PA20260004
HeavyHighwayDavis-Bacon Act general wage determination for heavy, highway construction in Pennsylvania.
Track PA20260004
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
BOIL0013-003 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $55.00 | $35.48 | $90.48 |
CARP0219-005 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MILLWRIGHT | $54.54 | $38.78 | $93.32 |
CARP0255-006 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER FOOTNOTE: A. PAID HOLIDAY: LABOR DAY | $57.36 | $30.09 | $87.45 |
CARP0474-004 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PILEDRIVERMAN | $48.25 | $44.92 | $93.17 |
ELEC0098-001 Effective 05/05/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (BUCKS COUNTY: STARTING AT THE DELAWARE RIVER AND FOLLOWING THE WEST LIMITS OF THE BOROUGH OF BRISTOL, ALONG THE CONTINUATION OF U.S. HIGHWAY 13 AND UNDER THE PENNSYLVANIA RAILROAD BRIDGE TO ROUTE 09113, NORTH 09113 TO ROUTE 152, NORTH ALONG ROUTE 152 TO THE HUMEVILLE ROAD, EAST ON HUMEVILLE ROAD TO ROUTE 333, NORTH ON ROUTE 344 TO THE JUNCTION OF SPURS 281 AND 252, CONTINUE NORTH ON SPUR 252 TO ROUTE 09028, WEST ON 09028 TO ROUTE 152, NORTH ON 152 TO TR 232, NORTH ON TR 532 | $70.97 | $46.13 | $117.10 |
ELEC0102-003 Effective 06/02/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (BUCKS COUNTY (PLUMSTEAD, BEDMINISTER, TINICUM, NOCKAMIXON, BRIDGETON AND DURHAM TOWNSHIPS IN THEIR ENTIREY, AND THAT PORTION OF HAYCOCK AND SPRINGFIELD TOWNSHIPS EAST OF A LINE FOLLOWING STATE HIGHWAY 412, FROM NORTHAMPTON COUNTY SOUTH TO ROUTE 09071 TO STATE HIGHWAY 212, ALONG HIGHWAY 212 TO ROUTE 09068, AND ALONG 09068 TO STATE HIGHWAY 313. ALSO INCLUDED IS THAT PORTION OF DUBLIN BOROUGH EAST OF STATE HIGHWAY 313) | $65.43 | $42.20 | $107.63 |
ELEC0126-002 Effective 06/03/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LINE CONSTRUCTION: WINCH TRUCK OPERATOR (CHESTER, DELAWARE, MONTGOMERY, PHILADELPHIA, AND REMAINDER OF BUCKS COUNTY) | $43.78 | $26.49 | $70.27 |
| LINE CONSTRUCTION: TRUCK DRIVER (CHESTER, DELAWARE, MONTGOMERY, PHILADELPHIA, AND REMAINDER OF BUCKS COUNTY) | $40.65 | $25.42 | $66.07 |
| LINE CONSTRUCTION: LINEMAN (CHESTER, DELAWARE, MONTGOMERY, PHILADELPHIA, AND REMAINDER OF BUCKS COUNTY) | $62.54 | $32.92 | $95.46 |
| LINE CONSTRUCTION: GROUNDMAN (CHESTER, DELAWARE, MONTGOMERY, PHILADELPHIA, AND REMAINDER OF BUCKS COUNTY) | $37.52 | $24.35 | $61.87 |
| LINE CONSTRUCTION: CABLE SPLICER (CHESTER, DELAWARE, MONTGOMERY, PHILADELPHIA, AND REMAINDER OF BUCKS COUNTY) | $62.54 | $32.92 | $95.46 |
ELEC0269-001 Effective 01/05/2026 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (BUCKS COUNTY (AREA EAST OF A LINE STARTING AT THE DELAWARE RIVER AND FOLLOWING THE WEST LIMITS OF THE BOROUGH OF BRISTOL, ALONG THE CONTINUATION OF U.S. HIGHWAY 13 AND UNDER THE PENNSYLVANIA RAILROAD BRIDGE TO ROUTE 09113, NORTH ALONG 09113 TO ROUTE 152, NORTH ALONG ROUTE 152 TO THE HULMEVILLE RD., EAST ON THE HULMEVILLE TO ROUTE 344, NORTH ON ROUTE 344 TO THE JUNCTION OF SPURS 281 AND 252 CONTINUE NORTH ON SPUR 252 AND ROUTE 09028, WEST ON 09028 TO ROUTE 152, NORTH ON 152 TO TR 53 | $63.82 | $41.99 | $105.81 |
