OH20260061
BuildingDavis-Bacon Act general wage determination for building construction in Ohio.
Track OH20260061
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
BROH0040-001 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE FINISHER | $30.25 | $23.93 | $54.18 |
| TILE SETTER | $35.67 | $24.75 | $60.42 |
| BRICK POINTER/CAULKER/CLEANER | $35.67 | $24.75 | $60.42 |
| TILE FINISHER | $30.25 | $23.93 | $54.18 |
| TILE SETTER | $35.67 | $24.75 | $60.42 |
| BRICK POINTER/CAULKER/CLEANER | $35.67 | $24.75 | $60.42 |
BROH0040-001 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE FINISHER | $30.25 | $23.93 | $54.18 |
| TILE SETTER | $35.67 | $24.75 | $60.42 |
| BRICK POINTER/CAULKER/CLEANER | $35.67 | $24.75 | $60.42 |
| TILE FINISHER | $30.25 | $23.93 | $54.18 |
| TILE SETTER | $35.67 | $24.75 | $60.42 |
| BRICK POINTER/CAULKER/CLEANER | $35.67 | $24.75 | $60.42 |
BROH0040-002 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $35.67 | $24.75 | $60.42 |
CARP0285-006 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (EXCLUDING DRYWALL HANGING AND METAL STUD INSTALLATION, AND SOFT FLOOR LAYING) | $33.09 | $23.06 | $56.15 |
CARP0373-001 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SOFT FLOOR LAYER | $37.52 | $23.50 | $61.02 |
ELEC0038-004 Effective 04/28/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) FOOTNOTES; A. 6 PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; JULY 4TH; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY B. 1 WEEK'S PAID VACATION FOR 1 YEAR'S SERVICE; 2 WEEKS' PAID VACATION FOR 2 OR MORE YEARS' SERVICE | $46.63 | $24.92 | $71.55 |
ENGI0018-023 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: FORKLIFT | $42.98 | $16.41 | $59.39 |
| POWER EQUIPMENT OPERATOR: CRANE | $44.14 | $16.41 | $60.55 |
IRON0550-013 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL | $36.00 | $23.57 | $59.57 |
LABO0500-004 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER (MASON TENDER - CEMENT/CONCRETE) | $32.35 | $16.42 | $48.77 |
LABO1015-004 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: COMMON OR GENERAL | $32.62 | $12.95 | $45.57 |
PAIN0841-004 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER, DRYWALL TAPER (DRYWALL FINISHING/TAPING ONLY) | $33.43 | $18.15 | $51.58 |
PLAS0132-014 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLASTERER | $31.68 | $15.46 | $47.14 |
PLUM0050-009 Effective 06/30/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | $51.00 | $32.56 | $83.56 |
ROOF0088-003 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $32.10 | $21.45 | $53.55 |
SHEE0033-027 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $37.66 | $32.23 | $69.89 |
SUOH2012-063 Effective 08/29/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP (ALL TYPES) | $18.88 | $4.14 | $23.02 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $28.89 | $10.53 | $39.42 |
| PLUMBER | $32.69 | $18.70 | $51.39 |
| PAINTER (BRUSH AND ROLLER) | $20.91 | $10.49 | $31.40 |
| OPERATOR: ROLLER | $22.16 | $8.07 | $30.23 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.85 | $10.42 | $36.27 |
| OPERATOR: LOADER | $19.87 | $5.91 | $25.78 |
| OPERATOR: BULLDOZER | $24.19 | $8.24 | $32.43 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.56 | $7.13 | $27.69 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $30.20 | $12.96 | $43.16 |
| LABORER: PIPELAYER | $18.37 | $4.79 | $23.16 |
| ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF HVAC/TEMPERATURE CONTROLS | $29.66 | $15.68 | $45.34 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $20.27 | $8.64 | $28.91 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Ohio.
Get notified when OH20260061 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.