PA20260003
rev 1Building
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Get an email when wage determinations covering Philadelphia County, Pennsylvania are modified.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| ASBESTOS WORKERS/INSULATOR Building ASBE0014-001 (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $60.84 | $48.38 | $109.22 | |
| BOILERMAKER Building BOIL0013-001 | $55.00 | $35.48 | $90.48 | |
| BOILERMAKER Heavy BOIL0013-003 | $55.00 | $35.48 | $90.48 | |
| BRICKLAYER Building BRPA0001-006 | $48.70 | $31.61 | $80.31 | |
| BRICKLAYER Residential BRPA0001-018 | $45.45 | $30.16 | $75.61 | |
| CARPENTER Residential CARP0158-004 (ACOUSTICAL CEILING INSTALLATION AND FORM WORK ONLY) | $55.82 | $30.09 | $85.91 | |
| CARPENTER Residential CARP0158-010 (INCLUDES BATT INSULATION AND DRYWALL HANGING) | $49.52 | $29.54 | $79.06 | |
| CARPENTER (INSTALLER-SIDING (METAL/ALUMINUM/VINYL) Residential CARP0158-006 | $55.82 | $30.09 | $85.91 | |
| CARPENTER FOOTNOTE: A. PAID HOLIDAY: LABOR DAY Heavy CARP0255-006 | $57.36 | $30.09 | $87.45 | |
| CARPENTER/LATHER Building CARP0158-001 | $55.82 | $30.09 | $85.91 | |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0592-011 | $48.70 | $32.26 | $80.96 | |
| CEMENT MASON/CONCRETE FINISHER Heavy PLAS0592-008 | $46.55 | $32.66 | $79.21 | |
| DREDGING: CLASS A1: DECK CAPTAIN; MECHANICAL DREDGE OPERATOR, LEVERMAN, LICENSED TUG OPERATOR OVER 1000 HP. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $48.48 | $15.34 | $63.82 | |
| DREDGING: CLASS A2: CRANE OPERATOR Heavy ENGI0025-001 (360 SWING) INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $43.20 | $14.99 | $58.19 | |
| DREDGING: CLASS B1: DERRICK OPERATOR Heavy ENGI0025-001 (180 SWING), SPIDER/SPILL BARGE OPERATOR, ENGINEER, ELECTRICIAN, CHIEF WELDER, CHIEF MATE, FILL PLACER, OPERATOR II, MAINTENANCE ENGINEER, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $41.93 | $14.90 | $56.83 | |
| DREDGING: CLASS B2: CERTIFIED WELDER. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $39.46 | $14.73 | $54.19 | |
| DREDGING: CLASS C1: MATE, DRAG BARGE OPERATOR, ASSISTANT FILL PLACER, WELDER, STEWARD. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $38.38 | $14.66 | $53.04 | |
| DREDGING: CLASS C2: BOAT OPERATOR. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $37.15 | $14.57 | $51.72 | |
| DREDGING: CLASS D: OILER, DECKHAND, SHOREMAN, RODMAN, SCOWMAN, COOK, MESSMAN, PORTER/JANITOR. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $30.86 | $14.15 | $45.01 | |
| DRYWALL FINISHER/TAPER Building PAIN0021-012 | $42.25 | $32.16 | $74.41 | |
| ELECTRICIAN Building ELEC0098-003 Scope differs by code/WD | $70.97 | $46.13 | $117.10 | |
| ELECTRICIAN Building ELEC0098-014 (SOUND AND COMMUNICATION TECHNICIAN) (INSTALLATION OF VOICE DATA, IT NETWORK, WIFI)) | $63.97 | $30.40 | $94.37 | |
| ELECTRICIAN Heavy ELEC0098-001 (BUCKS COUNTY: STARTING AT THE DELAWARE RIVER AND FOLLOWING THE WEST LIMITS OF THE BOROUGH OF BRISTOL, ALONG THE CONTINUATION OF U.S. HIGHWAY 13 AND UNDER THE PENNSYLVANIA RAILROAD BRIDGE TO ROUTE 09113, NORTH 09113 TO ROUTE 152, NORTH ALONG ROUTE 152 TO THE HUMEVILLE ROAD, EAST ON HUMEVILLE ROAD TO ROUTE 333, NORTH ON ROUTE 344 TO THE JUNCTION OF SPURS 281 AND 252, CONTINUE NORTH ON SPUR 252 TO ROUTE 09028, WEST ON 09028 TO ROUTE 152, NORTH ON 152 TO TR 232, NORTH ON TR 532 | $70.97 | $46.13 | $117.10 | |
| ELECTRICIAN Heavy ELEC0102-003 (BUCKS COUNTY (PLUMSTEAD, BEDMINISTER, TINICUM, NOCKAMIXON, BRIDGETON AND DURHAM TOWNSHIPS IN THEIR ENTIREY, AND THAT PORTION OF HAYCOCK AND SPRINGFIELD TOWNSHIPS EAST OF A LINE FOLLOWING STATE HIGHWAY 412, FROM NORTHAMPTON COUNTY SOUTH TO ROUTE 09071 TO STATE HIGHWAY 212, ALONG HIGHWAY 212 TO ROUTE 09068, AND ALONG 09068 TO STATE HIGHWAY 313. ALSO INCLUDED IS THAT PORTION OF DUBLIN BOROUGH EAST OF STATE HIGHWAY 313) | $65.43 | $42.20 | $107.63 | |