ELEC0269-002 Effective 07/07/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LINE CONSTRUCTION:: LINEMEN AND HEAVY EQUIPMENT OPERATOR (BUCKS COUNTY - THAT PORTION EAST OF A LINE STARTING AT THE DELAWARE RIVER AND FOLLOWING THE WEST LIMITS OF THE BOROUGH OF BRISTOL, ALONG THE CONTINUATION OF U.S. HIGHWAY 13 AND UNDER THE PENNSYLVANIA RAILROAD BRIDGE TO ROUTE 09113, NORTH ALONG 09113 TO ROUTE 152, NORTH ALONG ROUTE 152 TO THE HULMEVILLE RD., EAST ON THE HULMEVILLE TO ROUTE 344, NORTH ON ROUTE 344 TO THE JUNCTION OF SPURS 281 AND 252 CONTINUE NORTH ON SPUR 252 AND ROUTE 09 | $61.84 | $40.04 | $101.88 |
| LINE CONSTRUCTION:: GROUNDMAN, TRUCK DRIVER (BUCKS COUNTY - THAT PORTION EAST OF A LINE STARTING AT THE DELAWARE RIVER AND FOLLOWING THE WEST LIMITS OF THE BOROUGH OF BRISTOL, ALONG THE CONTINUATION OF U.S. HIGHWAY 13 AND UNDER THE PENNSYLVANIA RAILROAD BRIDGE TO ROUTE 09113, NORTH ALONG 09113 TO ROUTE 152, NORTH ALONG ROUTE 152 TO THE HULMEVILLE RD., EAST ON THE HULMEVILLE TO ROUTE 344, NORTH ON ROUTE 344 TO THE JUNCTION OF SPURS 281 AND 252 CONTINUE NORTH ON SPUR 252 AND ROUTE 09028, WEST ON | $49.47 | $32.03 | $81.50 |
| LINE CONSTRUCTION:: CABLE SPLICER (BUCKS COUNTY - THAT PORTION EAST OF A LINE STARTING AT THE DELAWARE RIVER AND FOLLOWING THE WEST LIMITS OF THE BOROUGH OF BRISTOL, ALONG THE CONTINUATION OF U.S. HIGHWAY 13 AND UNDER THE PENNSYLVANIA RAILROAD BRIDGE TO ROUTE 09113, NORTH ALONG 09113 TO ROUTE 152, NORTH ALONG ROUTE 152 TO THE HULMEVILLE RD., EAST ON THE HULMEVILLE TO ROUTE 344, NORTH ON ROUTE 344 TO THE JUNCTION OF SPURS 281 AND 252 CONTINUE NORTH ON SPUR 252 AND ROUTE 09028, WEST ON 09028 TO R | $68.02 | $44.04 | $112.06 |
ELEC0313-003 Effective 06/01/2011 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (DELAWARE COUNTY :(THAT PORTION SOUTH OF U.S. HIGHWAY NO. 1 AND WEST OF U.S. HIGHWAY NO. 202) CHESTER COUNTY (THAT PORTION SOUTH AND EAST OF U. S. HIGHWAY 1)) | $35.00 | $23.70 | $58.70 |
ELEC0375-001 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (BUCKS COUNTY (EAST ROCK HILL, WEST ROCK HILL, MILFORD AND RICHLAND TOWSHIPS IN THEIR ENTIRETY AND THAT PORTION OF HAYCOCK AND SPRINGFIELD TOWNSHIPS WEST OF A LINE FOLLOWING STATE HIGHWAY 212 FROM NORTHAMPTON COUNTY SOUTH TO ROUTE 09071 ALONG 09071 TO STATE HIGHWAY 212, ALONG HIGHWAY 212 TO ROUTE 09068 AND ALONG 09068 TO STATE HIGHWAY 313) MONTGOMERY COUNTY(UPPER HANOVER TWP.IN ITS ENTIRETY)) | $50.00 | $25.93 | $75.93 |
ELEC0380-001 Effective 05/05/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (BUCKS COUNTY (HILLTOWN AND NEW BRITAIN TOWNSHIPS IN THEIR ENTIRETY; THAT PORTION OF TELFORD BOROUGH NORTHEAST OF COUNTY LINE ROAD (MAIN STREET) AND BOUNDED BY WEST ROCK HILL AND HILLTOWN TOWNSHIP THAT PORTION OF DUBLIN BOROUGH WEST OF STATE HIGHWAY 313, AND THAT PORTION OF DOYLESTOWN AND WARRINGTON TOWNSHIPS AND DOYLESTOWN BOROUGH NORTHWEST OF A LINE FOLLOWING U.S. HIGHWAY 611 SOUTH FROM ROUTE 09064 TO THE SPUR OF ROUTE 270, AND PROCEEDING NORTHWEST ALONG THE SPUR TO ROUTE 3 | $58.63 | $46.58 | $105.21 |
