| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (Includes Form Work) Highway SUOK2011-009 | $13.32 | $0.00 | $13.32 |
| CEMENT MASON/CONCRETE FINISHER Heavy SUOK2012-007 | $12.49 | $1.23 | $13.72 |
| CEMENT MASON/CONCRETE FINISHER Canadian Highway SUOK2011-009 | $12.44 | $0.00 | $12.44 |
| Cleveland Highway SUOK2011-009 | $12.55 | $0.00 | $12.55 |
| ELECTRICIAN Heavy SUOK2012-007 | $22.00 | $4.76 | $26.76 |
| FORM WORKER Heavy SUOK2012-007 | $11.77 | 0.00 | $11.77 |
| Grady and Logan Counties Highway SUOK2011-009 | $10.55 | $0.00 | $10.55 |
| Grady, Lincoln, Logan Highway SUOK2011-009 | $12.47 | $0.00 | $12.47 |
| IRONWORKER Heavy IRON0048-005 (Structural, Reinforcing, and Ornamental) | $32.10 | $17.38 | $49.48 |
| IRONWORKER, REINFORCING Highway SUOK2011-009 | $13.63 | $0.00 | $13.63 |
| IRONWORKER, STRUCTURAL Highway SUOK2011-009 | $14.21 | $0.00 | $14.21 |
| LABORER Asphalt Raker and Shoveler Highway SUOK2011-009 | $11.31 | $0.00 | $11.31 |
| LABORER: Common or General Heavy SUOK2012-007 | $11.81 | $1.09 | $12.90 |
| LABORER: Pipelayer Heavy SUOK2012-007 | $11.13 | 0.00 | $11.13 |
| Landscape Highway SUOK2011-009 | $9.63 | $0.00 | $9.63 |
| McClain Highway SUOK2011-009 | $11.93 | $0.00 | $11.93 |
| OPERATOR: Backhoe/Excavator Heavy SUOK2012-007 | $18.17 | $6.28 | $24.45 |
| OPERATOR: Drill Heavy SUOK2012-007 | $17.15 | $0.78 | $17.93 |
| OPERATOR: Grader/Blade Heavy SUOK2012-007 | $17.76 | $3.87 | $21.63 |
| OPERATOR: Loader (Front End) Heavy SUOK2012-007 | $13.51 | 0.00 | $13.51 |
| OPERATOR: Mechanic Heavy SUOK2012-007 | $19.61 | $9.39 | $29.00 |
| OPERATOR: Scraper Heavy SUOK2012-007 | $16.00 | $1.55 | $17.55 |
| OPERATOR: Trackhoe Heavy SUOK2012-007 | $17.50 | $2.78 | $20.28 |
| Pipelayer Highway SUOK2011-009 | $12.50 | $0.00 | $12.50 |
| POWER EQUIPMENT OPERATOR: Asphalt Paver Screed Highway SUOK2011-009 | $12.44 | $0.00 | $12.44 |
| POWER EQUIPMENT OPERATOR: Asphalt Plant Highway SUOK2011-009 | $14.70 | $0.00 | $14.70 |
| POWER EQUIPMENT OPERATOR: Bobcat/Skid Loader Highway SUOK2011-009 | $12.71 | $0.00 | $12.71 |
| POWER EQUIPMENT OPERATOR: Broom Highway SUOK2011-009 | $11.97 | $0.00 | $11.97 |
| POWER EQUIPMENT OPERATOR: Concrete Paving Machine Highway SUOK2011-009 | $13.61 | $0.00 | $13.61 |
| POWER EQUIPMENT OPERATOR: Crane Highway SUOK2011-009 | $16.99 | $0.00 | $16.99 |
| POWER EQUIPMENT OPERATOR: Distributor Truck Highway SUOK2011-009 | $13.81 | $0.00 | $13.81 |
| POWER EQUIPMENT OPERATOR: Excavator Highway SUOK2011-009 | $15.10 | $0.00 | $15.10 |
| POWER EQUIPMENT OPERATOR: Flatbed Truck Highway SUOK2011-009 | $14.69 | $0.00 | $14.69 |
| POWER EQUIPMENT OPERATOR: Group 1 Heavy ENGI0627-015 | $38.09 | $19.05 | $57.14 |
| POWER EQUIPMENT OPERATOR: Group 2 Heavy ENGI0627-015 | $36.14 | $19.05 | $55.19 |
| POWER EQUIPMENT OPERATOR: Group 3 Heavy ENGI0627-015 | $35.40 | $19.05 | $54.45 |
| POWER EQUIPMENT OPERATOR: Group 4 Heavy ENGI0627-015 | $34.07 | $19.05 | $53.12 |
| POWER EQUIPMENT OPERATOR: Group 6 Heavy ENGI0627-015 | $30.87 | $19.05 | $49.92 |
| POWER EQUIPMENT OPERATOR: Group10 Heavy ENGI0627-015 | $27.25 | $19.05 | $46.30 |
