OH20260071
BuildingDavis-Bacon Act general wage determination for building construction in Ohio.
Track OH20260071
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0008-010 Effective 03/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $35.23 | $23.04 | $58.27 |
BROH0018-005 Effective 09/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $32.41 | $16.36 | $48.77 |
BROH0018-009 Effective 09/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE FINISHER | $27.87 | $16.31 | $44.18 |
CARP0002-008 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (ACCOUSTICAL CEILING INSTALLATION ONLY) | $32.26 | $19.10 | $51.36 |
CARP0002-015 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INCLUDES DRYWALL HANGING AND METAL STUD INSTALLATION; EXCLUDES FORM WORK) | $32.26 | $19.10 | $51.36 |
ELEC0648-002 Effective 09/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $38.00 | $24.16 | $62.16 |
ENGI0018-037 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $44.14 | $16.41 | $60.55 |
ENGI0018-038 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BULLDOZER; CRANE | $44.14 | $16.41 | $60.55 |
ENGI0066-045 Effective 06/01/2017 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $32.42 | $19.66 | $52.08 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $28.87 | $19.66 | $48.53 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $32.92 | $19.66 | $52.58 |
IRON0044-003 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, REINFORCING | $38.27 | $23.90 | $62.17 |
IRON0044-019 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $37.77 | $23.90 | $61.67 |
LABO0534-002 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: MASON TENDER - BRICK | $32.82 | $14.45 | $47.27 |
| LABORER: COMMON OR GENERAL; FORM WORK | $32.49 | $14.45 | $46.94 |
PAIN0123-001 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: BRUSH AND ROLLER | $28.29 | $13.75 | $42.04 |
PAIN0387-002 Effective 11/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| GLAZIER | $31.95 | $18.20 | $50.15 |
PLAS0132-019 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLASTERER | $31.35 | $17.65 | $49.00 |
PLUM0392-004 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER (INCLUDES HVAC UNIT INSTALLATION, EXCLUDES HVAC PIPE INSTALLATION) | $43.30 | $27.40 | $70.70 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION, EXCLUDES HVAC UNIT INSTALLATION) | $43.30 | $27.40 | $70.70 |
ROOF0042-007 Effective 08/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $34.38 | $19.94 | $54.32 |
SFOH0669-009 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER (FIRE SPRINKLERS) | $48.28 | $28.08 | $76.36 |
SHEE0024-025 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $31.23 | $25.79 | $57.02 |
SHEE0024-030 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (EXCLUDING HVAC DUCT INSTALLATION) | $34.32 | $23.77 | $58.09 |
SUOH2012-073 Effective 08/29/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP (ALL TYPES) | $24.32 | $11.73 | $36.05 |
| PAINTER: SPRAY | $22.78 | $12.40 | $35.18 |
| OPERATOR: ROLLER | $29.85 | $12.00 | $41.85 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.28 | $13.29 | $43.57 |
| OPERATOR: LOADER | $29.66 | $12.61 | $42.27 |
| LABORER: PIPELAYER | $23.18 | $8.95 | $32.13 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $23.87 | $9.80 | $33.67 |
| LABORER: LANDSCAPE & IRRIGATION | $23.60 | $0.87 | $24.47 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $26.19 | $8.99 | $35.18 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $22.62 | $8.76 | $31.38 |
| CEMENT MASON/CONCRETE FINISHER | $32.38 | $2.58 | $34.96 |
| BRICKLAYER | $24.73 | $4.71 | $29.44 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Ohio.
Get notified when OH20260071 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.