Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0002-002 Effective 08/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $46.50 | $29.43 | $75.93 |
BOIL0667-005 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $47.13 | $28.93 | $76.06 |
BRWV0006-002 Effective 06/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $30.50 | $22.17 | $52.67 |
BRWV0009-007 Effective 12/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $31.65 | $25.56 | $57.21 |
BRWV0009-008 Effective 12/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MASON - STONE | $31.65 | $25.56 | $57.21 |
BRWV0015-014 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE FINISHER | $27.00 | $22.57 | $49.57 |
CARP0436-006 Effective 12/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INCLUDING DRYWALL HANGING, FORM WORK AND FLOOR LAYING-HARDWOOD AND VINYL) | $33.05 | $26.50 | $59.55 |
CARP0443-009 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MILLWRIGHT | $37.40 | $26.06 | $63.46 |
ELEC0968-008 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $39.01 | $30.75 | $69.76 |
ENGI0132-011 Effective 12/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, FARM TYPE TRACTOR, LOADER | $34.71 | $22.05 | $56.76 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE, BULLDOZER, EXCAVATOR, FORKLIFT, NON-FARM TYPE TRACTOR, ALL OTHER CRANES, ALL OTHER MECHANICS | $45.21 | $22.05 | $67.26 |
| POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER | $46.21 | $22.05 | $68.26 |
IRON0549-006 Effective 12/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: ORNAMENTAL | $35.19 | $25.66 | $60.85 |
IRON0787-006 Effective 12/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: REINFORCING | $36.10 | $24.65 | $60.75 |
LABO0379-019 Effective 12/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER (WACKER ROLLER OPERATOR) | $28.02 | $16.80 | $44.82 |
LABO1085-005 Effective 12/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: AIRTOOL OPERATOR, BOBCAT OPERATOR (CLEAN UP/DEMOLITION), CARPENTER TENDER, CHIPPING GUNS, COMMON OR GENERAL, CONCRETE SAW (HAND HELD/WALK BEHIND), CONCRETE WORKER, DEMOLITION, FENCE ERECTION, FLAGGER, GRADE CHECKER, JACK HAMMER, LANDSCAPE, MASON TENDER-BRICK, MASON TENDER-CEMENT/CONCRETE, MORTAR MIXER, POWER TOOL OPERATOR, SCAFFOLD BUILDER (BRICK AND MASONRY), SIGNAL MAN, SKYTRAK FORKLIFT OPERATOR, TAMPER (HAND HELD), WATER BOY | $23.76 | $16.95 | $40.71 |
PAIN0970-009 Effective 12/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER (BRUSH, ROLLER AND SPRAY) | $30.57 | $20.06 | $50.63 |
PAIN1144-005 Effective 12/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: DRYWALL FINISHING/TAPING | $31.48 | $17.73 | $49.21 |
PAIN1195-002 Effective 12/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| GLAZIER | $32.89 | $13.38 | $46.27 |
PLUM0565-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $41.00 | $37.63 | $78.63 |
PLUM0565-004 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER | $41.00 | $37.63 | $78.63 |
ROOF0034-003 Effective 05/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $29.75 | $16.71 | $46.46 |
SHEE0024-022 Effective 06/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $33.53 | $26.71 | $60.24 |
SUWV2012-049 Effective 08/13/2012 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, STRUCTURAL | $25.72 | $16.50 | $42.22 |
TEAM0175-005 Effective 10/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: GROUP 3 DUMP TRUCK (5 CU. YDS. & OVER), TRACTOR HAUL TRUCK, WATER TANK TRUCK (SEMI) | $29.96 | $22.50 | $52.46 |
| TRUCK DRIVER: GROUP 2 DUMP TRUCK (UP TO 5 CU. YDS.), WATER TANK TRUCK (STRAIGHT) | $29.81 | $22.50 | $52.31 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 2 counties in West Virginia.
Get notified when WV20260051 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.