OH20260083
BuildingDavis-Bacon Act general wage determination for building construction in Ohio.
Track OH20260083
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0002-003 Effective 08/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $46.50 | $29.43 | $75.93 |
BROH0006-008 Effective 05/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $33.46 | $21.37 | $54.83 |
BROH0008-007 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE FINISHER | $25.37 | $17.42 | $42.79 |
BROH0009-005 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER (WARREN AND MOUNT PLEASANT TOWNSHIPS AND VILLAGE OF DILIONVALE) | $30.55 | $26.41 | $56.96 |
BROH0010-003 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER (EXCLUDE WARREN AND MOUNT PLEASANT TOWNSHIPS AND VILLAGE OF DILIONVALE) | $34.02 | $22.94 | $56.96 |
CARP0186-001 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER | $31.82 | $25.07 | $56.89 |
ELEC0246-002 Effective 10/28/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN FOOTNOTE: A. 1 1/2 PAID HOLIDAYS: THE LAST SCHEDULED WORKDAY PRIOR TO CHRISTMAS & 4 HOURS ON GOOD FRIDAY | $44.00 | $37.68 | $81.68 |
ENGI0018-035 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $44.14 | $16.41 | $60.55 |
ENGI0066-045 Effective 06/01/2017 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $32.42 | $19.66 | $52.08 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $28.87 | $19.66 | $48.53 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $32.92 | $19.66 | $52.58 |
IRON0549-001 Effective 12/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, STRUCTURAL (INCLUDING METAL BUILDING STRUCTURAL FRAME INSTALLATION) | $35.19 | $25.66 | $60.85 |
IRON0550-012 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: ORNAMENTAL | $36.00 | $23.57 | $59.57 |
LABO0809-002 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: COMMON OR GENERAL | $31.20 | $16.23 | $47.43 |
LABO1149-001 Effective 12/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: MASON TENDER - BRICK | $24.92 | $16.55 | $41.47 |
PLUM0094-005 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) | $47.48 | $27.14 | $74.62 |
PLUM0168-003 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | $40.92 | $37.20 | $78.12 |
PLUM0495-008 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $34.73 | $37.60 | $72.33 |
ROOF0088-003 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $32.10 | $21.45 | $53.55 |
SHEE0033-047 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (INCLUDING HVAC DUCT AND UNIT INSTALLATION) | $35.52 | $29.87 | $65.39 |
SUOH2012-085 Effective 08/29/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP (ALL TYPES) | $22.78 | $12.61 | $35.39 |
| PAINTER: SPRAY | $22.78 | $12.40 | $35.18 |
| PAINTER (BRUSH AND ROLLER) | $20.37 | $10.63 | $31.00 |
| OPERATOR: ROLLER | $28.83 | $12.72 | $41.55 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.28 | $13.29 | $43.57 |
| OPERATOR: LOADER | $29.66 | $12.61 | $42.27 |
| OPERATOR: CRANE | $29.56 | $11.82 | $41.38 |
| OPERATOR: BULLDOZER | $22.55 | $8.03 | $30.58 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $30.26 | $12.58 | $42.84 |
| LABORER: PIPELAYER | $23.98 | $8.58 | $32.56 |
| CEMENT MASON/CONCRETE FINISHER | $26.07 | $12.34 | $38.41 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Ohio.
Get notified when OH20260083 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.