| ELECTRICIAN Heavy ELEC0269-001 (BUCKS COUNTY (AREA EAST OF A LINE STARTING AT THE DELAWARE RIVER AND FOLLOWING THE WEST LIMITS OF THE BOROUGH OF BRISTOL, ALONG THE CONTINUATION OF U.S. HIGHWAY 13 AND UNDER THE PENNSYLVANIA RAILROAD BRIDGE TO ROUTE 09113, NORTH ALONG 09113 TO ROUTE 152, NORTH ALONG ROUTE 152 TO THE HULMEVILLE RD., EAST ON THE HULMEVILLE TO ROUTE 344, NORTH ON ROUTE 344 TO THE JUNCTION OF SPURS 281 AND 252 CONTINUE NORTH ON SPUR 252 AND ROUTE 09028, WEST ON 09028 TO ROUTE 152, NORTH ON 152 TO TR 53 | $63.82 | $41.99 | $105.81 | |
| ELECTRICIAN Heavy ELEC0313-003 (DELAWARE COUNTY :(THAT PORTION SOUTH OF U.S. HIGHWAY NO. 1 AND WEST OF U.S. HIGHWAY NO. 202) CHESTER COUNTY (THAT PORTION SOUTH AND EAST OF U. S. HIGHWAY 1)) | $35.00 | $23.70 | $58.70 | |
| ELECTRICIAN Heavy ELEC0375-001 (BUCKS COUNTY (EAST ROCK HILL, WEST ROCK HILL, MILFORD AND RICHLAND TOWSHIPS IN THEIR ENTIRETY AND THAT PORTION OF HAYCOCK AND SPRINGFIELD TOWNSHIPS WEST OF A LINE FOLLOWING STATE HIGHWAY 212 FROM NORTHAMPTON COUNTY SOUTH TO ROUTE 09071 ALONG 09071 TO STATE HIGHWAY 212, ALONG HIGHWAY 212 TO ROUTE 09068 AND ALONG 09068 TO STATE HIGHWAY 313) MONTGOMERY COUNTY(UPPER HANOVER TWP.IN ITS ENTIRETY)) | $50.00 | $25.93 | $75.93 | |
| ELECTRICIAN Heavy ELEC0380-001 (BUCKS COUNTY (HILLTOWN AND NEW BRITAIN TOWNSHIPS IN THEIR ENTIRETY; THAT PORTION OF TELFORD BOROUGH NORTHEAST OF COUNTY LINE ROAD (MAIN STREET) AND BOUNDED BY WEST ROCK HILL AND HILLTOWN TOWNSHIP THAT PORTION OF DUBLIN BOROUGH WEST OF STATE HIGHWAY 313, AND THAT PORTION OF DOYLESTOWN AND WARRINGTON TOWNSHIPS AND DOYLESTOWN BOROUGH NORTHWEST OF A LINE FOLLOWING U.S. HIGHWAY 611 SOUTH FROM ROUTE 09064 TO THE SPUR OF ROUTE 270, AND PROCEEDING NORTHWEST ALONG THE SPUR TO ROUTE 3 | $58.63 | $46.58 | $105.21 | |
| ELECTRICIAN Heavy ELEC0654-001 (DELAWARE COUNTY (THE PORTION SOUTH OF U.S. HIGHWAY 30 AND NORTH OF THAT PART U.S. HIGHWAY 1 BETWEEN U.S. HIGHWAY 202 AND THE CHESTER COUNTY LINE, AND EAST OF THAT PART OF U.S. HIGHWAY 202 BETWEEN U.S. HIGHWAY 1 AND THE DELAWARE LINE, AND WEST OF A LINE EXTENDING FROM MONTGOMERY COUNTY ALONG STATE ROUTE 320 TO MAPLE, THEN ALONG THE SPRINGFIELD ROAD TO SAXER AVENUE, ALONG SAXER AVENUE TO POWELL ROAD; ALONG POWELL ROAD TO STATE HIGHWAY 420; ALONG 420 AND CONTINUING IN A STRAIGHT LINE | $52.71 | $39.97 | $92.68 | |
| ELECTRICIAN Heavy ELEC0743-001 (CHESTER (COATESVILLE, HONEY BROOK, SOUTH COVENTY, VALLEY, WALLACE, WARWICH, WEST BRANDYWINE, WEST CLAN, AND WEST NANTMEAL TWPS); AND MONTGOMERY (DOUGLAS, POTTSTOWN, UPPER POTTSGROVE, AND WEST POTTSGROVE, TWPS) COUNTIES) | $46.02 | $27.98 | $74.00 | |
| ELECTRICIAN Heavy ELEC0743-007 (CHESTER COUNTY (THE PORTION OF SADSBURY AND WEST SADSBURY TOWNSHIP NORTH OF U.S. HIGHWAY 30)) | $46.02 | $27.98 | $74.00 | |
| ELECTRICIAN Residential ELEC0098-013 | $70.97 | $46.13 | $117.10 | |
| ELECTRICIAN (SOUND AND COMMUNICATION TECHNICIAN) Residential ELEC0098-015 | $62.72 | $34.50 | $97.22 | |
| FLOOR LAYER: CARPET Building CARP0251-001 | $56.51 | $32.39 | $88.90 | |
| GLAZIER Building PAIN0252-006 | $46.09 | $34.83 | $80.92 | |
| IRONWORKER, REINFORCING Heavy IRON0405-001 (BUCKS, CHESTER, DELAWARE AND MONTGOMERY COUNTIES) THE FOLLOWING HOLIDAYS SHALL BE OBSERVED AND WHEN WORK IS PERFORMED THEREON IT SHALL BE PAID FOR AT TWICE THE BASE RATE: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. EMPLOYEES SHALL BE OFF CHRISTMAS EVE DAY AND RECEIVE FOUR HOURS PAY. EMPLOYEES WHO HAVE TO WORK ON CHRISTMAS EVE DAY SHALL WORK FOUR HOURS AND BE PAID FOR EIGHT HOURS PAY FOR THE HOLIDAY. ANY TIME WORKED BEYOND FOURS HOURS SHALL BE PAID AT THE DOUBLE TIME RATE PLUS THE FOUR HOURS HOLIDAY PAY. TO RECEIVE HOLIDAY PAY, THE EMPLOYEE MUST WORK THE DAY BEFORE CHRISTMAS EVE AND THE FIRST WORKING DAY AFTER CHRISTMAS DAY | $47.80 | $36.05 | $83.85 | |
| IRONWORKER, RIGGER AND MACHINERY MOVER: IRONWORKER, RIGGER AND MACHINERY MOVER: Heavy IRON0405-003 (BUCKS, CHESTER, DELAWARE AND MONTGOMERY COUNTIES) THE FOLLOWING HOLIDAYS SHALL BE OBSERVED AND WHEN WORK IS PERFORMED THEREON IT SHALL BE PAID FOR AT TWICE THE BASE RATE: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. EMPLOYEES SHALL BE OFF CHRISTMAS EVE DAY AND RECEIVE FOUR HOURS PAY. EMPLOYEES WHO HAVE TO WORK ON CHRISTMAS EVE DAY SHALL WORK FOUR HOURS AND BE PAID FOR EIGHT HOURS PAY FOR THE HOLIDAY. ANY TIME WORKED BEYOND FOURS HOURS SHALL BE PAID AT THE DOUBLE TIME RATE PLUS THE FOUR HOURS HOLIDAY PAY. TO RECEIVE HOLIDAY PAY, THE EMPLOYEE MUST WORK THE DAY BEFORE CHRISTMAS EVE AND THE FIRST WORKING DAY AFTER CHRISTMAS DAY | $44.77 | $36.05 | $80.82 | |
