OH20260084
BuildingDavis-Bacon Act general wage determination for building construction in Ohio.
Track OH20260084
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0003-002 Effective 08/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $43.88 | $26.93 | $70.81 |
BROH0005-007 Effective 05/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICK POINTER/CAULKER/CLEANER | $38.13 | $20.19 | $58.32 |
BROH0005-009 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE FINISHER | $31.50 | $16.23 | $47.73 |
BROH0016-003 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $38.01 | $20.64 | $58.65 |
BROH0036-001 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $36.07 | $19.49 | $55.56 |
CARP0373-001 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SOFT FLOOR LAYER | $37.52 | $23.50 | $61.02 |
CARP0435-001 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $37.52 | $23.50 | $61.02 |
CARP1090-001 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PILEDRIVERMAN | $36.34 | $27.50 | $63.84 |
ELEC0038-005 Effective 04/28/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) FOOTNOTES; A. 6 PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; JULY 4TH; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY B. 1 WEEK'S PAID VACATION FOR 1 YEAR'S SERVICE; 2 WEEKS' PAID VACATION FOR 2 OR MORE YEARS' SERVICE | $33.05 | $14.91 | $47.96 |
ENGI0018-042 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: CRANE | $46.71 | $16.41 | $63.12 |
| POWER EQUIPMENT OPERATOR (OILER) | $36.93 | $16.41 | $53.34 |
ENGI0066-045 Effective 06/01/2017 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $32.42 | $19.66 | $52.08 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $28.87 | $19.66 | $48.53 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $32.92 | $19.66 | $52.58 |
IRON0017-011 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER (ORNAMENTAL, REINFORCING, & STRUCTURAL) | $36.83 | $29.01 | $65.84 |
LABO0310-002 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER (COMMON OR GENERAL; MASON TENDER - BRICK & CEMENT/CONCRETE) | $31.89 | $22.66 | $54.55 |
PAIN0181-001 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| GLAZIER | $34.82 | $20.80 | $55.62 |
PAIN0707-002 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: BRUSH AND ROLLER | $32.35 | $19.45 | $51.80 |
PAIN0707-003 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | $35.45 | $20.20 | $55.65 |
PLAS0031-018 Effective 05/01/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLASTERER (INCLUDING FLOOR LAYER: FLOOR COATING/EPOXY) | $29.51 | $15.67 | $45.18 |
PLAS0404-001 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $35.58 | $23.71 | $59.29 |
PLUM0055-002 Effective 05/05/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) | $44.86 | $30.03 | $74.89 |
PLUM0120-009 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER (FIRE SPRINKLERS) | $49.17 | $28.55 | $77.72 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $49.17 | $28.55 | $77.72 |
ROOF0044-003 Effective 04/27/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $40.15 | $21.28 | $61.43 |
SHEE0033-044 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (INCLUDING HVAC DUCT AND UNIT INSTALLATION) | $43.06 | $30.11 | $73.17 |
SUOH2012-086 Effective 08/29/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP (ALL TYPES) | $24.32 | $11.73 | $36.05 |
| PAINTER: SPRAY | $22.78 | $12.40 | $35.18 |
| OPERATOR: ROLLER | $31.48 | $12.80 | $44.28 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $31.48 | $12.80 | $44.28 |
| OPERATOR: LOADER | $29.66 | $12.61 | $42.27 |
| OPERATOR: BULLDOZER | $21.15 | $8.72 | $29.87 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $32.88 | $12.26 | $45.14 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $30.95 | $10.20 | $41.15 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $24.53 | $14.55 | $39.08 |
| CARPENTER: (EXCLUDING DRYWALL HANGING AND METAL STUD INSTALLATION, SOFT FLOOR LAYING, AND FORM WORK) | $28.26 | $12.11 | $40.37 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Ohio.
Get notified when OH20260084 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.