| POWER EQUIPMENT OPERATOR: Loader Highway SUOK2011-009 (Front End) Cleveland County | $12.76 | $0.00 | $12.76 |
| POWER EQUIPMENT OPERATOR: Lowboy/Float Highway SUOK2011-009 | $13.90 | $0.00 | $13.90 |
| POWER EQUIPMENT OPERATOR: Mechanic Highway SUOK2011-009 | $15.60 | $0.00 | $15.60 |
| POWER EQUIPMENT OPERATOR: Milling Machine Highway SUOK2011-009 | $14.93 | $0.00 | $14.93 |
| POWER EQUIPMENT OPERATOR: Mixer Highway SUOK2011-009 | $14.43 | $0.00 | $14.43 |
| POWER EQUIPMENT OPERATOR: Off the Road Truck Highway SUOK2011-009 | $13.75 | $0.00 | $13.75 |
| POWER EQUIPMENT OPERATOR: Oiler Highway SUOK2011-009 | $14.06 | $0.00 | $14.06 |
| POWER EQUIPMENT OPERATOR: Pickup Truck Highway SUOK2011-009 | $12.48 | $0.00 | $12.48 |
| POWER EQUIPMENT OPERATOR: Remaining Counties Highway SUOK2011-009 Scope differs by code/WD | $14.08 | $0.00 | $14.08 |
| POWER EQUIPMENT OPERATOR: Remaining Counties Highway SUOK2011-009 Scope differs by code/WD | $13.64 | $0.00 | $13.64 |
| POWER EQUIPMENT OPERATOR: Remaining Counties Highway SUOK2011-009 Scope differs by code/WD | $14.24 | $0.00 | $14.24 |
| POWER EQUIPMENT OPERATOR: Remaining Counties Highway SUOK2011-009 Scope differs by code/WD | $11.70 | $0.00 | $11.70 |
| POWER EQUIPMENT OPERATOR: Remaining Counties Highway SUOK2011-009 Scope differs by code/WD | $14.98 | $0.00 | $14.98 |
| POWER EQUIPMENT OPERATOR: Remaining Counties Highway SUOK2011-009 Scope differs by code/WD | $12.85 | $0.00 | $12.85 |
| POWER EQUIPMENT OPERATOR: Remaining Counties Highway SUOK2011-009 Scope differs by code/WD | $12.73 | $0.00 | $12.73 |
| POWER EQUIPMENT OPERATOR: Remaining Counties Highway SUOK2011-009 Scope differs by code/WD | $13.19 | $0.00 | $13.19 |
| POWER EQUIPMENT OPERATOR: Remaining Counties Highway SUOK2011-009 Scope differs by code/WD | $12.88 | $0.00 | $12.88 |
| POWER EQUIPMENT OPERATOR: Remaining Counties Highway SUOK2011-009 Scope differs by code/WD | $13.72 | $0.00 | $13.72 |
| POWER EQUIPMENT OPERATOR: Roller Highway SUOK2011-009 (Asphalt) Canadian County | $11.67 | $0.00 | $11.67 |
| POWER EQUIPMENT OPERATOR: Roller (Dirt Compaction) Highway SUOK2011-009 | $12.27 | $0.00 | $12.27 |
| POWER EQUIPMENT OPERATOR: Striping Machine Highway SUOK2011-009 | $12.56 | $0.00 | $12.56 |
| POWER EQUIPMENT OPERATOR: Tractor/Box Blade Highway SUOK2011-009 | $16.50 | $0.00 | $16.50 |
| POWER EQUIPMENT OPERATOR: Trencher Highway SUOK2011-009 | $13.63 | $0.00 | $13.63 |
| POWER EQUIPMENT OPERATOR: Water Truck Highway SUOK2011-009 | $12.00 | $0.00 | $12.00 |
| Power Tool Operator Highway SUOK2011-009 (Includes Chipping Guns and Handheld Concrete Saws) | $12.89 | $0.00 | $12.89 |
| Traffic Control Highway SUOK2011-009 (Includes Flagger, Setting Up and Moving Cones/Barrels) | $11.12 | $0.00 | $11.12 |
| Traffic signal installer Highway SUOK2011-009 | $17.37 | $0.00 | $17.37 |
| TRUCK DRIVER: Dump Truck Heavy SUOK2012-007 | $16.50 | $0.74 | $17.24 |
No trade rates match your search and filter selection.
Highway
Applies to
Canadian, Cleveland, Grady, Lincoln, Logan, McClain in Oklahoma.
Heavy
Applies to
Canadian, Cleveland, Grady, Lincoln, McClain in Oklahoma.