| IRONWORKER, STRUCTURAL AND ORNAMENTAL Heavy IRON0401-001 (BUCKS (INCLUDES THE TOWNS OF BENSALEM, BREADYSVILLE, BRISTOL CHURCHVILLE, CORNWELLS HEIGHTS, DAVISVILLE, EDDINGTON, FEASTERVILLE, HARTSVILLE, JOHNSVILLE, LINE LEXINGTON, NESHAMINY, SOUTHAMPTON, TRADESVILLE, TREVOSE, UNIONVILLE, WARMINSTER, AND WARRINGTON): DELAWARE (NORTH OF A LINE RUNNING ALONG STATE RT 352 TO RIGHT ON STATE RT 291 TO STATE LINE); CHESTER (INCLUDES THE TOWNS OF ALDHAM, ANSELMA, BACTON, BERWYN, CEDAR HOLLOW, CHARLESTOWN, CHESTER SPRINGS, C | $56.50 | $45.30 | $101.80 | |
| IRONWORKER: REINFORCING Heavy IRON0405-001 (PHILADELPHIA COUNTY): THE FOLLOWING HOLIDAYS SHALL BE OBSERVED AND WHEN WORK IS PERFORMED THEREON IT SHALL BE PAID FOR AT TWICE THE BASE RATE: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. EMPLOYEES SHALL BE OFF CHRISTMAS EVE DAY AND RECEIVE FOUR HOURS PAY. EMPLOYEES WHO HAVE TO WORK ON CHRISTMAS EVE DAY SHALL WORK FOUR HOURS AND BE PAID FOR EIGHT HOURS PAY FOR THE HOLIDAY. ANY TIME WORKED BEYOND FOURS HOURS SHALL BE PAID AT THE DOUBLE TIME RATE PLUS THE FOUR HOURS HOLIDAY PAY. TO RECEIVE HOLIDAY PAY, THE EMPLOYEE MUST WORK THE DAY BEFORE CHRISTMAS EVE AND THE FIRST WORKING DAY AFTER CHRISTMAS DAY | $50.39 | $36.05 | $86.44 | |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL Building IRON0401-002 | $56.50 | $45.30 | $101.80 | |
| IRONWORKERS: STRUCTURAL, ORNAMENTAL, AND REINFORCING Heavy IRON0451-004 (CHESTER (REMAINDER OF COUNTY), AND DELAWARE (REMAINDER OF COUNTY) COUNTIES) THE FOLLOWING HOLIDAYS SHALL BE OBSERVED AND WHEN WORK IS PERFORMED THEREON IT SHALL BE PAID FOR AT TWICE THE BASE RATE: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. EMPLOYEES SHALL BE OFF CHRISTMAS EVE DAY AND RECEIVE FOUR HOURS PAY. EMPLOYEES WHO HAVE TO WORK ON CHRISTMAS EVE DAY SHALL WORK FOUR HOURS AND BE PAID FOR EIGHT HOURS PAY FOR THE HOLIDAY. ANY TIME WORKED BEYOND FOURS HOURS SHALL BE PAID AT THE DOUBLE TIME RATE PLUS THE FOUR HOURS HOLIDAY PAY. TO RECEIVE HOLIDAY PAY, THE EMPLOYEE MUST WORK THE DAY BEFORE CHRISTMAS EVE AND THE FIRST WORKING DAY AFTER CHRISTMAS DAY | $41.10 | $35.85 | $76.95 | |
| LABORER Building LABO0332-002 (ASBESTOS ABATEMENT, TOXIC AND HAZARDOUS WASTE REMOVAL, LEAD BASED PAINT REMOVAL) | $41.00 | $27.04 | $68.04 | |
| LABORER GROUP 1 YARDWORK LABORERS; SCALE MIXERMEN; BURNERMEN, FEEDERS; DUSTMEN Heavy LABO0057-001 | $39.80 | $27.13 | $66.93 | |
| LABORER GROUP 10 CIRCULAR CAISSONS Heavy LABO0057-001 (WHERE AN EXCAVATION FOR CIRCULAR CAISSONS ARE DUG EIGHT FEET OR MORE BELOW THE NATURAL GRADE LEVEL ADJACENT TO THE STARTING POINT OF THE CAISSON HOLE, AT GROUND LEVEL, FOR THE MEN WORKING IN THE BOTTOM); WELDERS, BURNERS & AIR TUGGERS | $40.40 | $27.14 | $67.54 | |
| LABORER GROUP 10 WELDERS AND BURNERS Building LABO0332-001 | $40.93 | $26.69 | $67.62 | |
| LABORER GROUP 11 MASON TENDER Building LABO0332-001 | $39.50 | $26.69 | $66.19 | |
| LABORER GROUP 11 POWDERMAN; MULTIPLE WAGON DRILL OPERATOR Heavy LABO0057-001 | $40.20 | $27.14 | $67.34 | |
| LABORER GROUP 12 TOXIC/HAZARDOUS WASTE HANDLER Heavy LABO0057-001 | $43.90 | $27.14 | $71.04 | |
| LABORER GROUP 13 WAGON DRILL/HYDRAULIC TRACK DRILL OPERATOR Heavy LABO0057-001 | $40.50 | $27.14 | $67.64 | |
| LABORER GROUP 2 POWER BUGGIES; BURNERS ON DEMOLITION Building LABO0332-001 | $39.20 | $26.69 | $65.89 | |
| LABORER GROUP 3 VIBRATOR LABORER; FINISH SURFACE ASPHALT RACKERS; JACKHAMMER OPERATORS; PAVING BREAKER OPERATOR; PIPELAYER & CAULKER Heavy LABO0057-001 (ALL JOINTS UP TO WITHIN 5 FEET OF THE BUILDING FOUNDATION LINE); CONDUIT & DUCT LAYERS | $40.00 | $27.14 | $67.14 | |
| LABORER GROUP 3 WAGON DRILL OPERATOR (SINGLE) Building LABO0332-001 | $39.25 | $26.69 | $65.94 | |
