OK20260008
rev 0Residential
0 trades
Applies to
Alfalfa, Beaver, Beckham, Blaine, Caddo, Cimarron, Custer, Dewey, Ellis, Garfield +11 more
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| Air Conditioning & Heating Mechanic Residential SUOK1997-003 | $8.00 | $0.00 | $8.00 |
| Asphalt Raker and Shoveler Highway SUOK2011-008 | $11.18 | $0.64 | $11.82 |
| BOILERMAKER Building BOIL0592-001 | $33.70 | $24.41 | $58.11 |
| BRICKLAYER Residential SUOK1997-003 | $8.00 | $0.00 | $8.00 |
| BRICKLAYER Building BROK0005-004 | $26.92 | $13.09 | $40.01 |
| CARPENTER Residential SUOK1997-003 | $7.25 | $0.00 | $7.25 |
| CARPENTER Building SUOK2012-048 (Drywall Hanging and Metal Stud Installation Only) | $14.16 | 0.00 | $14.16 |
| CARPENTER (Excludes Form Work) Highway SUOK2011-008 | $13.32 | $0.00 | $13.32 |
| CARPENTER (Form Work Only) Heavy SUOK2012-012 | $14.00 | 0.00 | $14.00 |
| CARPENTER (Form Work Only) Building SUOK2012-048 | $15.34 | $5.50 | $20.84 |
| CARPENTER, Excludes Drywall Hanging, Form Work, and Metal Stud Installation Building SUOK2012-048 | $15.58 | $5.50 | $21.08 |
| CEMENT MASON/CONCRETE FINISHER Residential SUOK1997-003 | $8.00 | $0.00 | $8.00 |
| CEMENT MASON/CONCRETE FINISHER Building SUOK2012-048 | $16.10 | 0.00 | $16.10 |
| Common or General Alfalfa and Kay Counties Highway SUOK2011-008 | $10.50 | $0.00 | $10.50 |
| DRYWALL HANGER Residential SUOK1997-003 | $8.00 | $0.00 | $8.00 |
| ELECTRICIAN Residential SUOK1997-003 | $7.25 | $0.00 | $7.25 |
| ELECTRICIAN Heavy ELEC0602-009 Scope differs by code/WD | $29.41 | $12.73 | $42.14 |
| ELECTRICIAN Heavy ELEC1002-006 Scope differs by code/WD | $51.00 | $8.75 | $59.75 |
| ELECTRICIAN Building ELEC0444-005 Scope differs by code/WD | $41.25 | $13.30 | $54.55 |
| ELECTRICIAN Building ELEC0444-007 (Alarm Installation and Low Voltage Wiring Only) | $41.25 | $13.30 | $54.55 |
| ELECTRICIAN Building ELEC0602-001 Scope differs by code/WD | $29.41 | $12.73 | $42.14 |
| ELECTRICIAN Building ELEC0602-002 (Alarm Installation and Low Voltage Wiring Only) | $29.41 | $12.73 | $42.14 |
| ELECTRICIAN Building ELEC1141-013 Scope differs by code/WD | $41.40 | $6.00 | $47.40 |
| ELECTRICIAN Building ELEC1141-026 (Alarm Installation and Low Voltage Wiring Only) | $24.26 | $6.00 | $30.26 |
| FORM WORKER Highway SUOK2011-008 | $12.55 | $0.00 | $12.55 |
| GUARDRAIL INSTALLER Highway SUOK2011-008 (Includes Guardrail/Post Driver Work) | $9.70 | $0.00 | $9.70 |
| IRONWORKER, REINFORCING Highway SUOK2011-008 | $13.63 | $0.00 | $13.63 |
| IRONWORKER, STRUCTURAL Heavy IRON0048-007 Scope differs by code/WD | $32.10 | $17.38 | $49.48 |
| IRONWORKER, STRUCTURAL Heavy IRON0584-021 Scope differs by code/WD | $30.35 | $16.83 | $47.18 |
