Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
BOIL0667-005 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $47.13 | $28.93 | $76.06 |
BRWV0009-007 Effective 12/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $31.65 | $25.56 | $57.21 |
BRWV0015-007 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $31.53 | $25.47 | $57.00 |
BRWV0015-011 Effective 06/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MASON - STONE | $28.90 | $23.91 | $52.81 |
BRWV0015-014 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE FINISHER | $27.00 | $22.57 | $49.57 |
CARP0423-004 Effective 12/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INCLUDING DRYWALL FINISHING/TAPING, DRYWALL HANGING AND FORM WORK) | $29.40 | $20.25 | $49.65 |
CARP0443-009 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MILLWRIGHT | $37.40 | $26.06 | $63.46 |
ELEC0307-012 Effective 12/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING) | $42.20 | $20.39 | $62.59 |
ENGI0132-009 Effective 12/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, FARM TYPE TRACTOR, LOADER | $34.71 | $22.05 | $56.76 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER, FORKLIFT, NON-FARM TYPE TRACTOR, ALL OTHER CRANES, ALL OTHER MECHANICS | $45.21 | $22.05 | $67.26 |
| POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER | $46.21 | $22.05 | $68.26 |
IRON0549-007 Effective 12/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: ORNAMENTAL AND REINFORCING | $35.19 | $25.66 | $60.85 |
IRON0568-011 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER (SHEETING AND STRUCTURAL) | $31.65 | $24.50 | $56.15 |
LABO0379-010 Effective 12/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: GROUP 3 PIPELAYER | $24.94 | $16.20 | $41.14 |
| LABORER: GROUP 2 CONCRETE SAW (HAND HELD/WALK BEHIND), MASON TENDER-BRICK, MASON TENDER-CEMENT/CONCRETE, MORTAR MIXER, SCAFFOLD BUILDER (BRICK AND MASONRY), SKYTRAK FORKLIFT OPERATOR | $24.94 | $16.20 | $41.14 |
| LABORER: GROUP 1 CARPENTER TENDER, DEMOLITION | $24.94 | $16.20 | $41.14 |
ROOF0034-003 Effective 05/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $29.75 | $16.71 | $46.46 |
SHEE0100-006 Effective 11/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION (66+ MILES FROM CITY HALL, CUMBERLAND, MARYLAND) | $30.73 | $24.03 | $54.76 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION (41-65 MILES FROM CITY HALL, CUMBERLAND, MARYLAND) | $30.23 | $24.03 | $54.26 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION (0-40 MILES FROM CITY HALL, CUMBERLAND, MARYLAND) | $27.73 | $24.03 | $51.76 |
SUWV2012-034 Effective 08/13/2012 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER (FIRE SPRINKLERS) | $30.96 | $15.81 | $46.77 |
| PLUMBER | $32.07 | $15.30 | $47.37 |
| PIPEFITTER | $25.76 | $19.46 | $45.22 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $22.33 | $9.95 | $32.28 |
| OPERATOR: EXCAVATOR | $23.27 | $11.95 | $35.22 |
| OPERATOR: BACKHOE | $21.51 | $7.36 | $28.87 |
| LABORER: COMMON OR GENERAL | $18.67 | $8.84 | $27.51 |
| GLAZIER | $23.20 | $4.02 | $27.22 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.18 | $15.83 | $46.01 |
TEAM0175-005 Effective 10/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: GROUP 3 DUMP TRUCK (5 CU. YDS. & OVER), TRACTOR HAUL TRUCK, WATER TANK TRUCK (SEMI) | $29.96 | $22.50 | $52.46 |
| TRUCK DRIVER: GROUP 2 DUMP TRUCK (UP TO 5 CU. YDS.), WATER TANK TRUCK (STRAIGHT) | $29.81 | $22.50 | $52.31 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in West Virginia.
Get notified when WV20260036 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.