Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ENGI0003-037 Effective 07/01/2024
Trade Rate Fringe Total
OPERATOR: ASPHALT/CONCRETE LAYDOWN $60.39 $30.38 $90.77
ENGI0003-040 Effective 07/01/2024
Trade Rate Fringe Total
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $50.47 $30.38 $80.85
ENGI0003-042 Effective 07/01/2024
Trade Rate Fringe Total
OPERATOR: BULLDOZER $60.39 $30.38 $90.77
ENGI0003-045 Effective 07/01/2024
Trade Rate Fringe Total
OPERATOR: GRADER/BLADE $50.47 $30.38 $80.85
ENGI0003-049 Effective 07/01/2024
Trade Rate Fringe Total
OPERATOR: LOADER (LOADER OVER 2 1/2 CU.YDS. UP TO AND INCLUDING 4 CU.YDS.) $50.28 $30.38 $80.66
ENGI0003-053 Effective 07/01/2024
Trade Rate Fringe Total
OPERATOR: MECHANIC $50.28 $30.38 $80.66
ENGI0003-065 Effective 07/01/2024
Trade Rate Fringe Total
OPERATOR: ROLLER $60.39 $30.38 $90.77
ENGI0012-036 Effective 01/01/2026
Trade Rate Fringe Total
OPERATOR: OILER $63.57 $36.40 $99.97
IRON0118-016 Effective 01/01/2025
Trade Rate Fringe Total
IRONWORKER, REINFORCING $50.70 $35.15 $85.85
LABO0169-010 Effective 10/01/2024
Trade Rate Fringe Total
LABORER: JACKHAMMER $34.20 $16.30 $50.50
LABORER: MASON TENDER - CEMENT/CONCRETE $34.20 $16.30 $50.50
LABO0169-011 Effective 10/01/2024
Trade Rate Fringe Total
LABORER: COMMON OR GENERAL $33.95 $16.30 $50.25
LABO0169-012 Effective 10/01/2024
Trade Rate Fringe Total
LABORER: CONCRETE SAW $34.20 $16.30 $50.50
LABO0169-013 Effective 10/01/2024
Trade Rate Fringe Total
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $36.70 $16.30 $53.00
LABO0169-014 Effective 10/01/2024
Trade Rate Fringe Total
LABORER: PIPELAYER $34.45 $16.30 $50.75
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $34.45 $16.30 $50.75
LABO0169-016 Effective 10/01/2024
Trade Rate Fringe Total
TRAFFIC CONTROL: FLAGGER $32.08 $16.30 $48.38
SUNV2021-009 Effective 03/01/2024
Trade Rate Fringe Total
TRUCK DRIVER: WATER TRUCK $42.48 $0.00 $42.48
TRUCK DRIVER: DUMP TRUCK $40.52 $0.00 $40.52
OPERATOR: SCREED $43.24 $25.09 $68.33
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) $40.99 $26.97 $67.96
OPERATOR: MILLING MACHINE $55.93 $15.47 $71.40
OPERATOR: DRILL $46.92 $25.02 $71.94
OPERATOR: BROOM/SWEEPER $44.42 $19.21 $63.63
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $39.05 $23.76 $62.81
CEMENT MASON/CONCRETE FINISHER $36.64 $15.45 $52.09

Modification History

Modification Publication Date
1 01/30/2026
2 05/18/2026

Counties Covered

This wage determination applies to 1 county in Nevada.

Get notified when NV20260054 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.