OK20260016
rev 0Highway
0 trades
Applies to
Le Flore, Sequoyah in Oklahoma.
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER Building BROK0005-004 | $26.92 | $13.09 | $40.01 |
| BRICKLAYER Residential BROK0005-001 | $25.92 | $11.89 | $37.81 |
| CARPENTER Building SUOK2012-034 | $15.86 | 0.00 | $15.86 |
| CARPENTER Residential SUOK2017-007 | $14.98 | 0.00 | $14.98 |
| CARPENTER (Includes Form Work) Highway SUOK2011-003 | $12.81 | $0.00 | $12.81 |
| CEMENT MASON/CONCRETE FINISHER Highway SUOK2011-003 | $13.43 | $0.00 | $13.43 |
| CEMENT MASON/CONCRETE FINISHER Building SUOK2012-034 | $14.26 | $1.27 | $15.53 |
| CEMENT MASON/CONCRETE FINISHER Residential SUOK2017-007 | $18.57 | 0.00 | $18.57 |
| ELECTRICIAN Building ELEC0584-009 Scope differs by code/WD | $38.38 | $10.20 | $48.58 |
| ELECTRICIAN Building ELEC0700-004 Scope differs by code/WD | $30.03 | $14.03 | $44.06 |
| ELECTRICIAN Residential SUOK2017-007 | $19.08 | 0.00 | $19.08 |
| IRONWORKER Building IRON0584-025 (Ornamental, Reinforcing and Structural) | $30.35 | $16.83 | $47.18 |
| IRONWORKER, REINFORCING Highway SUOK2011-003 | $15.38 | $0.00 | $15.38 |
| IRONWORKER, STRUCTURAL Highway SUOK2011-003 | $14.21 | $0.00 | $14.21 |
| IRONWORKER, STRUCTURAL Residential SUOK2017-007 | $17.10 | $4.22 | $21.32 |
| LABORER Asphalt Raker and Shoveler Highway SUOK2011-003 | $10.85 | $0.00 | $10.85 |
| LABORER: Common or General Building SUOK2012-034 | $9.63 | 0.00 | $9.63 |
| LABORER: Common or General Residential SUOK2017-007 | $12.50 | 0.00 | $12.50 |
| LABORER: Mason Tender - Brick Building SUOK2012-034 | $12.52 | 0.00 | $12.52 |
| LABORER: Mason Tender - Cement/Concrete Building SUOK2012-034 | $13.00 | $1.91 | $14.91 |
| LABORER: Pipelayer Building SUOK2012-034 | $12.39 | 0.00 | $12.39 |
| Landscape Highway SUOK2011-003 | $8.67 | $0.00 | $8.67 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUOK2012-034 | $17.38 | $4.08 | $21.46 |
| OPERATOR: Backhoe/Excavator/Trackhoe Residential SUOK2017-007 | $17.02 | $10.00 | $27.02 |
| OPERATOR: OPERATOR: Bulldozer Building SUOK2012-034 | $20.64 | $2.35 | $22.99 |
| OPERATOR: OPERATOR: Grader/Blade Building SUOK2012-034 | $14.28 | $1.70 | $15.98 |
| OPERATOR: OPERATOR: Loader (Front End) Building SUOK2012-034 | $16.18 | 0.00 | $16.18 |
| OPERATOR: PAINTER: Brush, Roller and Spray Building SUOK2012-034 | $12.22 | 0.00 | $12.22 |
| OPERATOR: PLUMBER Residential SUOK2017-007 | $33.14 | 0.00 | $33.14 |
| OPERATOR: SHEET METAL WORKER, Excludes HVAC Duct Installation Building SUOK2012-034 | $22.18 | $5.06 | $27.24 |
| OPERATOR: TRUCK DRIVER: Dump and Flatbed Truck Building SUOK2012-034 | $11.00 | 0.00 | $11.00 |
| PIPEFITTER Building PLUM0430-011 | $36.65 | $16.03 | $52.68 |
| Pipelayer Highway SUOK2011-003 | $12.35 | $0.00 | $12.35 |
| PLUMBER Building PLUM0430-006 | $36.65 | $16.48 | $53.13 |
| POWER EQUIPMENT OPERATOR: Asphalt Paver Screed Highway SUOK2011-003 | $12.96 | $0.00 | $12.96 |
| POWER EQUIPMENT OPERATOR: Asphalt Paving Machine Highway SUOK2011-003 | $13.32 | $0.00 | $13.32 |
| POWER EQUIPMENT OPERATOR: Backhoe/Trackhoe Highway SUOK2011-003 | $15.83 | $0.00 | $15.83 |
| POWER EQUIPMENT OPERATOR: Bobcat/Skid Loader Highway SUOK2011-003 | $12.24 | $0.00 | $12.24 |
| POWER EQUIPMENT OPERATOR: Broom Highway SUOK2011-003 | $11.97 | $0.00 | $11.97 |