| IRONWORKER, STRUCTURAL Building IRON0048-012 Scope differs by code/WD | $32.10 | $17.38 | $49.48 |
| IRONWORKER, STRUCTURAL Building IRON0584-023 Scope differs by code/WD | $30.35 | $16.83 | $47.18 |
| LABORER Air/Power Tool Operator Highway SUOK2011-008 (Includes Handheld Concrete Saws and Chipping Guns) | $12.79 | $0.00 | $12.79 |
| LABORER: Common or General Heavy SUOK2012-012 | $11.96 | 0.00 | $11.96 |
| LABORER: Common or General Building SUOK2012-048 | $9.00 | 0.00 | $9.00 |
| LABORER: Mason Tender - Brick Building SUOK2012-048 | $11.88 | 0.00 | $11.88 |
| LABORER: Mason Tender - Cement/Concrete Building SUOK2012-048 | $13.04 | 0.00 | $13.04 |
| LABORER: Pipelayer Heavy SUOK2012-012 | $11.00 | $0.30 | $11.30 |
| LABORER: Pipelayer Building SUOK2012-048 | $13.03 | 0.00 | $13.03 |
| LABORER: Plaster Tender Building SUOK2012-048 | $10.17 | 0.00 | $10.17 |
| Laborers: Laborers Residential SUOK1997-003 | $7.25 | $0.00 | $7.25 |
| Laborers: Mason tenders Residential SUOK1997-003 | $7.25 | $0.00 | $7.25 |
| Laborers: Mortar mixers Residential SUOK1997-003 | $7.25 | $0.00 | $7.25 |
| Laborers: PAINTER: Brush Only Residential SUOK1997-003 | $7.25 | $0.00 | $7.25 |
| Laborers: PLUMBER Residential SUOK1997-003 | $7.25 | $0.00 | $7.25 |
| Laborers: ROOFER Residential SUOK1997-003 | $7.25 | $0.00 | $7.25 |
| OPERATOR: Backhoe Heavy SUOK2012-012 | $18.00 | $0.97 | $18.97 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUOK2012-048 | $19.34 | $0.74 | $20.08 |
| OPERATOR: OPERATOR: Roller Building SUOK2012-048 | $13.80 | $0.94 | $14.74 |
| OPERATOR: PAINTER: Brush, Roller and Spray Building SUOK2012-048 | $12.18 | 0.00 | $12.18 |
| OPERATOR: PAINTER: Drywall Finishing/Taping Building SUOK2012-048 | $12.00 | 0.00 | $12.00 |
| OPERATOR: PIPEFITTER, Excludes HVAC Pipe Installation Building SUOK2012-048 | $19.00 | 0.00 | $19.00 |
| OPERATOR: ROOFER Building SUOK2012-048 | $15.00 | $0.29 | $15.29 |
| OPERATOR: Scraper Heavy SUOK2012-012 | $14.00 | 0.00 | $14.00 |
| OPERATOR: SHEET METAL WORKER, Excludes HVAC Duct and Unit Installation Building SUOK2012-048 | $16.32 | 0.00 | $16.32 |
| PIPEFITTER Building PLUM0344-013 (HVAC Pipe Installation) | $41.00 | $16.03 | $57.03 |
| PIPEFITTER Building PLUM0430-013 (HVAC Pipe Installation) | $36.65 | $16.03 | $52.68 |
| Pipelayer Highway SUOK2011-008 | $11.83 | $0.00 | $11.83 |
| PLASTERER Building PLAS0518-028 | $33.62 | $14.18 | $47.80 |
| PLUMBER Building PLUM0344-014 (Excludes HVAC Pipe Installation) | $41.00 | $16.03 | $57.03 |
| PLUMBER Building PLUM0430-014 (Excludes HVAC Pipe Installation) | $36.65 | $16.03 | $52.68 |
| POWER EQUIPMENT OPERATOR: Asphalt Paver Screed Highway SUOK2011-008 | $13.38 | $0.00 | $13.38 |
| POWER EQUIPMENT OPERATOR: Asphalt Paving Machine Highway SUOK2011-008 | $12.71 | $0.00 | $12.71 |