| LABORER GROUP 4 FLAGPERSON Heavy LABO0057-001 | $34.60 | $27.14 | $61.74 | |
| LABORER GROUP 4 POWDERMEN; WAGON DRILL OPERATOR Building LABO0332-001 (MULTIPLE); CIRCULAR CAISSON EXCAVATION; UNDERPINNING EXCAVATION | $39.40 | $26.69 | $66.09 | |
| LABORER GROUP 5 CAISSON BOTTOM MAN Building LABO0332-001 | $39.45 | $26.69 | $66.14 | |
| LABORER GROUP 5 MINERS Heavy LABO0057-001 | $40.65 | $27.14 | $67.79 | |
| LABORER GROUP 6 WELDERS AND BURNERS Heavy LABO0057-001 | $40.70 | $27.14 | $67.84 | |
| LABORER GROUP 6 YARD WORKERS Building LABO0332-001 | $39.24 | $26.69 | $65.93 | |
| LABORER GROUP 7 MINER BORE DRIVER; BLASTERS; DRILLERS; PNEUMATIC SHIELD OPERATOR Heavy LABO0057-001 | $40.75 | $27.14 | $67.89 | |
| LABORER GROUP 7 TRACKMEN; BRAKEMEN; GROUTMEN; BOTTOM SHAFT MEN; ALL OTHER MEN IN FREE AIR TUNNELS Building LABO0332-001 | $40.38 | $26.69 | $67.07 | |
| LABORER GROUP 8 FORM SETTERS Building LABO0332-001 | $40.53 | $26.69 | $67.22 | |
| LABORER GROUP 8 FORM SETTERS Heavy LABO0057-001 | $40.30 | $27.14 | $67.44 | |
| LABORER GROUP 9 MINERS BORE DRIVER; BLASTERS; DRILLERS; PNEUMATIC SHIELD OPERATORS Building LABO0332-001 | $40.68 | $26.69 | $67.37 | |
| LABORER GROUP 9 TRACKMEN; BRACKMEN; GROUTMEN; BOTTOM SHAFT MEN; ALL OTHER LABORERS IN FREE AIR TUNNELS; UNDERPINNING Heavy LABO0057-001 (WHEN AN UNDERPINNING EXCAVATION IS DUG EIGHT FEET OR MORE BELOW THE NATURAL GRADE OR WHERE AN EXCAVATION FOR A PIER HOLE OF FIVE FEET SQUARE OR LESS AND EIGHT FEET OR MORE DEEP IS DUG, THE RATE SHALL APPLY ONLY AFTER A DEPTH OF EIGHT FEET IS REACHED, TO THE MEN WORKING IN THE BOTTOM) | $40.15 | $27.14 | $67.29 | |
| LABORER: COMMON OR GENERAL Residential LABO0413-011 | $39.10 | $26.69 | $65.79 | |
| LINE CONSTRUCTION: CABLE SPLICER Heavy ELEC0126-002 (CHESTER, DELAWARE, MONTGOMERY, PHILADELPHIA, AND REMAINDER OF BUCKS COUNTY) | $62.54 | $32.92 | $95.46 | |
| LINE CONSTRUCTION: GROUNDMAN Heavy ELEC0126-002 (CHESTER, DELAWARE, MONTGOMERY, PHILADELPHIA, AND REMAINDER OF BUCKS COUNTY) | $37.52 | $24.35 | $61.87 | |
| LINE CONSTRUCTION: LINEMAN Heavy ELEC0126-002 (CHESTER, DELAWARE, MONTGOMERY, PHILADELPHIA, AND REMAINDER OF BUCKS COUNTY) | $62.54 | $32.92 | $95.46 | |
| LINE CONSTRUCTION: TRUCK DRIVER Heavy ELEC0126-002 (CHESTER, DELAWARE, MONTGOMERY, PHILADELPHIA, AND REMAINDER OF BUCKS COUNTY) | $40.65 | $25.42 | $66.07 | |
| LINE CONSTRUCTION: WINCH TRUCK OPERATOR Heavy ELEC0126-002 (CHESTER, DELAWARE, MONTGOMERY, PHILADELPHIA, AND REMAINDER OF BUCKS COUNTY) | $43.78 | $26.49 | $70.27 | |
| LINE CONSTRUCTION:: CABLE SPLICER Heavy ELEC0269-002 (BUCKS COUNTY - THAT PORTION EAST OF A LINE STARTING AT THE DELAWARE RIVER AND FOLLOWING THE WEST LIMITS OF THE BOROUGH OF BRISTOL, ALONG THE CONTINUATION OF U.S. HIGHWAY 13 AND UNDER THE PENNSYLVANIA RAILROAD BRIDGE TO ROUTE 09113, NORTH ALONG 09113 TO ROUTE 152, NORTH ALONG ROUTE 152 TO THE HULMEVILLE RD., EAST ON THE HULMEVILLE TO ROUTE 344, NORTH ON ROUTE 344 TO THE JUNCTION OF SPURS 281 AND 252 CONTINUE NORTH ON SPUR 252 AND ROUTE 09028, WEST ON 09028 TO R | $68.02 | $44.04 | $112.06 | |
| LINE CONSTRUCTION:: GROUNDMAN, TRUCK DRIVER Heavy ELEC0269-002 (BUCKS COUNTY - THAT PORTION EAST OF A LINE STARTING AT THE DELAWARE RIVER AND FOLLOWING THE WEST LIMITS OF THE BOROUGH OF BRISTOL, ALONG THE CONTINUATION OF U.S. HIGHWAY 13 AND UNDER THE PENNSYLVANIA RAILROAD BRIDGE TO ROUTE 09113, NORTH ALONG 09113 TO ROUTE 152, NORTH ALONG ROUTE 152 TO THE HULMEVILLE RD., EAST ON THE HULMEVILLE TO ROUTE 344, NORTH ON ROUTE 344 TO THE JUNCTION OF SPURS 281 AND 252 CONTINUE NORTH ON SPUR 252 AND ROUTE 09028, WEST ON | $49.47 | $32.03 | $81.50 | |
| LINE CONSTRUCTION:: LINEMEN AND HEAVY EQUIPMENT OPERATOR Heavy ELEC0269-002 (BUCKS COUNTY - THAT PORTION EAST OF A LINE STARTING AT THE DELAWARE RIVER AND FOLLOWING THE WEST LIMITS OF THE BOROUGH OF BRISTOL, ALONG THE CONTINUATION OF U.S. HIGHWAY 13 AND UNDER THE PENNSYLVANIA RAILROAD BRIDGE TO ROUTE 09113, NORTH ALONG 09113 TO ROUTE 152, NORTH ALONG ROUTE 152 TO THE HULMEVILLE RD., EAST ON THE HULMEVILLE TO ROUTE 344, NORTH ON ROUTE 344 TO THE JUNCTION OF SPURS 281 AND 252 CONTINUE NORTH ON SPUR 252 AND ROUTE 09 | $61.84 | $40.04 | $101.88 | |