| POWER EQUIPMENT OPERATOR: Concrete Paving Machine Highway SUOK2011-003 | $14.11 | $0.00 | $14.11 |
| POWER EQUIPMENT OPERATOR: Concrete Saw Highway SUOK2011-003 | $11.94 | $0.00 | $11.94 |
| POWER EQUIPMENT OPERATOR: Crane Highway SUOK2011-003 | $17.42 | $0.00 | $17.42 |
| POWER EQUIPMENT OPERATOR: Distributor Truck Highway SUOK2011-003 | $13.34 | $0.00 | $13.34 |
| POWER EQUIPMENT OPERATOR: Excavator Highway SUOK2011-003 | $14.99 | $0.00 | $14.99 |
| POWER EQUIPMENT OPERATOR: Flatbed Truck Highway SUOK2011-003 | $14.69 | $0.00 | $14.69 |
| POWER EQUIPMENT OPERATOR: Grader/Blade Highway SUOK2011-003 | $16.95 | $0.00 | $16.95 |
| POWER EQUIPMENT OPERATOR: Group 1 Building ENGI0627-020 | $38.09 | $19.05 | $57.14 |
| POWER EQUIPMENT OPERATOR: Group 2 Building ENGI0627-020 | $36.14 | $19.05 | $55.19 |
| POWER EQUIPMENT OPERATOR: Group 3 Building ENGI0627-020 | $35.40 | $19.05 | $54.45 |
| POWER EQUIPMENT OPERATOR: Group 4 Building ENGI0627-020 | $34.07 | $19.05 | $53.12 |
| POWER EQUIPMENT OPERATOR: Group 8 Building ENGI0627-020 | $28.77 | $19.05 | $47.82 |
| POWER EQUIPMENT OPERATOR: Group10 Building ENGI0627-020 | $27.25 | $19.05 | $46.30 |
| POWER EQUIPMENT OPERATOR: Loader (Front End) Highway SUOK2011-003 | $13.73 | $0.00 | $13.73 |
| POWER EQUIPMENT OPERATOR: Lowboy/Float Highway SUOK2011-003 | $13.91 | $0.00 | $13.91 |
| POWER EQUIPMENT OPERATOR: Mechanic Highway SUOK2011-003 | $17.46 | $0.00 | $17.46 |
| POWER EQUIPMENT OPERATOR: Milling Machine Highway SUOK2011-003 | $14.56 | $0.00 | $14.56 |
| POWER EQUIPMENT OPERATOR: Mixer Highway SUOK2011-003 | $14.43 | $0.00 | $14.43 |
| POWER EQUIPMENT OPERATOR: Off the Road Truck Highway SUOK2011-003 | $13.40 | $0.00 | $13.40 |
| POWER EQUIPMENT OPERATOR: Oiler Highway SUOK2011-003 | $15.28 | $0.00 | $15.28 |
| POWER EQUIPMENT OPERATOR: Pickup Truck Highway SUOK2011-003 | $12.32 | $0.00 | $12.32 |
| POWER EQUIPMENT OPERATOR: Roller (Asphalt) Highway SUOK2011-003 | $12.70 | $0.00 | $12.70 |
| POWER EQUIPMENT OPERATOR: Roller (Dirt Compaction) Highway SUOK2011-003 | $11.71 | $0.00 | $11.71 |
| POWER EQUIPMENT OPERATOR: Scraper Highway SUOK2011-003 | $13.34 | $0.00 | $13.34 |
| POWER EQUIPMENT OPERATOR: Striping Machine Highway SUOK2011-003 | $11.94 | $0.00 | $11.94 |
| POWER EQUIPMENT OPERATOR: Tandem Axle/Semi Trailer Highway SUOK2011-003 | $13.28 | $0.00 | $13.28 |
| POWER EQUIPMENT OPERATOR: Tractor/Box Blade Highway SUOK2011-003 | $13.67 | $0.00 | $13.67 |
| POWER EQUIPMENT OPERATOR: Trencher Highway SUOK2011-003 | $13.87 | $0.00 | $13.87 |
| POWER EQUIPMENT OPERATOR: Water Truck Highway SUOK2011-003 | $12.00 | $0.00 | $12.00 |
| Power Tool Operator Highway SUOK2011-003 (Includes Chipping Guns and Handheld Concrete Saws) | $12.89 | $0.00 | $12.89 |
| ROOFER Building ROOF0143-001 | $26.30 | $10.34 | $36.64 |
| SHEET METAL WORKER Building SHEE0270-006 (HVAC Duct Installation Only) | $35.49 | $14.60 | $50.09 |
| Traffic Control Highway SUOK2011-003 (Includes Flagger, Setting Up and Moving Cones/Barrels) | $10.93 | $0.00 | $10.93 |
| Traffic signal installer Highway SUOK2011-003 | $18.04 | $0.00 | $18.04 |
No trade rates match your search and filter selection.
Highway
Applies to
Le Flore, Sequoyah in Oklahoma.
Building
Applies to
Le Flore, Sequoyah in Oklahoma.
Residential
Applies to
Le Flore, Sequoyah in Oklahoma.