| POWER EQUIPMENT OPERATOR: Asphalt Plant Highway SUOK2011-008 | $14.70 | $0.00 | $14.70 |
| POWER EQUIPMENT OPERATOR: Bobcat/Skid Loader Highway SUOK2011-008 | $12.87 | $0.00 | $12.87 |
| POWER EQUIPMENT OPERATOR: Broom Highway SUOK2011-008 | $11.72 | $0.00 | $11.72 |
| POWER EQUIPMENT OPERATOR: Bulldozer Highway SUOK2011-008 | $13.95 | $0.00 | $13.95 |
| POWER EQUIPMENT OPERATOR: Concrete Paving Machine Highway SUOK2011-008 | $14.42 | $0.00 | $14.42 |
| POWER EQUIPMENT OPERATOR: Concrete Saw Highway SUOK2011-008 | $12.46 | $0.00 | $12.46 |
| POWER EQUIPMENT OPERATOR: Crane Highway SUOK2011-008 | $16.88 | $0.00 | $16.88 |
| POWER EQUIPMENT OPERATOR: Distributor Truck Highway SUOK2011-008 | $14.98 | $0.00 | $14.98 |
| POWER EQUIPMENT OPERATOR: Dump Truck Highway SUOK2011-008 | $13.17 | $0.00 | $13.17 |
| POWER EQUIPMENT OPERATOR: Excavator Highway SUOK2011-008 | $16.19 | $0.00 | $16.19 |
| POWER EQUIPMENT OPERATOR: Flatbed Truck Highway SUOK2011-008 | $14.68 | $0.00 | $14.68 |
| POWER EQUIPMENT OPERATOR: Grader/Blade Remaining Counties Highway SUOK2011-008 | $14.82 | $0.00 | $14.82 |
| POWER EQUIPMENT OPERATOR: Group 1 Heavy ENGI0627-016 | $38.09 | $19.05 | $57.14 |
| POWER EQUIPMENT OPERATOR: Group 1 Building ENGI0627-012 | $38.09 | $19.05 | $57.14 |
| POWER EQUIPMENT OPERATOR: Group 2 Heavy ENGI0627-016 | $36.14 | $19.05 | $55.19 |
| POWER EQUIPMENT OPERATOR: Group 2 Building ENGI0627-012 | $36.14 | $19.05 | $55.19 |
| POWER EQUIPMENT OPERATOR: Group 3 Heavy ENGI0627-016 | $35.40 | $19.05 | $54.45 |
| POWER EQUIPMENT OPERATOR: Group 3 Building ENGI0627-012 | $35.40 | $19.05 | $54.45 |
| POWER EQUIPMENT OPERATOR: Group 4 Heavy ENGI0627-016 | $34.07 | $19.05 | $53.12 |
| POWER EQUIPMENT OPERATOR: Group 4 Building ENGI0627-012 | $34.07 | $19.05 | $53.12 |
| POWER EQUIPMENT OPERATOR: Group 5 Heavy ENGI0627-016 | $32.71 | $19.05 | $51.76 |
| POWER EQUIPMENT OPERATOR: Group 6 Heavy ENGI0627-016 | $30.87 | $19.05 | $49.92 |
| POWER EQUIPMENT OPERATOR: Group 8 Heavy ENGI0627-016 | $28.77 | $19.05 | $47.82 |
| POWER EQUIPMENT OPERATOR: Group 8 Building ENGI0627-012 | $28.77 | $19.05 | $47.82 |
| POWER EQUIPMENT OPERATOR: Group 9 Heavy ENGI0627-016 | $28.25 | $19.05 | $47.30 |
| POWER EQUIPMENT OPERATOR: Group10 Heavy ENGI0627-016 | $27.25 | $19.05 | $46.30 |
| POWER EQUIPMENT OPERATOR: Group10 Building ENGI0627-012 | $27.25 | $19.05 | $46.30 |
| POWER EQUIPMENT OPERATOR: Loader (Front End) Highway SUOK2011-008 | $12.82 | $0.00 | $12.82 |
| POWER EQUIPMENT OPERATOR: Lowboy/Float Highway SUOK2011-008 | $16.00 | $0.00 | $16.00 |
| POWER EQUIPMENT OPERATOR: Mechanic Highway SUOK2011-008 | $15.79 | $0.00 | $15.79 |
| POWER EQUIPMENT OPERATOR: Milling Machine Highway SUOK2011-008 | $13.51 | $0.00 | $13.51 |
