WV20260079
HeavyDavis-Bacon Act general wage determination for heavy construction in West Virginia.
Track WV20260079
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ENGI0132-026 Effective 12/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 2 LOADERS UP TO SIX (6) CUBIC YARD CAPACITY, BACKHOE, BULLDOZERS, COMPACTOR, FORKLIFT, GRADER/BLADE, MECHANIC, EXCAVATORS AND SHOVELS WITH AN OPERATING WEIGHT OF UP TO ONE HUNDRED TEN THOUSAND (110,000) POUNDS, TRACTOR, TRENCHER | $39.19 | $20.45 | $59.64 |
| POWER EQUIPMENT OPERATOR: GROUP 1 CRANE (TOWER), LOADERS OF SIX (6) CUBIC YARD CAPACITY AND OVER, EXCAVATORS AND SHOVELS WITH AN OPERATING WEIGHT OF ONE HUNDRED TEN THOUSAND (110,000) POUNDS AND OVER | $41.95 | $20.45 | $62.40 |
IRON0549-011 Effective 12/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: ORNAMENTAL | $35.50 | $29.11 | $64.61 |
IRON0787-007 Effective 12/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, REINFORCING | $36.10 | $24.65 | $60.75 |
LABO0379-038 Effective 12/01/2020 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: GROUP 2 CARPENTER TENDER, COMMON OR GENERAL, FLAGGER, LANDSCAPE, WATER BOY | $25.26 | $16.50 | $41.76 |
| LABORER: GROUP 1 AIR TOOL OPERATOR, ASPHALT RAKER, BOBCAT OPERATOR (CLEAN UP/DEMOLITION), BUSHHAMMER, CHAIN SAW, CONCRETE SAW (HAND HELD/WALK BEHIND), CONCRETE WORKER, HAND HELD DRILL, GRADE CHECKER, GUARDRAIL INSTALLATION, MASON TENDER-CEMENT/CONCRETE, PIPELAYER, SKYTRAK FORKLIFT OPERATOR | $26.32 | $16.50 | $42.82 |
PAIN1144-006 Effective 12/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: SPRAY | $34.49 | $17.53 | $52.02 |
PLAS0926-001 Effective 12/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $35.77 | $27.54 | $63.31 |
SUWV2012-077 Effective 08/13/2012 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER, DUMP (EXCLUDING OFF THE ROAD TRUCKS) | $22.34 | $13.31 | $35.65 |
| OPERATOR: ROLLER | $23.49 | $14.88 | $38.37 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.39 | $15.50 | $39.89 |
| OPERATOR: OILER | $21.44 | $14.42 | $35.86 |
| OPERATOR: CRANE | $26.85 | $13.52 | $40.37 |
| OPERATOR: CONCRETE PUMP | $26.79 | $9.35 | $36.14 |
| OPERATOR: BOOM | $28.91 | $10.49 | $39.40 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.49 | $13.15 | $34.64 |
| IRONWORKER, STRUCTURAL | $37.02 | $3.00 | $40.02 |
| ELECTRICIAN | $28.70 | $17.12 | $45.82 |
| CARPENTER, INCLUDES FORM WORK | $31.13 | $3.00 | $34.13 |
TEAM0175-006 Effective 12/07/2015 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $31.77 | $15.98 | $47.75 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | $31.77 | $15.98 | $47.75 |
| TRUCK DRIVER: FLATBED TRUCK | $30.98 | $15.98 | $46.96 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 3 counties in West Virginia.
Get notified when WV20260079 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.