OH20260100
BuildingDavis-Bacon Act general wage determination for building construction in Ohio.
Track OH20260100
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0003-002 Effective 08/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $43.88 | $26.93 | $70.81 |
BROH0007-001 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICK POINTER/CAULKER/CLEANER | $36.89 | $22.13 | $59.02 |
BROH0007-003 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $36.89 | $22.13 | $59.02 |
BROH0008-007 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE FINISHER | $25.37 | $17.42 | $42.79 |
BROH0036-002 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $33.23 | $15.47 | $48.70 |
CARP0285-005 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INCLUDING DRYWALL HANGING, METAL STUD INSTALLATION, AND FORM WORK) | $36.29 | $23.79 | $60.08 |
ELEC0038-004 Effective 04/28/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) FOOTNOTES; A. 6 PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; JULY 4TH; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY B. 1 WEEK'S PAID VACATION FOR 1 YEAR'S SERVICE; 2 WEEKS' PAID VACATION FOR 2 OR MORE YEARS' SERVICE | $46.63 | $24.92 | $71.55 |
ELEC0306-009 Effective 05/27/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF HVAC/TEMPERATURE CONTROLS) | $42.55 | $23.18 | $65.73 |
ELEC0306-010 Effective 12/30/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $29.23 | $16.36 | $45.59 |
ENGI0018-042 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: CRANE | $46.71 | $16.41 | $63.12 |
| POWER EQUIPMENT OPERATOR (OILER) | $36.93 | $16.41 | $53.34 |
ENGI0018-045 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $45.63 | $16.41 | $62.04 |
ENGI0066-045 Effective 06/01/2017 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $32.42 | $19.66 | $52.08 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $28.87 | $19.66 | $48.53 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $32.92 | $19.66 | $52.58 |
IRON0017-011 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER (ORNAMENTAL, REINFORCING, & STRUCTURAL) | $36.83 | $29.01 | $65.84 |
LABO0310-005 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER (MASON TENDER - CEMENT/CONCRETE) | $31.89 | $22.66 | $54.55 |
LABO0894-006 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: PIPELAYER | $35.12 | $12.65 | $47.77 |
| LABORER: MASON TENDER - BRICK | $35.07 | $12.65 | $47.72 |
| LABORER: COMMON OR GENERAL | $34.92 | $12.65 | $47.57 |
PAIN1162-003 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| GLAZIER | $32.87 | $15.17 | $48.04 |
PLAS0031-019 Effective 05/01/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLASTERER | $29.51 | $15.67 | $45.18 |
PLAS0109-002 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $33.48 | $24.81 | $58.29 |
PLUM0120-010 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | $49.17 | $28.55 | $77.72 |
ROOF0044-003 Effective 04/27/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $40.15 | $21.28 | $61.43 |
SHEE0033-027 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $37.66 | $32.23 | $69.89 |
SHEE0033-041 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (EXCLUDING HVAC DUCT INSTALLATION) | $38.36 | $29.59 | $67.95 |
SUOH2012-102 Effective 08/29/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP (ALL TYPES) | $24.32 | $11.73 | $36.05 |
| PLUMBER | $27.79 | $14.49 | $42.28 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $35.12 | $0.00 | $35.12 |
| PAINTER: SPRAY | $22.78 | $12.40 | $35.18 |
| PAINTER (BRUSH AND ROLLER) | $20.55 | $1.88 | $22.43 |
| OPERATOR: ROLLER | $31.48 | $12.80 | $44.28 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $31.48 | $12.80 | $44.28 |
| OPERATOR: LOADER | $29.66 | $12.61 | $42.27 |
| OPERATOR: BULLDOZER | $29.23 | $12.76 | $41.99 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $32.30 | $10.80 | $43.10 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Ohio.
Get notified when OH20260100 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.