OK20260054
BuildingDavis-Bacon Act general wage determination for building construction in Oklahoma.
Track OK20260054
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
BROK0005-004 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $26.92 | $13.09 | $40.01 |
ELEC0584-009 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (LE FLORE (ENTIRE COUNTY EXCEPT BRADEN, POCOLA AND SPIRO TOWNSHIPS) AND SEQUOYAH (THAT PORTION WEST OF AKINS, GANS, HANSEN, LONG AND REDLAND TOWNSHIPS) COUNTIES) | $38.38 | $12.89 | $51.27 |
ELEC0700-004 Effective 10/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (LEFLORE (BRADEN, POCOLA AND SPIRO TOWNSHIPS ONLY) AND SEQUOYAH (THAT PORTION EAST OF BRENT, PRICES CHAPEL, ROCKY MOUNTAIN AND SALLISAW TOWNSHIPS) COUNTIES) | $30.03 | $14.03 | $44.06 |
ENGI0627-020 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT | $28.77 | $19.05 | $47.82 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | $34.07 | $19.05 | $53.12 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | $35.40 | $19.05 | $54.45 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | $36.14 | $19.05 | $55.19 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER; SEMI- TRAILER TRUCK DRIVER | $27.25 | $19.05 | $46.30 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $38.09 | $19.05 | $57.14 |
IRON0584-025 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL | $30.35 | $16.83 | $47.18 |
PLUM0430-006 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER | $36.65 | $16.48 | $53.13 |
PLUM0430-011 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PIPEFITTER | $36.65 | $16.03 | $52.68 |
ROOF0143-001 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $26.30 | $10.34 | $36.64 |
SHEE0270-006 Effective 06/01/2020 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $35.49 | $14.60 | $50.09 |
SUOK2012-034 Effective 07/30/2012 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP AND FLATBED TRUCK | $11.00 | $0.00 | $11.00 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $22.18 | $5.06 | $27.24 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $12.22 | $0.00 | $12.22 |
| OPERATOR: LOADER (FRONT END) | $16.18 | $0.00 | $16.18 |
| OPERATOR: GRADER/BLADE | $14.28 | $1.70 | $15.98 |
| OPERATOR: BULLDOZER | $20.64 | $2.35 | $22.99 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.38 | $4.08 | $21.46 |
| LABORER: PIPELAYER | $12.39 | $0.00 | $12.39 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.00 | $1.91 | $14.91 |
| LABORER: MASON TENDER - BRICK | $12.52 | $0.00 | $12.52 |
| LABORER: COMMON OR GENERAL | $9.63 | $0.00 | $9.63 |
| CEMENT MASON/CONCRETE FINISHER | $14.26 | $1.27 | $15.53 |
| CARPENTER | $15.86 | $0.00 | $15.86 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 1 | 01/23/2026 |
| 2 | 05/18/2026 |
Counties Covered
This wage determination applies to 2 counties in Oklahoma.
Get notified when OK20260054 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.