OH20260088
BuildingDavis-Bacon Act general wage determination for building construction in Ohio.
Track OH20260088
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0045-004 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $37.00 | $28.27 | $65.27 |
BROH0003-006 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $35.41 | $20.80 | $56.21 |
| TILE FINISHER | $32.80 | $13.42 | $46.22 |
| TERRAZZO WORKER/SETTER | $35.41 | $20.80 | $56.21 |
| BRICKLAYER | $36.23 | $24.81 | $61.04 |
CARP0248-010 Effective 05/01/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $28.22 | $17.77 | $45.99 |
CARP0351-002 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (EXCLUDING DRYWALL HANGING AND METAL STUD INSTALLATION) | $34.42 | $26.53 | $60.95 |
ELEC0008-015 Effective 05/27/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $48.40 | $25.24 | $73.64 |
ELEC0008-016 Effective 08/26/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN: CABLE PULLER (VOICE/DATA/VIDEO) | $13.02 | $14.78 | $27.80 |
ELEC0008-017 Effective 08/23/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $27.81 | $17.48 | $45.29 |
ENGI0018-048 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (BACKHOE/EXCAVATOR/TRACKHOE; CRANE) | $44.89 | $16.41 | $61.30 |
ENGI0066-045 Effective 06/01/2017 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $32.42 | $19.66 | $52.08 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $28.87 | $19.66 | $48.53 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $32.92 | $19.66 | $52.58 |
IRON0044-020 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: ORNAMENTAL | $37.77 | $23.90 | $61.67 |
IRON0055-012 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, STRUCTURAL (INCLUDING METAL BUILDING STRUCTURAL FRAME INSTALLATION) | $35.50 | $29.20 | $64.70 |
LABO0500-005 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE | $32.35 | $16.42 | $48.77 |
PAIN0007-004 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: SPRAY | $34.66 | $23.88 | $58.54 |
| PAINTER: FIREPROOFER | $34.66 | $23.88 | $58.54 |
| PAINTER (BRUSH AND ROLLER) | $33.66 | $23.88 | $57.54 |
PAIN0948-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| GLAZIER | $36.50 | $25.06 | $61.56 |
PLAS0526-017 Effective 06/01/2018 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLASTERER | $27.45 | $15.56 | $43.01 |
PLAS0886-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $35.73 | $24.65 | $60.38 |
PLAS0886-008 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: DRYWALL FINISHING/TAPING ONLY | $35.73 | $24.65 | $60.38 |
PLUM0050-013 Effective 06/30/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) | $51.00 | $32.56 | $83.56 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $51.00 | $32.56 | $83.56 |
ROOF0134-006 Effective 07/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $29.07 | $19.84 | $48.91 |
SFOH0669-009 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER (FIRE SPRINKLERS) | $48.28 | $28.08 | $76.36 |
SHEE0033-048 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $39.58 | $35.15 | $74.73 |
SUOH2012-090 Effective 08/29/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP (ALL TYPES) | $24.32 | $11.73 | $36.05 |
| OPERATOR: ROLLER | $28.83 | $12.72 | $41.55 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.28 | $13.29 | $43.57 |
| OPERATOR: LOADER | $29.66 | $12.61 | $42.27 |
| OPERATOR: BULLDOZER | $28.07 | $11.15 | $39.22 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $30.26 | $12.58 | $42.84 |
| LABORER: PIPELAYER | $23.98 | $8.58 | $32.56 |
| LABORER: MASON TENDER - BRICK | $18.39 | $11.04 | $29.43 |
| IRONWORKER, REINFORCING | $28.11 | $17.83 | $45.94 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Ohio.
Get notified when OH20260088 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.