ELEC0654-001 Effective 06/02/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (DELAWARE COUNTY (THE PORTION SOUTH OF U.S. HIGHWAY 30 AND NORTH OF THAT PART U.S. HIGHWAY 1 BETWEEN U.S. HIGHWAY 202 AND THE CHESTER COUNTY LINE, AND EAST OF THAT PART OF U.S. HIGHWAY 202 BETWEEN U.S. HIGHWAY 1 AND THE DELAWARE LINE, AND WEST OF A LINE EXTENDING FROM MONTGOMERY COUNTY ALONG STATE ROUTE 320 TO MAPLE, THEN ALONG THE SPRINGFIELD ROAD TO SAXER AVENUE, ALONG SAXER AVENUE TO POWELL ROAD; ALONG POWELL ROAD TO STATE HIGHWAY 420; ALONG 420 AND CONTINUING IN A STRAIGHT LINE | $52.71 | $39.97 | $92.68 |
ELEC0743-001 Effective 09/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (CHESTER (COATESVILLE, HONEY BROOK, SOUTH COVENTY, VALLEY, WALLACE, WARWICH, WEST BRANDYWINE, WEST CLAN, AND WEST NANTMEAL TWPS); AND MONTGOMERY (DOUGLAS, POTTSTOWN, UPPER POTTSGROVE, AND WEST POTTSGROVE, TWPS) COUNTIES) | $46.02 | $27.98 | $74.00 |
ELEC0743-007 Effective 09/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (CHESTER COUNTY (THE PORTION OF SADSBURY AND WEST SADSBURY TOWNSHIP NORTH OF U.S. HIGHWAY 30)) | $46.02 | $27.98 | $74.00 |
ENGI0542-005 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 6 FIREMAN, OILERS AND DECK HANDS (PERSONNEL BOATS), GREASE TRUCK. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY AND CHRISTMAS DAY **TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $46.02 | $31.48 | $77.50 |
| POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 5 COMPRESSORS PUMPS, WELL POINT PUMPS, WELDING MACHINES TIREMAN, POWER EQUIPMENT, MAINTENANCE ENGINEER (POWER BOATS), AND MACNINES SIMILAR TO THE ABOVE. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY AND CHRISTMAS DAY **TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $47.00 | $31.78 | $78.78 |
| POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 4 SEAMAN, PULVERZER FORM LINE GRADER, FARM TRACTORS, ROAD FINISHING, CONCRETE SPREADER, POWER BROOM (SELF-CONTAINED), SEED SPREADER, GREASE TRUCK. MEMORIAL DAY;INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY AND CHRISTMAS DAY **TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $48.73 | $32.28 | $81.01 |
| POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 3 ASPHALT PLANT ENGINEERS, WELL DRILLERS, DITCH WITCH (SMALL TRENCHER), MOTOR PATROLS, FINE GRADE MACHINES, TEN-TON ROLLER (GRADE FILL STONE BASE), CONCRETE BREAKING MACHINES, GUILLOLINE ONLY, STUMP GRINDER, CONVEYORS (EXCEPT BUILDING CONVEYORS), FORK LIFT TRUCKS OF ALL TYPES, HIGH PRESSURE BOLIERS, MACHINE SIMILAR TO THE ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY AND CHRISTMAS DAY **TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $49.03 | $32.37 | $81.40 |
| POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 2A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBLIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE CUBIC YARD FACTORY RATING; ALL TYPES OF CRANES 15 TON AND OVER FACTORY RATING; SINGLE PERSON OPERATION TRUCK CRANES 15 TON AND OVER FACTORY RATING; CHERRY PICKER TYPE MACHINERY AND EQUIPMENT 15 TON AND OVER FACTORY RATING; CONCRETE PUMPS (HEAVY/HIGHWAY); MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. MEMORIAL DAY;INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY AND CHRISTMAS DAY **TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $56.13 | $34.45 | $90.58 |
| POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 2 ALL TYPES OF CRANES, ALL TYPES OF BACKHOES, CABLEWAYS, DRAGLINES, KEYSTONES, ALL TYPES OF SHOVELS, DERRICKS, PAVERS 21E AND OVER, TRENCHING MACHINES, TRENCH SHOVEL, GRADDALLS, FRONT-END LOADERS, BOAT CAPTAIN, PIPPIN TYPE BACKHOES, TANDEMS SCRAPERS, TOWERS TYPE CRANE OPERATION ERECTING, DISMANTLING, JUMPING OR JACKING, DRILLS (SELF-CONTAINES), (DRILLMASTER TYPE) FORKLIFT (20 FT. AND OVER), MOTER PATROLS (FINE GRADE), BATCH PLANT WITH MIXER, CARRYALLS, SCRAPER, TROUNAPULLS, ROLLER (HITH GRADE FINISHING), SPREADERS (ASPHALT), BULLDOZERS AND TRACTORS, MECHANIC WELDER, CONVEYOR LOADERS (EUCLID-TYPE WHEEL), CONCRETE PUMP, MILLING MACHINES, HOIST WITH TWO TOWERS, BUILDING HOIST DOUBLE DRUM (UNLESS USED AS A SINGLE DRUM), MUCKING MACHINES IN TUNNEL, ALL AUTO GRADE AND CONCRETE FINISHING MACHINES, BUNDLE PULLERS/EXTRACTORS (TUBLAR), TOXIC/HAZARDOUS WASTE REMOVAL RATE 20 PER CENT ADDED TO ALL CLASSIFICIATION, BOBCAT, SIDE BROOM, DIRECTIONAL BORING MACHINES, VERMEET SAW TYPE MACHINES ( OTHER THAN HAND HELD) TRACTOR MOUNTED HYDRO AXE, CHIPPER WITH BOOM, ALL MACHINE SIMILAR TO THE ABOVE INCLUDIDNG REMOTE CONTROL EQUIPMENT. 3: ASPHALT PLANT ENGINEERS, WELL DRILLERS, DITCH WITCH (SMALL TRENCHER), MOTOR PATROLS, FINE GRADE MACHINES, TEN-TON ROLLER (GRADE FILL STONE BASE), CONCRETE BREAKING MACHINES, GUILLOLINE ONLY, STUMP GRINDER, CONVEYORS (EXCEPT BUILDING CONVEYORS), FORK LIFT TRUCKS OF ALL TYPES, HIGH PRESSURE BOLIERS, MACHINE SIMILAR TO THE ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT. MEMORIAL DAY;INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY AND CHRISTMAS DAY **TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $53.11 | $33.58 | $86.69 |
| POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 1A MACHINES HANDLING STEEL, OR THE FUNCTIONAL EQUIVALENT, AND STONE IN CONNECTION WITH ERECTION 15 TON AND OVER FACTORY RATING; CRANES DOING HOOK WORK 15 TON AND OVER FACTORY RATING; ANY MACHINES HANDLING MACHINERY; HIGH RAIL/BURRO CRANE 15 TON AND OVER FACTORY RATING; RAIL LOADER (WINCH BOOM TYPE) 15 TON AND OVER FACTORY RATING; CONCRETE PUMPS (BUILDING) 120 FEET OF BOOM LENGTH OR LESS (200 YARD POUR OR LESS); MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. MEMORIAL DAY;INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY AND CHRISTMAS DAY **TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $56.37 | $34.53 | $90.90 |
| POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 1 HANDLING STEEL AND STONE IN CONNECTION WITH ERECTION, CRANES DOING HOOK WORK, ANY MACHINE HANDLING MACHINERY, HELICOPTERS, CONCRETE PUMPS BUILDING MACHINES SIMILAR TO THE ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY AND CHRISTMAS DAY **TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $53.36 | $33.65 | $87.01 |
IRON0401-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, STRUCTURAL AND ORNAMENTAL (BUCKS (INCLUDES THE TOWNS OF BENSALEM, BREADYSVILLE, BRISTOL CHURCHVILLE, CORNWELLS HEIGHTS, DAVISVILLE, EDDINGTON, FEASTERVILLE, HARTSVILLE, JOHNSVILLE, LINE LEXINGTON, NESHAMINY, SOUTHAMPTON, TRADESVILLE, TREVOSE, UNIONVILLE, WARMINSTER, AND WARRINGTON): DELAWARE (NORTH OF A LINE RUNNING ALONG STATE RT 352 TO RIGHT ON STATE RT 291 TO STATE LINE); CHESTER (INCLUDES THE TOWNS OF ALDHAM, ANSELMA, BACTON, BERWYN, CEDAR HOLLOW, CHARLESTOWN, CHESTER SPRINGS, C | $56.50 | $45.30 | $101.80 |
IRON0405-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: REINFORCING (PHILADELPHIA COUNTY): THE FOLLOWING HOLIDAYS SHALL BE OBSERVED AND WHEN WORK IS PERFORMED THEREON IT SHALL BE PAID FOR AT TWICE THE BASE RATE: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. EMPLOYEES SHALL BE OFF CHRISTMAS EVE DAY AND RECEIVE FOUR HOURS PAY. EMPLOYEES WHO HAVE TO WORK ON CHRISTMAS EVE DAY SHALL WORK FOUR HOURS AND BE PAID FOR EIGHT HOURS PAY FOR THE HOLIDAY. ANY TIME WORKED BEYOND FOURS HOURS SHALL BE PAID AT THE DOUBLE TIME RATE PLUS THE FOUR HOURS HOLIDAY PAY. TO RECEIVE HOLIDAY PAY, THE EMPLOYEE MUST WORK THE DAY BEFORE CHRISTMAS EVE AND THE FIRST WORKING DAY AFTER CHRISTMAS DAY | $50.39 | $36.05 | $86.44 |
| IRONWORKER, REINFORCING (BUCKS, CHESTER, DELAWARE AND MONTGOMERY COUNTIES) THE FOLLOWING HOLIDAYS SHALL BE OBSERVED AND WHEN WORK IS PERFORMED THEREON IT SHALL BE PAID FOR AT TWICE THE BASE RATE: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. EMPLOYEES SHALL BE OFF CHRISTMAS EVE DAY AND RECEIVE FOUR HOURS PAY. EMPLOYEES WHO HAVE TO WORK ON CHRISTMAS EVE DAY SHALL WORK FOUR HOURS AND BE PAID FOR EIGHT HOURS PAY FOR THE HOLIDAY. ANY TIME WORKED BEYOND FOURS HOURS SHALL BE PAID AT THE DOUBLE TIME RATE PLUS THE FOUR HOURS HOLIDAY PAY. TO RECEIVE HOLIDAY PAY, THE EMPLOYEE MUST WORK THE DAY BEFORE CHRISTMAS EVE AND THE FIRST WORKING DAY AFTER CHRISTMAS DAY | $47.80 | $36.05 | $83.85 |
IRON0405-003 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, RIGGER AND MACHINERY MOVER: IRONWORKER, RIGGER AND MACHINERY MOVER: (BUCKS, CHESTER, DELAWARE AND MONTGOMERY COUNTIES) THE FOLLOWING HOLIDAYS SHALL BE OBSERVED AND WHEN WORK IS PERFORMED THEREON IT SHALL BE PAID FOR AT TWICE THE BASE RATE: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. EMPLOYEES SHALL BE OFF CHRISTMAS EVE DAY AND RECEIVE FOUR HOURS PAY. EMPLOYEES WHO HAVE TO WORK ON CHRISTMAS EVE DAY SHALL WORK FOUR HOURS AND BE PAID FOR EIGHT HOURS PAY FOR THE HOLIDAY. ANY TIME WORKED BEYOND FOURS HOURS SHALL BE PAID AT THE DOUBLE TIME RATE PLUS THE FOUR HOURS HOLIDAY PAY. TO RECEIVE HOLIDAY PAY, THE EMPLOYEE MUST WORK THE DAY BEFORE CHRISTMAS EVE AND THE FIRST WORKING DAY AFTER CHRISTMAS DAY | $44.77 | $36.05 | $80.82 |
