OH20260104
BuildingDavis-Bacon Act general wage determination for building construction in Ohio.
Track OH20260104
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0080-001 Effective 02/24/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.05 | $30.87 | $68.92 |
BROH0055-007 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $29.92 | $16.77 | $46.69 |
| TILE FINISHER | $28.31 | $10.45 | $38.76 |
ELEC0972-003 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $40.00 | $33.32 | $73.32 |
ENGI0018-035 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $44.14 | $16.41 | $60.55 |
ENGI0066-045 Effective 06/01/2017 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $32.42 | $19.66 | $52.08 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $28.87 | $19.66 | $48.53 |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $32.92 | $19.66 | $52.58 |
IRON0550-012 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: ORNAMENTAL | $36.00 | $23.57 | $59.57 |
IRON0787-001 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: STRUCTURAL | $36.10 | $24.65 | $60.75 |
LABO1015-005 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: MASON TENDER - BRICK | $34.62 | $12.95 | $47.57 |
PLUM0094-006 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER | $47.48 | $27.14 | $74.62 |
PLUM0168-004 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PIPEFITTER | $40.92 | $37.20 | $78.12 |
ROOF0088-003 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $32.10 | $21.45 | $53.55 |
SUOH2012-106 Effective 08/29/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP (ALL TYPES) | $22.78 | $12.61 | $35.39 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $32.89 | $20.81 | $53.70 |
| PAINTER: SPRAY | $22.78 | $12.40 | $35.18 |
| PAINTER (BRUSH AND ROLLER) | $20.37 | $10.63 | $31.00 |
| OPERATOR: ROLLER | $28.83 | $12.72 | $41.55 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.28 | $13.29 | $43.57 |
| OPERATOR: LOADER | $29.66 | $12.61 | $42.27 |
| OPERATOR: CRANE | $29.56 | $11.82 | $41.38 |
| OPERATOR: BULLDOZER | $22.55 | $8.03 | $30.58 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $30.26 | $12.58 | $42.84 |
| LABORER: PIPELAYER | $23.98 | $8.58 | $32.56 |
| LABORER: COMMON OR GENERAL | $21.30 | $7.87 | $29.17 |
| CEMENT MASON/CONCRETE FINISHER | $26.07 | $12.34 | $38.41 |
| CARPENTER | $24.74 | $11.86 | $36.60 |
| BRICKLAYER | $26.54 | $11.28 | $37.82 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Ohio.
Get notified when OH20260104 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.