WV20260016
BuildingDavis-Bacon Act general wage determination for building construction in West Virginia.
Track WV20260016
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0080-002 Effective 02/24/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.05 | $30.87 | $68.92 |
BOIL0667-005 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $47.13 | $28.93 | $76.06 |
BRWV0005-002 Effective 06/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $31.16 | $27.26 | $58.42 |
| BRICK POINTER/CAULKER/CLEANER | $31.16 | $27.26 | $58.42 |
BRWV0015-010 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MASON - STONE | $33.00 | $26.18 | $59.18 |
CARP0439-003 Effective 12/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INCLUDING DRYWALL HANGING, FORM WORK, SCAFFOLD BUILDER AND FLOOR LAYING - CARPET, HARDWOOD, RESILIENT AND VINYL) | $33.84 | $25.51 | $59.35 |
CARP0443-009 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MILLWRIGHT | $37.40 | $26.06 | $63.46 |
ELEC0317-003 Effective 09/02/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $32.75 | $15.00 | $47.75 |
ENGI0132-007 Effective 12/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, ROLLER, OILER | $34.71 | $22.05 | $56.76 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE, ALL OTHER CRANES | $45.21 | $22.05 | $67.26 |
| POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER | $46.21 | $22.05 | $68.26 |
IRON0549-006 Effective 12/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: ORNAMENTAL | $35.19 | $25.66 | $60.85 |
IRON0787-006 Effective 12/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: REINFORCING | $36.10 | $24.65 | $60.75 |
LABO0379-019 Effective 12/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER (WACKER ROLLER OPERATOR) | $28.02 | $16.80 | $44.82 |
LABO0453-004 Effective 12/01/2017 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: GROUTING | $22.76 | $16.75 | $39.51 |
LABO0543-005 Effective 06/01/2020 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: ASPHALT RAKER, COMMON OR GENERAL, CONCRETE SAW (HAND HELD/WALK BEHIND), GRADE CHECKER, JACK HAMMER, MOTORIZED BUGGY OPERATOR, WATER BOY | $25.41 | $16.75 | $42.16 |
LABO0984-005 Effective 12/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLASTERER | $24.13 | $16.05 | $40.18 |
PAIN0970-007 Effective 12/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: DRYWALL FINISHING/TAPING | $30.57 | $20.06 | $50.63 |
PAIN1195-002 Effective 12/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| GLAZIER | $32.89 | $13.38 | $46.27 |
PLAS0926-008 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER GROUP 2 (Concrete Saw (Hand Held/Walk Behind), Grouting) | $31.97 | $25.36 | $57.33 |
| LABORER GROUP 2 (Airtool Operator, Asbestos Abatement (Removal from Floors, Walls, and Ceiling), Bobcat Operator (Clean up/Demolition), Dewatering, Rodman, Skytrak Forklift Operator) | $34.77 | $26.66 | $61.43 |
| CEMENT MASON/CONCRETE FINISHER | $34.77 | $26.66 | $61.43 |
| LABORER GROUP 2 (Concrete Saw (Hand Held/Walk Behind), Grouting) | $31.97 | $25.36 | $57.33 |
| LABORER GROUP 2 (Airtool Operator, Asbestos Abatement (Removal from Floors, Walls, and Ceiling), Bobcat Operator (Clean up/Demolition), Dewatering, Rodman, Skytrak Forklift Operator) | $34.77 | $26.66 | $61.43 |
| CEMENT MASON/CONCRETE FINISHER | $34.77 | $26.66 | $61.43 |
PLAS0926-008 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER GROUP 2 (Concrete Saw (Hand Held/Walk Behind), Grouting) | $31.97 | $25.36 | $57.33 |
| LABORER GROUP 2 (Airtool Operator, Asbestos Abatement (Removal from Floors, Walls, and Ceiling), Bobcat Operator (Clean up/Demolition), Dewatering, Rodman, Skytrak Forklift Operator) | $34.77 | $26.66 | $61.43 |
| CEMENT MASON/CONCRETE FINISHER | $34.77 | $26.66 | $61.43 |
| LABORER GROUP 2 (Concrete Saw (Hand Held/Walk Behind), Grouting) | $31.97 | $25.36 | $57.33 |
| LABORER GROUP 2 (Airtool Operator, Asbestos Abatement (Removal from Floors, Walls, and Ceiling), Bobcat Operator (Clean up/Demolition), Dewatering, Rodman, Skytrak Forklift Operator) | $34.77 | $26.66 | $61.43 |
| CEMENT MASON/CONCRETE FINISHER | $34.77 | $26.66 | $61.43 |
SUWV2012-014 Effective 08/13/2012 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: SINGLE AND DOUBLE AXLE DUMP TRUCKS | $28.52 | $3.00 | $31.52 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $25.61 | $15.68 | $41.29 |
| ROOFER | $24.28 | $9.32 | $33.60 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $27.64 | $18.09 | $45.73 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $22.03 | $9.95 | $31.98 |
| OPERATOR: FORKLIFT | $33.09 | $3.00 | $36.09 |
| OPERATOR: EXCAVATOR | $30.31 | $10.81 | $41.12 |
| OPERATOR: BULLDOZER | $30.24 | $10.26 | $40.50 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $22.05 | $8.54 | $30.59 |
| LABORER: MASON TENDER - BRICK | $21.47 | $8.29 | $29.76 |
| LABORER: DEMOLITION | $20.58 | $9.47 | $30.05 |
| IRONWORKER, STRUCTURAL | $26.01 | $12.18 | $38.19 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in West Virginia.
Get notified when WV20260016 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.