WV20260042

Building

Davis-Bacon Act general wage determination for building construction in West Virginia.

Modification 1, revised 05/18/2026 34 trade rates 1 county View on SAM.gov

Track WV20260042

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ASBE0002-002 Effective 08/01/2024
Trade Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR $46.50 $29.43 $75.93
BOIL0667-005 Effective 01/01/2025
Trade Rate Fringe Total
BOILERMAKER $47.13 $28.93 $76.06
BRWV0009-007 Effective 12/01/2022
Trade Rate Fringe Total
TILE SETTER $31.65 $25.56 $57.21
BRWV0015-004 Effective 06/01/2024
Trade Rate Fringe Total
BRICKLAYER (BRICKLAYER & BRICK POINTER/CAULKER/CLEANER) $31.65 $25.82 $57.47
BRWV0015-009 Effective 06/01/2021
Trade Rate Fringe Total
BRICKLAYER (BRICK REFRACTORY/BRICK PLACEMENT WORKER) $32.64 $23.95 $56.59
BRWV0015-010 Effective 06/01/2024
Trade Rate Fringe Total
MASON - STONE $33.00 $26.18 $59.18
BRWV0015-014 Effective 06/01/2024
Trade Rate Fringe Total
TILE FINISHER $27.00 $22.57 $49.57
CARP0436-008 Effective 12/01/2024
Trade Rate Fringe Total
CARPENTER (INCLUDING BATT INSULATION, DRYWALL HANGING, FORM WORK AND SCAFFOLD BUILDER) $30.51 $26.05 $56.56
CARP0443-009 Effective 06/01/2023
Trade Rate Fringe Total
MILLWRIGHT $37.40 $26.06 $63.46
ELEC0596-006 Effective 06/01/2025
Trade Rate Fringe Total
ELECTRICIAN $43.77 $27.72 $71.49
ENGI0132-012 Effective 12/01/2024
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, FARM TYPE TRACTOR, LOADER $34.71 $22.05 $56.76
POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER, EXCAVATOR, FORKLIFT, NON-FARM TYPE TRACTOR, ALL OTHER CRANES, ALL OTHER MECHANICS $45.21 $22.05 $67.26
POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER $46.21 $22.05 $68.26
IRON0549-009 Effective 12/01/2022
Trade Rate Fringe Total
IRONWORKER: ORNAMENTAL, REINFORCING, SHEETING AND STRUCTURAL $35.19 $25.66 $60.85
LABO0379-012 Effective 12/01/2024
Trade Rate Fringe Total
LABORER: GROUP 4 FLAGGER $24.94 $16.20 $41.14
LABORER: GROUP 3 PIPELAYER $24.94 $16.20 $41.14
LABORER: GROUP 2 ASPHALT RAKER, BOBCAT OPERATOR (CLEAN UP/DEMOLITION), CHAIN SAW, CONCRETE SAW (HAND HELD/WALK BEHIND), CONCRETE WORKER, DEWATERING, FENCE ERECTION, GRADE CHECKER, GROUTING, JACK HAMMER, MASON TENDER-BRICK, MASON TENDER-CEMENT CONCRETE, MORTAR MIXER, MOTORIZED BUGGY OPERATOR, RODMAN, SCAFFOLD BUILDER (BRICK AND MASONRY), SKYTRAK FORKLIFT OPERATOR, TAMPER (HAND HELD) $24.94 $16.20 $41.14
LABORER: GROUP 1 CARPENTER TENDER, COMMON OR GENERAL, DEMOLITION, LANDSCAPE $24.94 $16.20 $41.14
LABO1149-007 Effective 12/01/2024
Trade Rate Fringe Total
LABORER: WATER BOY $25.92 $16.88 $42.80
LABORER (PLASTER TENDER) $25.92 $16.88 $42.80
PAIN0804-006 Effective 12/01/2024
Trade Rate Fringe Total
PAINTER (BRUSH, ROLLER AND SPRAY) $30.49 $19.16 $49.65
PAIN0970-007 Effective 12/01/2024
Trade Rate Fringe Total
PAINTER: DRYWALL FINISHING/TAPING $30.57 $20.06 $50.63
PAIN1195-002 Effective 12/01/2024
Trade Rate Fringe Total
GLAZIER $32.89 $13.38 $46.27
PLAS0926-005 Effective 07/01/2025
Trade Rate Fringe Total
PLASTERER (EIFS AND FIREPROOFING) $30.50 $22.22 $52.72
CEMENT MASON/CONCRETE FINISHER $30.38 $22.87 $53.25
PLUM0152-009 Effective 11/01/2024
Trade Rate Fringe Total
PLUMBER $34.05 $41.05 $75.10
PLUM0152-010 Effective 11/01/2024
Trade Rate Fringe Total
PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) $34.05 $41.05 $75.10
ROOF0188-003 Effective 07/01/2025
Trade Rate Fringe Total
ROOFER $34.00 $19.11 $53.11
SHEE0033-003 Effective 06/01/2024
Trade Rate Fringe Total
SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) $34.92 $29.70 $64.62
SUWV2012-040 Effective 08/13/2012
Trade Rate Fringe Total
OPERATOR: ROLLER $25.24 $16.15 $41.39
OPERATOR: BACKHOE $21.51 $7.36 $28.87
LABORER: WACKER ROLLER OPERATOR $23.07 $11.07 $34.14
TEAM0175-005 Effective 10/01/2024
Trade Rate Fringe Total
TRUCK DRIVER: GROUP 3 DUMP TRUCK (5 CU. YDS. & OVER), TRACTOR HAUL TRUCK, WATER TANK TRUCK (SEMI) $29.96 $22.50 $52.46
TRUCK DRIVER: GROUP 2 DUMP TRUCK (UP TO 5 CU. YDS.), WATER TANK TRUCK (STRAIGHT) $29.81 $22.50 $52.31

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in West Virginia.

Get notified when WV20260042 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.