| MARBLE FINISHER Building MARB0001-003 | $25.10 | $20.75 | $45.85 | |
| MARBLE SETTER Building MARB0003-002 | $44.90 | $30.75 | $75.65 | |
| MASON - STONE Building BRPA0001-011 | $48.40 | $31.95 | $80.35 | |
| MILLWRIGHT Building CARP0219-005 | $54.54 | $38.78 | $93.32 | |
| MILLWRIGHT Heavy CARP0219-005 | $54.54 | $38.78 | $93.32 | |
| MILLWRIGHT Residential CARP0219-010 | $54.54 | $38.78 | $93.32 | |
| PAINTER: BRUSH AND ROLLER ONLY Residential PAIN0021-004 | $42.97 | $31.19 | $74.16 | |
| PAINTERS: (ALL OTHER WORK) Heavy PAIN0021-003 | $50.85 | $32.05 | $82.90 | |
| PAINTERS: (BRIDGE) Heavy PAIN0021-003 | $61.81 | $32.09 | $93.90 | |
| PAINTERS: (BRUSH, ROLLER) Building PAIN0021-001 | $41.24 | $28.10 | $69.34 | |
| PAINTERS: (SPRAY, STEEL AND SWING) Building PAIN0021-001 | $42.49 | $28.10 | $70.59 | |
| PILEDRIVERMAN Building CARP0474-004 | $48.25 | $44.92 | $93.17 | |
| PILEDRIVERMAN Heavy CARP0474-004 | $48.25 | $44.92 | $93.17 | |
| PLASTERER Building PLAS0592-014 | $45.08 | $33.59 | $78.67 | |
| PLASTERER Heavy PLAS0592-013 (BUCKS, CHESTER, DELAWARE AND MONTOGMERY COUNTIES) | $39.32 | $32.44 | $71.76 | |
| PLASTERER (PHILADELPHIA COUNTY) Heavy PLAS0592-012 | $43.78 | $32.89 | $76.67 | |
| PLUMBER Building PLUM0690-002 | $70.53 | $38.81 | $109.34 | |
| PLUMBER Heavy PLUM0690-008 | $70.53 | $38.81 | $109.34 | |
| PLUMBER Residential PLUM0690-001 | $70.53 | $38.81 | $109.34 | |
| POINTER, CAULKER AND CLEANER Building BRPA0001-015 | $50.00 | $30.70 | $80.70 | |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT PLANT ENGINEERS, WELL DRILLERS, DITCH WITCH Building ENGI0542-002 (SMALL TRENCHER), MOTOR PATROLS, FINE GRADE MACHINES, TEN-TON ROLLER (GRADE FILL STONE BASE), CONCRETE BREAKING MACHINES, GUILLOLINE ONLY, STUMP GRINDER, CONVEYORS (EXCEPT BUILDING CONVEYORS), FORK LIFT TRUCKS OF ALL TYPES, HIGH PRESSURE BOLIERS ELEVATOR OPERATOR (NEW CONSTRUCTION) MACHINE SIMILAR TO THE ABOVE,INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY | $50.18 | $33.22 | $83.40 | |
| POWER EQUIPMENT OPERATORS: GROUP 4 SEAMAN, PULVERZER FORM LINE GRADER, FARM TRACTORS, ROAD FINISHING, CONCRETE SPREADER, POWER BROOM Building ENGI0542-002 (SELF-CONTAINED), SEED SPREADER, GREASE TRUCK, TOXIC/HAZARDOUS WATE REMOVAL RATE 20 PER CENT ADDED TO ALL CLASSIFICATIONS AND MACHIINES SIMILAR TO THE ABOVE INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT. ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY | $49.88 | $33.13 | $83.01 | |
| POWER EQUIPMENT OPERATORS: GROUP 5 COMPRESSORS PUMPS, WELL POINT PUMPS, WELDING MACHINES TIREMAN, POWER EQUIPMENT, MAINTENANCE ENGINEER Building ENGI0542-002 (POWER BOATS),ELEVATOR OPERATORS (RENOVATIONS) AND MACHINE SIMILAR TO THE ABOVE INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT. ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY | $48.16 | $32.62 | $80.78 | |
| POWER EQUIPMENT OPERATORS: GROUP 6 FIREMAN, OILERS AND DECK HANDS Building ENGI0542-002 (PERSONNEL BOATS), GREASE TRUCK. MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMENT. ***TOXIC/HARARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS, INCLUDING TOWER CRANES, 100 FT. FROM GROUND UP, FIFTY CENTS ($.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS) 200 FT. AND OVER, TWO (2) OPERATORS WILL BE REQUIRED. WHEN TWO (2) OPERATORS ARE EMPLOYED, NO OILER WILL BE REQUIRED. BOOMS TO BE MEASURED FROM THE GROUND UP. TOWER CRANES CALCULATED FROM GROUND UP AND OUT FOR PURPOSE OF BOOM PAY | $47.17 | $32.33 | $79.50 | |
| POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION Heavy ENGI0542-005 (OFF PLANT SITE): GROUP 6 FIREMAN, OILERS AND DECK HANDS (PERSONNEL BOATS), GREASE TRUCK. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY AND CHRISTMAS DAY **TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $46.02 | $31.48 | $77.50 | |
| POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION Heavy ENGI0542-005 (OFF PLANT SITE): GROUP 5 COMPRESSORS PUMPS, WELL POINT PUMPS, WELDING MACHINES TIREMAN, POWER EQUIPMENT, MAINTENANCE ENGINEER (POWER BOATS), AND MACNINES SIMILAR TO THE ABOVE. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY AND CHRISTMAS DAY **TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $47.00 | $31.78 | $78.78 | |
| POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION Heavy ENGI0542-005 (OFF PLANT SITE): GROUP 4 SEAMAN, PULVERZER FORM LINE GRADER, FARM TRACTORS, ROAD FINISHING, CONCRETE SPREADER, POWER BROOM (SELF-CONTAINED), SEED SPREADER, GREASE TRUCK. MEMORIAL DAY;INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY AND CHRISTMAS DAY **TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $48.73 | $32.28 | $81.01 | |
| POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION Heavy ENGI0542-005 (OFF PLANT SITE): GROUP 3 ASPHALT PLANT ENGINEERS, WELL DRILLERS, DITCH WITCH (SMALL TRENCHER), MOTOR PATROLS, FINE GRADE MACHINES, TEN-TON ROLLER (GRADE FILL STONE BASE), CONCRETE BREAKING MACHINES, GUILLOLINE ONLY, STUMP GRINDER, CONVEYORS (EXCEPT BUILDING CONVEYORS), FORK LIFT TRUCKS OF ALL TYPES, HIGH PRESSURE BOLIERS, MACHINE SIMILAR TO THE ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY AND CHRISTMAS DAY **TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $49.03 | $32.37 | $81.40 | |
| POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION Heavy ENGI0542-005 (OFF PLANT SITE): GROUP 2A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBLIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE CUBIC YARD FACTORY RATING; ALL TYPES OF CRANES 15 TON AND OVER FACTORY RATING; SINGLE PERSON OPERATION TRUCK CRANES 15 TON AND OVER FACTORY RATING; CHERRY PICKER TYPE MACHINERY AND EQUIPMENT 15 TON AND OVER FACTORY RATING; CONCRETE PUMPS (HEAVY/HIGHWAY); MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. MEMORIAL DAY;INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY AND CHRISTMAS DAY **TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $56.13 | $34.45 | $90.58 | |
| POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION Heavy ENGI0542-005 (OFF PLANT SITE): GROUP 2 ALL TYPES OF CRANES, ALL TYPES OF BACKHOES, CABLEWAYS, DRAGLINES, KEYSTONES, ALL TYPES OF SHOVELS, DERRICKS, PAVERS 21E AND OVER, TRENCHING MACHINES, TRENCH SHOVEL, GRADDALLS, FRONT-END LOADERS, BOAT CAPTAIN, PIPPIN TYPE BACKHOES, TANDEMS SCRAPERS, TOWERS TYPE CRANE OPERATION ERECTING, DISMANTLING, JUMPING OR JACKING, DRILLS (SELF-CONTAINES), (DRILLMASTER TYPE) FORKLIFT (20 FT. AND OVER), MOTER PATROLS (FINE GRADE), BATCH PLANT WITH MIXER, CARRYALLS, SCRAPER, TROUNAPULLS, ROLLER (HITH GRADE FINISHING), SPREADERS (ASPHALT), BULLDOZERS AND TRACTORS, MECHANIC WELDER, CONVEYOR LOADERS (EUCLID-TYPE WHEEL), CONCRETE PUMP, MILLING MACHINES, HOIST WITH TWO TOWERS, BUILDING HOIST DOUBLE DRUM (UNLESS USED AS A SINGLE DRUM), MUCKING MACHINES IN TUNNEL, ALL AUTO GRADE AND CONCRETE FINISHING MACHINES, BUNDLE PULLERS/EXTRACTORS (TUBLAR), TOXIC/HAZARDOUS WASTE REMOVAL RATE 20 PER CENT ADDED TO ALL CLASSIFICIATION, BOBCAT, SIDE BROOM, DIRECTIONAL BORING MACHINES, VERMEET SAW TYPE MACHINES ( OTHER THAN HAND HELD) TRACTOR MOUNTED HYDRO AXE, CHIPPER WITH BOOM, ALL MACHINE SIMILAR TO THE ABOVE INCLUDIDNG REMOTE CONTROL EQUIPMENT. 3: ASPHALT PLANT ENGINEERS, WELL DRILLERS, DITCH WITCH (SMALL TRENCHER), MOTOR PATROLS, FINE GRADE MACHINES, TEN-TON ROLLER (GRADE FILL STONE BASE), CONCRETE BREAKING MACHINES, GUILLOLINE ONLY, STUMP GRINDER, CONVEYORS (EXCEPT BUILDING CONVEYORS), FORK LIFT TRUCKS OF ALL TYPES, HIGH PRESSURE BOLIERS, MACHINE SIMILAR TO THE ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT. MEMORIAL DAY;INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY AND CHRISTMAS DAY **TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $53.11 | $33.58 | $86.69 | |
| POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION Heavy ENGI0542-005 (OFF PLANT SITE): GROUP 1A MACHINES HANDLING STEEL, OR THE FUNCTIONAL EQUIVALENT, AND STONE IN CONNECTION WITH ERECTION 15 TON AND OVER FACTORY RATING; CRANES DOING HOOK WORK 15 TON AND OVER FACTORY RATING; ANY MACHINES HANDLING MACHINERY; HIGH RAIL/BURRO CRANE 15 TON AND OVER FACTORY RATING; RAIL LOADER (WINCH BOOM TYPE) 15 TON AND OVER FACTORY RATING; CONCRETE PUMPS (BUILDING) 120 FEET OF BOOM LENGTH OR LESS (200 YARD POUR OR LESS); MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. MEMORIAL DAY;INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY AND CHRISTMAS DAY **TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $56.37 | $34.53 | $90.90 | |
| POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION Heavy ENGI0542-005 (OFF PLANT SITE): GROUP 1 HANDLING STEEL AND STONE IN CONNECTION WITH ERECTION, CRANES DOING HOOK WORK, ANY MACHINE HANDLING MACHINERY, HELICOPTERS, CONCRETE PUMPS BUILDING MACHINES SIMILAR TO THE ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY AND CHRISTMAS DAY **TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20 PER CENT TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $53.36 | $33.65 | $87.01 | |
| ROOFER Residential ROOF0030-015 | $31.25 | $21.75 | $53.00 | |
| ROOFERS: COMPOSITION FOOTNOTE Building ROOF0030-001 (COMPOSITION ROOFER ONLY): A. PAID HOLIDAY: ELECTION DAY | $41.48 | $33.37 | $74.85 | |
| ROOFERS: SHINGLES FOOTNOTE Building ROOF0030-001 (COMPOSITION ROOFER ONLY): A. PAID HOLIDAY: ELECTION DAY | $31.25 | $21.75 | $53.00 | |
| ROOFERS: SLATE AND TILE Building ROOF0030-001 | $34.25 | $21.75 | $56.00 | |
| SHEET METAL WORKER Building SHEE0019-008 | $62.62 | $50.66 | $113.28 | |
| SHEET METAL WORKER (SIGN MAKERS & HANGERS) Building SHEE0019-023 | $33.89 | $24.25 | $58.14 | |
| SHEET METAL WORKER FOOTNOTE: PAID HOLIDAY: ELECTION DAY Residential SHEE0019-022 | $62.62 | $50.66 | $113.28 | |
| SOFT FLOOR LAYER Residential CARP0251-015 | $40.39 | $29.09 | $69.48 | |
| SPRINKLER FITTER Building SFPA0692-001 | $66.22 | $34.25 | $100.47 | |
| STEAMFITTER Building PLUM0420-008 | $72.52 | $44.58 | $117.10 | |
| STEAMFITTER Heavy PLUM0420-001 (BUCKS, CHESTER, DELAWARE, MONTGOMERY AND PHILADELPHIA COUNTIES) | $72.52 | $44.58 | $117.10 | |
| TERRAZZO FINISHER Building MARB0001-003 | $27.03 | $20.58 | $47.61 | |
| TERRAZZO WORKER/SETTER Building MARB0003-002 | $48.01 | $28.67 | $76.68 | |
| TILE FINISHER Building MARB0001-003 | $25.10 | $20.75 | $45.85 | |
| TILE SETTER Building BRPA0001-008 | $51.36 | $30.02 | $81.38 | |
| TRUCK DRIVER, BUILDING CONSTRUCTION: GROUP 1 STAKE BODY TRUCK Building TEAM0107-001 (SINGLE AXLE), 11/2 TON AND UNDER VEHICLES FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND FIVE PERSONAL HOLIDAYS PROVIDED EMPLOYEE WORKS AT LEAST ONE DAY IN THE THREE WORK DAYS BEFORE AND AT LEAST ONE DAY IN THE THREE WORK DAYS AFTER THE SAID HOLIDAY. EMLOYEE EARNS A PERSONAL HOLIDAY EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE PER CALENDAR YEAR. AFTER 130 WORK DAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE PERSONAL HOLIDAYS. B. PAID VACATION: EMPLOYEE WILL EARN ONE VACATION DAY FOR EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE VACATION DAYS PER CALENDAR YEAR. AFTER 130 WORKDAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE DAYS OF VACATION. EMPLOYEES WITH 5 YEARS OF SENIORITY, EARN AN ADDITIONAL WEEK OF VACATION, ACCRUED IN THE SAME WAY | $37.57 | $23.32 | $60.89 | |
| TRUCK DRIVER, BUILDING CONSTRUCTION: GROUP 3 EUCLID TYPE, OFF-HIGHWAY EQUIPMENT - BACK OR BELLY DUMP TRUCKS AND DOUBLE-HITCHED EQUIPMENT, STRADDLE Building TEAM0107-001 (ROSS) CARRIER, LOWBED TRAILERS FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND FIVE PERSONAL HOLIDAYS PROVIDED EMPLOYEE WORKS AT LEAST ONE DAY IN THE THREE WORK DAYS BEFORE AND AT LEAST ONE DAY IN THE THREE WORK DAYS AFTER THE SAID HOLIDAY. EMLOYEE EARNS A PERSONAL HOLIDAY EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE PER CALENDAR YEAR. AFTER 130 WORK DAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE PERSONAL HOLIDAYS. B. PAID VACATION: EMPLOYEE WILL EARN ONE VACATION DAY FOR EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE VACATION DAYS PER CALENDAR YEAR. AFTER 130 WORKDAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE DAYS OF VACATION. EMPLOYEES WITH 5 YEARS OF SENIORITY, EARN AN ADDITIONAL WEEK OF VACATION, ACCRUED IN THE SAME WAY | $37.92 | $23.32 | $61.24 | |