IRON0451-004 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKERS: STRUCTURAL, ORNAMENTAL, AND REINFORCING (CHESTER (REMAINDER OF COUNTY), AND DELAWARE (REMAINDER OF COUNTY) COUNTIES) THE FOLLOWING HOLIDAYS SHALL BE OBSERVED AND WHEN WORK IS PERFORMED THEREON IT SHALL BE PAID FOR AT TWICE THE BASE RATE: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. EMPLOYEES SHALL BE OFF CHRISTMAS EVE DAY AND RECEIVE FOUR HOURS PAY. EMPLOYEES WHO HAVE TO WORK ON CHRISTMAS EVE DAY SHALL WORK FOUR HOURS AND BE PAID FOR EIGHT HOURS PAY FOR THE HOLIDAY. ANY TIME WORKED BEYOND FOURS HOURS SHALL BE PAID AT THE DOUBLE TIME RATE PLUS THE FOUR HOURS HOLIDAY PAY. TO RECEIVE HOLIDAY PAY, THE EMPLOYEE MUST WORK THE DAY BEFORE CHRISTMAS EVE AND THE FIRST WORKING DAY AFTER CHRISTMAS DAY | $41.10 | $35.85 | $76.95 |
LABO0057-001 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER GROUP 9 TRACKMEN; BRACKMEN; GROUTMEN; BOTTOM SHAFT MEN; ALL OTHER LABORERS IN FREE AIR TUNNELS; UNDERPINNING (WHEN AN UNDERPINNING EXCAVATION IS DUG EIGHT FEET OR MORE BELOW THE NATURAL GRADE OR WHERE AN EXCAVATION FOR A PIER HOLE OF FIVE FEET SQUARE OR LESS AND EIGHT FEET OR MORE DEEP IS DUG, THE RATE SHALL APPLY ONLY AFTER A DEPTH OF EIGHT FEET IS REACHED, TO THE MEN WORKING IN THE BOTTOM) | $40.15 | $27.14 | $67.29 |
| LABORER GROUP 8 FORM SETTERS | $40.30 | $27.14 | $67.44 |
| LABORER GROUP 7 MINER BORE DRIVER; BLASTERS; DRILLERS; PNEUMATIC SHIELD OPERATOR | $40.75 | $27.14 | $67.89 |
| LABORER GROUP 6 WELDERS AND BURNERS | $40.70 | $27.14 | $67.84 |
| LABORER GROUP 5 MINERS | $40.65 | $27.14 | $67.79 |
| LABORER GROUP 4 FLAGPERSON | $34.60 | $27.14 | $61.74 |
| LABORER GROUP 3 VIBRATOR LABORER; FINISH SURFACE ASPHALT RACKERS; JACKHAMMER OPERATORS; PAVING BREAKER OPERATOR; PIPELAYER & CAULKER (ALL JOINTS UP TO WITHIN 5 FEET OF THE BUILDING FOUNDATION LINE); CONDUIT & DUCT LAYERS | $40.00 | $27.14 | $67.14 |
| LABORER GROUP 13 WAGON DRILL/HYDRAULIC TRACK DRILL OPERATOR | $40.50 | $27.14 | $67.64 |
| LABORER GROUP 12 TOXIC/HAZARDOUS WASTE HANDLER | $43.90 | $27.14 | $71.04 |
| LABORER GROUP 11 POWDERMAN; MULTIPLE WAGON DRILL OPERATOR | $40.20 | $27.14 | $67.34 |
| LABORER GROUP 10 CIRCULAR CAISSONS (WHERE AN EXCAVATION FOR CIRCULAR CAISSONS ARE DUG EIGHT FEET OR MORE BELOW THE NATURAL GRADE LEVEL ADJACENT TO THE STARTING POINT OF THE CAISSON HOLE, AT GROUND LEVEL, FOR THE MEN WORKING IN THE BOTTOM); WELDERS, BURNERS & AIR TUGGERS | $40.40 | $27.14 | $67.54 |
| LABORER GROUP 1 YARDWORK LABORERS; SCALE MIXERMEN; BURNERMEN, FEEDERS; DUSTMEN | $39.80 | $27.13 | $66.93 |
PAIN0021-003 Effective 02/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTERS: (BRIDGE) | $61.81 | $32.09 | $93.90 |
