HeavyDavis-Bacon Act general wage determination for heavy construction in Oklahoma.
Track OK20260029
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ENGI0627-015 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 6 ROLLER (ASPHALT AND DIRT) | $30.87 | $19.05 | $49.92 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | $34.07 | $19.05 | $53.12 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | $35.40 | $19.05 | $54.45 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | $36.14 | $19.05 | $55.19 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER | $27.25 | $19.05 | $46.30 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $38.09 | $19.05 | $57.14 |
IRON0048-005 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER (STRUCTURAL, REINFORCING, AND ORNAMENTAL) | $32.10 | $17.38 | $49.48 |
SUOK2012-007 Effective 05/18/2012 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $16.50 | $0.74 | $17.24 |
| OPERATOR: TRACKHOE | $17.50 | $2.78 | $20.28 |
| OPERATOR: SCRAPER | $16.00 | $1.55 | $17.55 |
| OPERATOR: MECHANIC | $19.61 | $9.39 | $29.00 |
| OPERATOR: LOADER (FRONT END) | $13.51 | $0.00 | $13.51 |
| OPERATOR: GRADER/BLADE | $17.76 | $3.87 | $21.63 |
| OPERATOR: DRILL | $17.15 | $0.78 | $17.93 |
| OPERATOR: BACKHOE/EXCAVATOR | $18.17 | $6.28 | $24.45 |
| LABORER: PIPELAYER | $11.13 | $0.00 | $11.13 |
| LABORER: COMMON OR GENERAL | $11.81 | $1.09 | $12.90 |
| FORM WORKER | $11.77 | $0.00 | $11.77 |
| ELECTRICIAN | $22.00 | $4.76 | $26.76 |
| CEMENT MASON/CONCRETE FINISHER | $12.49 | $1.23 | $13.72 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 5 counties in Oklahoma.
Get notified when OK20260029 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.