NV20260028
HeavyDavis-Bacon Act general wage determination for heavy construction in Nevada.
Track NV20260028
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
CARP1977-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (Including Form Work) | $57.69 | $21.53 | $79.22 |
ELEC0396-002 Effective 06/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LINE CONSTRUCTION (Groundman) | $38.74 | $19.36 | $58.10 |
ELEC1245-003 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LINE CONSTRUCTION (Lineman) Lineman | $70.16 | $24.71 | $94.87 |
ENGI0003-016 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR GROUP 07 | $49.02 | $30.38 | $79.40 |
| GROUP 08 | $49.61 | $30.38 | $79.99 |
| GROUP 10 | $50.28 | $30.38 | $80.66 |
| GROUP 10A | $42.72 | $24.50 | $67.22 |
| GROUP 11 | $50.71 | $30.38 | $81.09 |
| GROUP 11A | $52.35 | $30.38 | $82.73 |
ENGI0003-030 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (09) Mechanic and Backhoe Loader Combo | $49.93 | $30.38 | $80.31 |
ENGI0012-014 Effective 01/01/2026 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (Crane) GROUP 12 | $65.99 | $36.40 | $102.39 |
| GROUP 16 | $67.41 | $36.40 | $103.81 |
| GROUP 17 | $67.91 | $36.40 | $104.31 |
| GROUP 19 | $69.94 | $36.40 | $106.34 |
| GROUP 20 | $70.55 | $36.40 | $106.95 |
| GROUP 21 | $71.16 | $36.40 | $107.56 |
| GROUP 22 | $71.92 | $36.40 | $108.32 |
| GROUP 23 | $72.38 | $36.40 | $108.78 |
IRON0416-002 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, REINFORCING | $50.70 | $35.15 | $85.85 |
IRON0433-002 Effective 01/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, STRUCTURAL | $46.20 | $34.30 | $80.50 |
LABO0169-027 Effective 10/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER (1) Common or General | $33.95 | $16.30 | $50.25 |
| (4) Pipelayer | $34.45 | $16.30 | $50.75 |
LABO0872-013 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER (1) Landscape | $38.53 | $33.41 | $71.94 |
SUNV2014-032 Effective 09/08/2016 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $40.26 | $0.00 | $40.26 |
| ELECTRICIAN | $38.02 | $13.40 | $51.42 |
| OPERATOR: Backhoe/Excavator/Trackhoe | $39.25 | $21.12 | $60.37 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader | $49.59 | $7.48 | $57.07 |
| OPERATOR: OPERATOR: Mechanic | $32.97 | $17.65 | $50.62 |
| OPERATOR: OPERATOR: Roller | $41.60 | $12.77 | $54.37 |
| OPERATOR: TRUCK DRIVER: Dump Truck | $31.77 | $4.16 | $35.93 |
| OPERATOR: TRUCK DRIVER: Water Truck | $16.64 | $4.16 | $20.80 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 01/30/2026 |
Counties Covered
This wage determination applies to 2 counties in Nevada.
Get notified when NV20260028 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.