| POWER EQUIPMENT OPERATOR: Mixer Highway SUOK2011-008 | $14.56 | $0.00 | $14.56 |
| POWER EQUIPMENT OPERATOR: Off the Road Truck Highway SUOK2011-008 | $12.55 | $0.00 | $12.55 |
| POWER EQUIPMENT OPERATOR: Oiler Highway SUOK2011-008 | $13.84 | $0.00 | $13.84 |
| POWER EQUIPMENT OPERATOR: Remaining Counties Highway SUOK2011-008 Scope differs by code/WD | $13.61 | $0.00 | $13.61 |
| POWER EQUIPMENT OPERATOR: Remaining Counties Highway SUOK2011-008 Scope differs by code/WD | $13.57 | $0.00 | $13.57 |
| POWER EQUIPMENT OPERATOR: Roller (Asphalt) Highway SUOK2011-008 | $11.76 | $0.00 | $11.76 |
| POWER EQUIPMENT OPERATOR: Roller (Dirt Compaction) Highway SUOK2011-008 | $12.12 | $0.00 | $12.12 |
| POWER EQUIPMENT OPERATOR: Rotomill Highway SUOK2011-008 | $17.33 | $0.00 | $17.33 |
| POWER EQUIPMENT OPERATOR: Scraper Highway SUOK2011-008 | $12.00 | $0.00 | $12.00 |
| POWER EQUIPMENT OPERATOR: Single Axle Truck Highway SUOK2011-008 (Includes Pilot Car) | $12.32 | $0.00 | $12.32 |
| POWER EQUIPMENT OPERATOR: Straight Truck Highway SUOK2011-008 | $15.92 | $0.00 | $15.92 |
| POWER EQUIPMENT OPERATOR: Striping Machine Highway SUOK2011-008 | $12.11 | $0.00 | $12.11 |
| POWER EQUIPMENT OPERATOR: Tractor/Box Blade Highway SUOK2011-008 | $12.61 | $0.00 | $12.61 |
| POWER EQUIPMENT OPERATOR: Transfer Material Machine Highway SUOK2011-008 | $12.38 | $0.75 | $13.13 |
| POWER EQUIPMENT OPERATOR: Trencher Highway SUOK2011-008 | $14.66 | $0.00 | $14.66 |
| POWER EQUIPMENT OPERATOR: TRUCK DRIVER Concrete Truck Highway SUOK2011-008 | $14.22 | $0.00 | $14.22 |
| POWER EQUIPMENT OPERATOR: Water Truck Remaining Counties Highway SUOK2011-008 | $12.00 | $0.00 | $12.00 |
| Remaining Counties Highway SUOK2011-008 Scope differs by code/WD | $14.09 | $0.00 | $14.09 |
| Remaining Counties Highway SUOK2011-008 Scope differs by code/WD | $10.57 | $0.00 | $10.57 |
| SHEET METAL WORKER Building SHEE0124-009 (HVAC Duct and Unit Installation Only) | $33.38 | $16.36 | $49.74 |
| Traffic Control Highway SUOK2011-008 (Includes Flagger, Setting Up and Moving Cones/Barrels) | $10.12 | $0.00 | $10.12 |
| TRUCK DRIVER Heavy TEAM0516-006 (3) Flatbed Truck | $30.85 | $16.65 | $47.50 |
| Vibrating Plate Highway SUOK2011-008 | $12.70 | $0.00 | $12.70 |
No trade rates match your search and filter selection.
Residential
Applies to
Alfalfa, Beaver, Beckham, Blaine, Caddo, Cimarron, Custer, Dewey, Ellis, Garfield +11 more
Highway
Applies to
Alfalfa, Beaver, Blaine, Cimarron, Dewey, Ellis, Garfield, Grant, Harper, Kay +7 more
Heavy
Applies to
Alfalfa, Beaver, Blaine, Cimarron, Dewey, Ellis, Garfield, Grant, Harper, Kay +5 more
Building
Applies to
Alfalfa, Beaver, Blaine, Cimarron, Dewey, Ellis, Grant, Harper, Kay, Kingfisher +4 more