OK20260068

Building

Davis-Bacon Act general wage determination for building construction in Oklahoma.

Modification 1, revised 05/18/2026 38 trade rates 14 counties View on SAM.gov

Track OK20260068

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

BOIL0592-001 Effective 01/01/2025
Trade Rate Fringe Total
BOILERMAKER $33.70 $24.41 $58.11
BROK0005-004 Effective 06/01/2023
Trade Rate Fringe Total
BRICKLAYER $26.92 $13.09 $40.01
ELEC0444-005 Effective 08/27/2025
Trade Rate Fringe Total
ELECTRICIAN (KAY AND NOBLE COUNTIES) $41.25 $13.30 $54.55
ELEC0444-007 Effective 08/27/2025
Trade Rate Fringe Total
ELECTRICIAN: ALARM INSTALLATION AND LOW VOLTAGE WIRING ONLY (KAY AND NOBLE COUNTIES) $41.25 $13.30 $54.55
ELEC0602-001 Effective 09/01/2022
Trade Rate Fringe Total
ELECTRICIAN (BEAVER, CIMARRON, AND TEXAS COUNTIES) $29.41 $12.73 $42.14
ELEC0602-002 Effective 09/01/2022
Trade Rate Fringe Total
ELECTRICIAN: ALARM INSTALLATION AND LOW VOLTAGE WIRING ONLY (BEAVER, CIMARRON, AND TEXAS COUNTIES) $29.41 $12.73 $42.14
ELEC1141-013 Effective 05/26/2025
Trade Rate Fringe Total
ELECTRICIAN (ALFALFA, BLAINE, DEWEY, ELLIS, GRANT, HARPER, KINGFISHER, MAJOR AND WOODWARD COUNTIES) $41.40 $13.14 $54.54
ELEC1141-026 Effective 05/26/2025
Trade Rate Fringe Total
ELECTRICIAN: ALARM INSTALLATION AND LOW VOLTAGE WIRING ONLY (ALFALFA, BLAINE, DEWEY, ELLIS, GRANT, HARPER, KINGFISHER, MAJOR AND WOODWARD COUNTIES) $24.26 $9.76 $34.02
ENGI0627-012 Effective 06/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT $28.77 $19.05 $47.82
POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER $34.07 $19.05 $53.12
POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) $35.40 $19.05 $54.45
POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY $36.14 $19.05 $55.19
POWER EQUIPMENT OPERATOR: GROUP 10 OILER $27.25 $19.05 $46.30
POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES $38.09 $19.05 $57.14
IRON0048-012 Effective 06/01/2025
Trade Rate Fringe Total
IRONWORKER, STRUCTURAL (ALFALFA, BEAVER, BLAINE, CIMARRON, DEWEY, ELLIS, GRANT, HARPER, KINGFISHER, MAJOR, NOBLE, TEXAS, AND WOODWARD COUNTIES) $32.10 $17.38 $49.48
IRON0584-023 Effective 06/01/2024
Trade Rate Fringe Total
IRONWORKER, STRUCTURAL (KAY COUNTY) $30.35 $16.83 $47.18
PLAS0518-028 Effective 03/01/2025
Trade Rate Fringe Total
PLASTERER $33.62 $14.18 $47.80
PLUM0344-013 Effective 07/01/2025
Trade Rate Fringe Total
PIPEFITTER: HVAC PIPE INSTALLATION (ALFALFA, BEAVER, BLAINE, CIMARRON, DEWEY, ELLIS, GRANT, HARPER, KINGFISHER, MAJOR, NOBLE, TEXAS AND WOODWARD COUNTIES) $41.00 $16.03 $57.03
PLUM0344-014 Effective 07/01/2025
Trade Rate Fringe Total
PLUMBER: EXCLUDES HVAC PIPE INSTALLATION (ALFALFA, BEAVER, BLAINE, CIMARRON, DEWEY, ELLIS, GRANT, HARPER, KINGFISHER, MAJOR, NOBLE, TEXAS AND WOODWARD COUNTIES) $41.00 $16.03 $57.03
PLUM0430-013 Effective 07/01/2025
Trade Rate Fringe Total
PIPEFITTER: HVAC PIPE INSTALLATION (KAY COUNTY) $36.65 $16.03 $52.68
PLUM0430-014 Effective 07/01/2025
Trade Rate Fringe Total
PLUMBER: EXCLUDES HVAC PIPE INSTALLATION (KAY COUNTY) $36.65 $16.03 $52.68
SHEE0124-009 Effective 07/01/2021
Trade Rate Fringe Total
SHEET METAL WORKER (HVAC DUCT AND UNIT INSTALLATION ONLY) $33.38 $16.36 $49.74
SUOK2012-048 Effective 06/18/2012
Trade Rate Fringe Total
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION $16.32 $0.00 $16.32
ROOFER $15.00 $0.29 $15.29
PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION $19.00 $0.00 $19.00
PAINTER: DRYWALL FINISHING/TAPING $12.00 $0.00 $12.00
PAINTER: BRUSH, ROLLER AND SPRAY $12.18 $0.00 $12.18
OPERATOR: ROLLER $13.80 $0.94 $14.74
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $19.34 $0.74 $20.08
LABORER: PLASTER TENDER $10.17 $0.00 $10.17
LABORER: PIPELAYER $13.03 $0.00 $13.03
LABORER: MASON TENDER - CEMENT/CONCRETE $13.04 $0.00 $13.04
LABORER: MASON TENDER - BRICK $11.88 $0.00 $11.88
LABORER: COMMON OR GENERAL $9.00 $0.00 $9.00
CEMENT MASON/CONCRETE FINISHER $16.10 $0.00 $16.10
CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION $15.58 $5.50 $21.08
CARPENTER (FORM WORK ONLY) $15.34 $5.50 $20.84
CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) $14.16 $0.00 $14.16

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 14 counties in Oklahoma.

Get notified when OK20260068 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.