| TRUCK DRIVER, SITE PREPARATION, PAVING AND UTILITIES ON BUILDING CONSTRUCTION: GROUP 1 - STAKE BODY TRUCK Building TEAM0107-001 (SINGLE AXLE), DUMPSTER FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND FIVE PERSONAL HOLIDAYS PROVIDED EMPLOYEE WORKS AT LEAST ONE DAY IN THE THREE WORK DAYS BEFORE AND AT LEAST ONE DAY IN THE THREE WORK DAYS AFTER THE SAID HOLIDAY. EMLOYEE EARNS A PERSONAL HOLIDAY EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE PER CALENDAR YEAR. AFTER 130 WORK DAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE PERSONAL HOLIDAYS. B. PAID VACATION: EMPLOYEE WILL EARN ONE VACATION DAY FOR EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE VACATION DAYS PER CALENDAR YEAR. AFTER 130 WORKDAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE DAYS OF VACATION. EMPLOYEES WITH 5 YEARS OF SENIORITY, EARN AN ADDITIONAL WEEK OF VACATION, ACCRUED IN THE SAME WAY | $37.57 | $23.32 | $60.89 | |
| TRUCK DRIVERS: GROUP 1 STAKE BODY TRUCK Heavy TEAM0107-002 (SINGLE AXLE, DUMPSTER) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND FIVE PERSONAL HOLIDAYS PROVIDED EMPLOYEE WORKS AT LEAST ONE DAY IN THE THREE WORK DAYS BEFORE AND AT LEAST ONE DAY IN THE THREE WORK DAYS AFTER THE SAID HOLIDAY. EMLOYEE EARNS A PERSONAL HOLIDAY EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE PER CALENDAR YEAR. AFTER 130 WORK DAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE PERSONAL HOLIDAYS. B. PAID VACATION: EMPLOYEE WILL EARN ONE VACATION DAY FOR EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE VACATION DAYS PER CALENDAR YEAR. AFTER 130 WORKDAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE DAYS OF VACATION. EMPLOYEES WITH 5 YEARS OF SENIORITY, EARN AN ADDITIONAL WEEK OF VACATION, ACCRUED IN THE SAME WAY. C. LOW BED TRAILERS SHALL BE PAID $0.50 HIGHER THAN THE HOURLY RATE FOR GROUP 2 | $37.42 | $23.32 | $60.74 | |
| TRUCK DRIVERS: GROUP 3 EUCLID TYPE, OFF-HIGHWAY EQUIPMENT OR BELLY DUMP TRUCKS AND DOUBLE HITCHED EQUIPMENT, STADDLE Heavy TEAM0107-002 (ROSS) CARRIER FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND FIVE PERSONAL HOLIDAYS PROVIDED EMPLOYEE WORKS AT LEAST ONE DAY IN THE THREE WORK DAYS BEFORE AND AT LEAST ONE DAY IN THE THREE WORK DAYS AFTER THE SAID HOLIDAY. EMLOYEE EARNS A PERSONAL HOLIDAY EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE PER CALENDAR YEAR. AFTER 130 WORK DAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE PERSONAL HOLIDAYS. B. PAID VACATION: EMPLOYEE WILL EARN ONE VACATION DAY FOR EVERY TWO MONTHS, PROVIDED EMPLOYEE HAS WORKED TWENTY-SIX DAY IN EACH CONSECUTIVE TWO MONTH PERIOD, UP TO A MAXIMUM OF FIVE VACATION DAYS PER CALENDAR YEAR. AFTER 130 WORKDAYS THE EMPLOYEE IS ENTITLED TO ALL FIVE DAYS OF VACATION. EMPLOYEES WITH 5 YEARS OF SENIORITY, EARN AN ADDITIONAL WEEK OF VACATION, ACCRUED IN THE SAME WAY. C. LOW BED TRAILERS SHALL BE PAID $0.50 HIGHER THAN THE HOURLY RATE FOR GROUP 2 | $37.77 | $23.32 | $61.09 | |
| TV INSPECTION AND GROUTING Heavy SUPA1990-003 (TV/CHEMICAL GROUT SEALING TECHNICIAN) | $11.58 | $1.26 | $12.84 | |
| TV INSPECTION AND GROUTING Heavy SUPA1990-003 (TV/CHEMICAL GROUT SEALING TECHNICIAN ASSISTAN) | $8.69 | $1.36 | $10.05 | |
| TV INSPECTION AND GROUTING Heavy SUPA1990-003 (HYDRAULIC SEWER CLEANING TRUCK TECHNICIAN) | $11.45 | $0.17 | $11.62 | |
| TV INSPECTION AND GROUTING Heavy SUPA1990-003 (HYDRAULIC SEWER CLEANING TRUCK TECHNICIAN ASSISTANT) | $9.54 | $0.17 | $9.71 | |
| WINDOW TINTER Building PAIN0252-001 | $25.02 | $13.06 | $38.08 |
No trade rates match your search and filter selection.
Building
Heavy, Highway
Applies to
Bucks, Chester, Delaware, Montgomery, Philadelphia
Heavy
Applies to
Adams, Allegheny, Armstrong, Beaver, Bedford, Berks, Blair, Bradford, Bucks, Butler +57 more
Heavy
Applies to
Adams, Allegheny, Armstrong, Beaver, Bedford, Berks, Blair, Bradford, Bucks, Butler +57 more
Residential