NV20260046
HighwayDavis-Bacon Act general wage determination for highway construction in Nevada.
Track NV20260046
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ENGI0003-037 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: Asphalt/Concrete Laydown | $60.39 | $30.38 | $90.77 |
ENGI0003-042 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: Bulldozer | $60.39 | $30.38 | $90.77 |
ENGI0003-045 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: Grader/Blade | $50.47 | $30.38 | $80.85 |
ENGI0003-050 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: Loader Loader up to and including 2 1/2 cu.yds | $49.61 | $30.38 | $79.99 |
ENGI0003-065 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: Roller | $60.39 | $30.38 | $90.77 |
ENGI0012-036 Effective 01/01/2026 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: Oiler | $63.57 | $36.40 | $99.97 |
IRON0118-016 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, REINFORCING | $50.70 | $35.15 | $85.85 |
LABO0169-010 Effective 10/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: Mason Tender - Cement/Concrete | $34.20 | $16.30 | $50.50 |
| LABORER: Jackhammer | $34.20 | $16.30 | $50.50 |
LABO0169-011 Effective 10/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: Common or General | $33.95 | $16.30 | $50.25 |
LABO0169-012 Effective 10/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: Concrete Saw | $34.20 | $16.30 | $50.50 |
LABO0169-014 Effective 10/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor | $34.45 | $16.30 | $50.75 |
| LABORER: Pipelayer | $34.45 | $16.30 | $50.75 |
LABO0169-016 Effective 10/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRAFFIC CONTROL: Flagger | $32.08 | $16.30 | $48.38 |
SUNV2021-001 Effective 03/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $37.67 | $16.98 | $54.65 |
| OPERATOR: Backhoe/Excavator/Trackhoe | $40.38 | $22.61 | $62.99 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader | $36.47 | $24.06 | $60.53 |
| OPERATOR: OPERATOR: Broom/Sweeper | $44.42 | $19.21 | $63.63 |
| OPERATOR: OPERATOR: Drill | $46.92 | $25.02 | $71.94 |
| OPERATOR: OPERATOR: Mechanic | $35.90 | $23.95 | $59.85 |
| OPERATOR: OPERATOR: Milling Machine | $55.93 | $15.47 | $71.40 |
| OPERATOR: OPERATOR: Paver (Asphalt, Aggregate, and Concrete) | $36.85 | $25.26 | $62.11 |
| OPERATOR: OPERATOR: Screed | $43.24 | $25.09 | $68.33 |
| TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper | $30.23 | $11.02 | $41.25 |
| TRAFFIC CONTROL: TRUCK DRIVER: Dump Truck | $40.52 | $0.00 | $40.52 |
| TRAFFIC CONTROL: TRUCK DRIVER: Water Truck | $42.48 | $0.00 | $42.48 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 01/30/2026 |
Counties Covered
This wage determination applies to 1 county in Nevada.
Get notified when NV20260046 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.