| PAINTERS: (ALL OTHER WORK) | $50.85 | $32.05 | $82.90 |
PLAS0592-008 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $46.55 | $32.66 | $79.21 |
PLAS0592-012 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLASTERER (PHILADELPHIA COUNTY) | $43.78 | $32.89 | $76.67 |
PLAS0592-013 Effective 05/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLASTERER (BUCKS, CHESTER, DELAWARE AND MONTOGMERY COUNTIES) | $39.32 | $32.44 | $71.76 |
PLUM0420-001 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| STEAMFITTER (BUCKS, CHESTER, DELAWARE, MONTGOMERY AND PHILADELPHIA COUNTIES) | $72.52 | $44.58 | $117.10 |
PLUM0690-008 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER | $70.53 | $38.81 | $109.34 |
TEAM0107-002 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVERS: GROUP 3 EUCLID TYPE, OFF-HIGHWAY EQUIPMENT OR BELLY DUMP TRUCKS AND DOUBLE HITCHED EQUIPMENT, STADDLE (ROSS) CARRIER FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND FIVE PERSONAL HOLIDAYS PROVIDED EMPLOYEE WORKS AT LEAST ONE DAY IN THE THREE WORK DAYS BEFORE AND AT LEAST ONE DAY IN THE THREE WORK DAYS AFTER THE SAID HOLIDAY. EMLOYEE EARNS A PERSONAL HOLIDAY EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE PER CALENDAR YEAR. AFTER 130 WORK DAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE PERSONAL HOLIDAYS. B. PAID VACATION: EMPLOYEE WILL EARN ONE VACATION DAY FOR EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE VACATION DAYS PER CALENDAR YEAR. AFTER 130 WORKDAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE DAYS OF VACATION. EMPLOYEES WITH 5 YEARS OF SENIORITY, EARN AN ADDITIONAL WEEK OF VACATION, ACCRUED IN THE SAME WAY. C. LOW BED TRAILERS SHALL BE PAID $0.50 HIGHER THAN THE HOURLY RATE FOR GROUP 2 | $37.77 | $23.32 | $61.09 |
| TRUCK DRIVERS: GROUP 1 STAKE BODY TRUCK (SINGLE AXLE, DUMPSTER) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND FIVE PERSONAL HOLIDAYS PROVIDED EMPLOYEE WORKS AT LEAST ONE DAY IN THE THREE WORK DAYS BEFORE AND AT LEAST ONE DAY IN THE THREE WORK DAYS AFTER THE SAID HOLIDAY. EMLOYEE EARNS A PERSONAL HOLIDAY EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE PER CALENDAR YEAR. AFTER 130 WORK DAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE PERSONAL HOLIDAYS. B. PAID VACATION: EMPLOYEE WILL EARN ONE VACATION DAY FOR EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE VACATION DAYS PER CALENDAR YEAR. AFTER 130 WORKDAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE DAYS OF VACATION. EMPLOYEES WITH 5 YEARS OF SENIORITY, EARN AN ADDITIONAL WEEK OF VACATION, ACCRUED IN THE SAME WAY. C. LOW BED TRAILERS SHALL BE PAID $0.50 HIGHER THAN THE HOURLY RATE FOR GROUP 2 | $37.42 | $23.32 | $60.74 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 3 | 01/30/2026 |
| 4 | 05/18/2026 |
Counties Covered
This wage determination applies to 5 counties in Pennsylvania.
Get notified when PA20260004 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.