OH20260082
BuildingDavis-Bacon Act general wage determination for building construction in Ohio.
Track OH20260082
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0008-010 Effective 03/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $35.23 | $23.04 | $58.27 |
BROH0018-008 Effective 09/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $32.41 | $16.36 | $48.77 |
| TILE FINISHER | $27.87 | $16.31 | $44.18 |
| BRICKLAYER | $35.00 | $17.13 | $52.13 |
| TILE SETTER | $32.41 | $16.36 | $48.77 |
| TILE FINISHER | $27.87 | $16.31 | $44.18 |
| BRICKLAYER | $35.00 | $17.13 | $52.13 |
BROH0018-008 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $32.41 | $16.36 | $48.77 |
| TILE FINISHER | $27.87 | $16.31 | $44.18 |
| BRICKLAYER | $35.00 | $17.13 | $52.13 |
| TILE SETTER | $32.41 | $16.36 | $48.77 |
| TILE FINISHER | $27.87 | $16.31 | $44.18 |
| BRICKLAYER | $35.00 | $17.13 | $52.13 |
CARP0002-008 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (ACCOUSTICAL CEILING INSTALLATION ONLY) | $32.26 | $19.10 | $51.36 |
CARP0002-014 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INCLUDING DRYWALL HANGING, METAL STUD INSTALLATION AND FORM WORK; EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $32.26 | $19.10 | $51.36 |
ELEC0212-010 Effective 06/02/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $38.05 | $22.97 | $61.02 |
ENGI0018-036 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (BACKHOE/EXCAVATOR/TRACKHOE; BULLDOZER; CRANE) | $44.14 | $16.41 | $60.55 |
ENGI0018-037 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $44.14 | $16.41 | $60.55 |
ENGI0066-045 Effective 06/01/2017 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $32.42 | $19.66 | $52.08 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $28.87 | $19.66 | $48.53 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $32.92 | $19.66 | $52.58 |
IRON0044-003 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, REINFORCING | $38.27 | $23.90 | $62.17 |
IRON0044-019 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $37.77 | $23.90 | $61.67 |
LABO0265-017 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: COMMON OR GENERAL | $27.30 | $18.75 | $46.05 |
LABO0265-019 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: MASON TENDER - BRICK | $26.60 | $18.75 | $45.35 |
PAIN0123-001 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: BRUSH AND ROLLER | $28.29 | $13.75 | $42.04 |
PAIN0387-002 Effective 11/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| GLAZIER | $31.95 | $18.20 | $50.15 |
PLAS0132-018 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $33.50 | $16.05 | $49.55 |
PLAS0132-019 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLASTERER | $31.35 | $17.65 | $49.00 |
PLUM0392-005 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) | $43.30 | $27.40 | $70.70 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $43.30 | $27.40 | $70.70 |
ROOF0042-007 Effective 08/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $34.38 | $19.94 | $54.32 |
SFOH0669-009 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER (FIRE SPRINKLERS) | $48.28 | $28.08 | $76.36 |
SHEE0024-029 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION ONLY) | $34.32 | $23.77 | $58.09 |
SUOH2012-084 Effective 08/29/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP (ALL TYPES) | $24.32 | $11.73 | $36.05 |
| PAINTER: SPRAY | $22.78 | $12.40 | $35.18 |
| OPERATOR: ROLLER | $29.85 | $12.00 | $41.85 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.28 | $13.29 | $43.57 |
| OPERATOR: LOADER | $29.66 | $12.61 | $42.27 |
| LABORER: PIPELAYER | $23.18 | $8.95 | $32.13 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $23.87 | $9.80 | $33.67 |
| LABORER: LANDSCAPE & IRRIGATION | $23.60 | $0.87 | $24.47 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $26.19 | $8.99 | $35.18 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $22.28 | $8.63 | $30.91 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Ohio.
Get notified when OH20260082 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.