCLUDING 40 TON CAPACITY) | $65.99 | $36.40 | $102.39 |
IRON0416-002 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, REINFORCING | $50.70 | $35.15 | $85.85 |
IRON0433-002 Effective 01/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, STRUCTURAL | $46.20 | $34.30 | $80.50 |
LABO0169-027 Effective 10/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER ((4) PIPELAYER) | $34.45 | $16.30 | $50.75 |
| LABORER ((3) CONCRETE SAW (HAND HELD/WALK BEHIND); MASON TENDER - CEMENT/CONCRETE;) | $34.20 | $16.30 | $50.50 |
| LABORER ((1) COMMON OR GENERAL) | $33.95 | $16.30 | $50.25 |
LABO0872-013 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER ((2) ASPHALT RAKER, SHOVELER, SPREADER AND DISTRIBUTOR) | $38.74 | $33.41 | $72.15 |
| LABORER ((1) LANDSCAPE) | $38.53 | $33.41 | $71.94 |
SUNV2014-020 Effective 09/08/2016 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: WATER TRUCK | $16.64 | $4.16 | $20.80 |
| TRUCK DRIVER: DUMP TRUCK | $31.77 | $4.16 | $35.93 |
| OPERATOR: ROLLER | $41.60 | $12.77 | $54.37 |
| OPERATOR: MECHANIC | $32.97 | $17.65 | $50.62 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $49.59 | $7.48 | $57.07 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $39.25 | $21.12 | $60.37 |
| ELECTRICIAN | $40.79 | $13.94 | $54.73 |
| CEMENT MASON/CONCRETE FINISHER | $40.26 | $0.00 | $40.26 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 1 | 01/30/2026 |
| 2 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Nevada.
Get notified when NV20260021 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.