NV20260057
HighwayDavis-Bacon Act general wage determination for highway construction in Nevada.
Track NV20260057
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
CARP1977-008 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER | $46.50 | $17.92 | $64.42 |
ELEC0357-006 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $58.48 | $27.62 | $86.10 |
ENGI0003-040 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: Backhoe/Excavator/Trackhoe | $50.47 | $30.38 | $80.85 |
ENGI0003-041 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $47.56 | $30.38 | $77.94 |
ENGI0003-043 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: Grade Checker | $50.71 | $30.38 | $81.09 |
| OPERATOR: Grader/Blade | $50.71 | $30.38 | $81.09 |
ENGI0003-049 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: Loader Loader over 2 1/2 cu.yds. up to and including 4 cu.yds | $50.28 | $30.38 | $80.66 |
ENGI0003-053 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: Mechanic | $50.28 | $30.38 | $80.66 |
ENGI0003-055 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: Oiler | $46.76 | $30.38 | $77.14 |
ENGI0003-057 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: Paver (Asphalt, Aggregate, and Concrete) | $50.71 | $30.38 | $81.09 |
ENGI0003-065 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: Roller | $60.39 | $30.38 | $90.77 |
ENGI0012-029 Effective 01/01/2026 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: Drill Drilling depth of 105' maximum | $64.02 | $36.40 | $100.42 |
| Drilling depth of 45' maximum | $63.79 | $36.40 | $100.19 |
ENGI0012-030 Effective 01/01/2026 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: Forklift Under 5 Tons | $60.84 | $36.40 | $97.24 |
ENGI0012-031 Effective 01/01/2026 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: Crane (Oiler) 40 tons up to and including 200 ton M.R.C | $64.52 | $36.40 | $100.92 |
| OPERATOR: Crane Heavy Duty Repairman | $65.66 | $36.40 | $102.06 |
ENGI0012-041 Effective 01/01/2026 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: Scraper | $63.90 | $36.40 | $100.30 |
IRON0118-016 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, REINFORCING | $50.70 | $35.15 | $85.85 |
IRON0433-011 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, STRUCTURAL | $50.70 | $35.15 | $85.85 |
LABO0169-010 Effective 10/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: Mason Tender - Cement/Concrete | $34.20 | $16.30 | $50.50 |
| LABORER: Jackhammer | $34.20 | $16.30 | $50.50 |
LABO0169-012 Effective 10/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: Concrete Saw | $34.20 | $16.30 | $50.50 |
LABO0169-013 Effective 10/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper | $36.70 | $16.30 | $53.00 |
LABO0169-014 Effective 10/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor | $34.45 | $16.30 | $50.75 |
| LABORER: Pipelayer | $34.45 | $16.30 | $50.75 |
LABO0169-016 Effective 10/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRAFFIC CONTROL: Flagger | $32.08 | $16.30 | $48.38 |
PLAS0797-010 Effective 10/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $43.06 | $13.69 | $56.75 |
SUNV2021-012 Effective 03/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: Common or General | $27.30 | $12.35 | $39.65 |
| PAINTER | $50.37 | $0.00 | $50.37 |
| TRUCK DRIVER: Dump Truck | $27.14 | $0.00 | $27.14 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 01/30/2026 |
Counties Covered
This wage determination applies to 1 county in Nevada.
Get notified when NV20260057 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.