OK20260016

Highway

Davis-Bacon Act general wage determination for highway construction in Oklahoma.

Modification 1, revised 05/18/2026 44 trade rates 2 counties View on SAM.gov

Track OK20260016

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

SUOK2011-003 Effective 04/18/2011
Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK (SEQUOYAH COUNTY) $14.07 $0.00 $14.07
TRUCK DRIVER: DUMP TRUCK (LE FLORE COUNTY) $13.75 $0.00 $13.75
TRUCK DRIVER (WATER TRUCK) $12.00 $0.00 $12.00
TRUCK DRIVER (TANDEM AXLE/SEMI TRAILER) $13.28 $0.00 $13.28
TRUCK DRIVER (PICKUP TRUCK) $12.32 $0.00 $12.32
TRUCK DRIVER (OFF THE ROAD TRUCK) $13.40 $0.00 $13.40
TRUCK DRIVER (LOWBOY/FLOAT) $13.91 $0.00 $13.91
TRUCK DRIVER (FLATBED TRUCK) $14.69 $0.00 $14.69
TRAFFIC SIGNAL INSTALLER $18.04 $0.00 $18.04
POWER EQUIPMENT OPERATOR: BULLDOZER (SEQUOYAH COUNTY) $14.72 $0.00 $14.72
POWER EQUIPMENT OPERATOR: BULLDOZER (LE FLORE COUNTY) $15.14 $0.00 $15.14
POWER EQUIPMENT OPERATOR: (TRENCHER) $13.87 $0.00 $13.87
POWER EQUIPMENT OPERATOR: (TRACTOR/BOX BLADE) $13.67 $0.00 $13.67
POWER EQUIPMENT OPERATOR: (STRIPING MACHINE) $11.94 $0.00 $11.94
POWER EQUIPMENT OPERATOR: (SCRAPER) $13.34 $0.00 $13.34
POWER EQUIPMENT OPERATOR: (ROLLER (DIRT COMPACTION)) $11.71 $0.00 $11.71
POWER EQUIPMENT OPERATOR: (ROLLER (ASPHALT)) $12.70 $0.00 $12.70
POWER EQUIPMENT OPERATOR: (OILER) $15.28 $0.00 $15.28
POWER EQUIPMENT OPERATOR: (MIXER) $14.43 $0.00 $14.43
POWER EQUIPMENT OPERATOR: (MILLING MACHINE) $14.56 $0.00 $14.56
POWER EQUIPMENT OPERATOR: (MECHANIC) $17.46 $0.00 $17.46
POWER EQUIPMENT OPERATOR: (LOADER (FRONT END)) $13.73 $0.00 $13.73
POWER EQUIPMENT OPERATOR: (GRADER/BLADE) $16.95 $0.00 $16.95
POWER EQUIPMENT OPERATOR: (EXCAVATOR) $14.99 $0.00 $14.99
POWER EQUIPMENT OPERATOR: (DISTRIBUTOR TRUCK) $13.34 $0.00 $13.34
POWER EQUIPMENT OPERATOR: (CRANE) $17.42 $0.00 $17.42
POWER EQUIPMENT OPERATOR: (CONCRETE SAW) $11.94 $0.00 $11.94
POWER EQUIPMENT OPERATOR: (CONCRETE PAVING MACHINE) $14.11 $0.00 $14.11
POWER EQUIPMENT OPERATOR: (BROOM) $11.97 $0.00 $11.97
POWER EQUIPMENT OPERATOR: (BOBCAT/SKID LOADER) $12.24 $0.00 $12.24
POWER EQUIPMENT OPERATOR: (BACKHOE/TRACKHOE) $15.83 $0.00 $15.83
POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE) $13.32 $0.00 $13.32
POWER EQUIPMENT OPERATOR: (ASPHALT PAVER SCREED) $12.96 $0.00 $12.96
LABORER, COMMON OR GENERAL (SEQUOYAH COUNTY) $10.91 $0.00 $10.91
LABORER, COMMON OR GENERAL (LE FLORE COUNTY) $10.05 $0.00 $10.05
LABORER (TRAFFIC CONTROL (INCLUDES FLAGGER, SETTING UP AND MOVING CONES/BARRELS)) $10.93 $0.00 $10.93
LABORER (POWER TOOL OPERATOR (INCLUDES CHIPPING GUNS AND HANDHELD CONCRETE SAWS)) $12.89 $0.00 $12.89
LABORER (PIPELAYER) $12.35 $0.00 $12.35
LABORER (LANDSCAPE) $8.67 $0.00 $8.67
LABORER (ASPHALT RAKER AND SHOVELER) $10.85 $0.00 $10.85
IRONWORKER: REINFORCING $15.38 $0.00 $15.38
IRONWORKER, STRUCTURAL $14.21 $0.00 $14.21
CEMENT MASON/CONCRETE FINISHER $13.43 $0.00 $13.43
CARPENTER (INCLUDES FORM WORK) $12.81 $0.00 $12.81

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 2 counties in Oklahoma.

Get notified when OK20260016 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.