Washington

4 wage determinations 84 trade rates

Popular Trades In Washington

Track Washington County updates

Get an email when wage determinations covering Washington County, Idaho are modified.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Trade Rates

Click a row to save its rate for later, then export your selections from the Saved panel.

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Save Trade & Classification Rate Fringe Total
BRICKLAYER Building
BRID0003-002
$30.00 $17.78 $47.78
CARPENTER Residential
SUID1983-001
$9.07 0.00 $9.07
CARPENTER Building
SUID2010-013
$23.68 $7.53 $31.21
CARPENTER (FORM WORK ONLY) Highway
SUID2013-014
$26.57 $8.10 $34.67
CARPENTER, INCLUDES FORM WORK Heavy
SUID2010-057
$25.41 $9.98 $35.39
CEMENT MASON/CONCRETE FINISHER Residential
SUID1983-001
$7.81 0.00 $7.81
CEMENT MASON/CONCRETE FINISHER Building
SUID2010-013
$19.43 $5.88 $25.31
CEMENT MASON/CONCRETE FINISHER Heavy
SUID2010-057
$23.25 $12.31 $35.56
CEMENT MASON/CONCRETE FINISHER Highway
PLAS0072-001 (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE
$40.89 $18.64 $59.53
ELECTRICIAN Residential
SUID1983-001
$8.72 0.00 $8.72
ELECTRICIAN Building
ELEC0291-001
$42.25 $18.84 $61.09
ELECTRICIAN Heavy
ELEC0291-011
$42.25 $18.84 $61.09
ELECTRICIAN Highway
SUID2013-014
$26.83 $11.94 $38.77
HIGHWAY/PARKING LOT STRIPING: PAINTER Highway
SUID2013-014
$23.80 $6.67 $30.47
INSULATION INSTALLER Residential
SUID1983-001
$7.25 0.00 $7.25
INSULATOR - MECHANICAL Building
SUID2010-013 (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)
$20.13 $1.80 $21.93
IRONWORKER Residential
SUID1983-001
$8.25 $0.75 $9.00
IRONWORKER, REINFORCING Heavy
SUID2010-057
$27.22 $16.70 $43.92
IRONWORKER, STRUCTURAL Heavy
IRON0014-002
$43.40 $30.27 $73.67
IRONWORKER: STRUCTURAL Building
IRON0014-018 (ADAMS AND WASHINGTON COUNTIES)
$43.40 $30.27 $73.67
IRONWORKER: STRUCTURAL Building
IRON0732-001 (ELMORE, PAYETTE, AND VALLEY COUNTIES)
$30.62 $21.48 $52.10
LABORER Residential
SUID1983-001
$7.25 0.00 $7.25
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR Highway
SUID2013-014
$23.09 $10.44 $33.53
LABORER: COMMON OR GENERAL Building
SUID2010-013
$15.44 0.00 $15.44
LABORER: COMMON OR GENERAL Heavy
SUID2010-057
$22.46 $10.00 $32.46
LABORER: COMMON OR GENERAL Highway
SUID2013-014
$23.88 $11.05 $34.93
LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) Highway
SUID2013-014
$23.98 $11.05 $35.03
LABORER: GRADE CHECKER Highway
SUID2013-014
$23.41 $10.78 $34.19
LABORER: GROUP 1 FLAGGER Heavy
LABO0155-008
$33.63 $16.50 $50.13
LABORER: GROUP 3 ASPHALT INCLUDING RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR Heavy
LABO0155-008
$33.83 $16.50 $50.33
LABORER: MASON TENDER - CEMENT/CONCRETE Highway
SUID2013-014
$23.88 $11.05 $34.93
LABORER: PIPELAYER Heavy
SUID2010-057
$17.67 $7.26 $24.93
LABORER:MASON TENDER-CEMENT/CONCRETE Building
LABO0155-004
$33.93 $16.50 $50.43
OPERATOR: BACKHOE/EXCAVATOR Building
SUID2010-013
$20.75 $4.42 $25.17
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Heavy
SUID2010-057
$22.15 $10.03 $32.18
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Highway
SUID2013-014
$26.20 $9.97 $36.17
OPERATOR: BOBCAT/SKID STEER/SKID LOADER Heavy
SUID2010-057
$20.97 0.00 $20.97
OPERATOR: BOBCAT/SKID STEER/SKID LOADER Highway
SUID2013-014
$25.35 $11.55 $36.90
OPERATOR: BROOM/SWEEPER Highway
SUID2013-014
$23.93 $9.09 $33.02
OPERATOR: BULLDOZER Highway
SUID2013-014
$25.94 $10.36 $36.30
OPERATOR: CONCRETE BATCH PLANT Heavy
SUID2010-057
$24.94 $11.96 $36.90
OPERATOR: CRANE Building
SUID2010-013
$27.29 $10.53 $37.82
OPERATOR: CRANE Highway
SUID2013-014
$26.04 $10.28 $36.32
OPERATOR: CRUSHER Highway
SUID2013-014
$25.06 $9.23 $34.29
OPERATOR: FORKLIFT Heavy
SUID2010-057
$21.20 0.00 $21.20
OPERATOR: GRADER/BLADE Highway
SUID2013-014
$26.00 $10.30 $36.30
OPERATOR: HYDROSEEDER Highway
SUID2013-014
$24.76 $11.51 $36.27
OPERATOR: LOADER Highway
SUID2013-014
$25.15 $9.83 $34.98
OPERATOR: MECHANIC Highway
SUID2013-014
$25.40 $8.63 $34.03
OPERATOR: OILER Highway
SUID2013-014
$25.66 $9.23 $34.89
OPERATOR: PAVER Highway
SUID2013-014 (ASPHALT, AGGREGATE, AND CONCRETE)
$25.63 $10.33 $35.96
OPERATOR: ROLLER Highway
SUID2013-014
$25.24 $10.42 $35.66
OPERATOR: ROLLER (SUBGRADE) Highway
SUID2013-014
$22.24 $8.57 $30.81
OPERATOR: ROTOMILL Highway
SUID2013-014
$27.06 $12.65 $39.71
OPERATOR: SCREED Highway
SUID2013-014
$24.07 $9.63 $33.70
PAINTER Residential
SUID1983-001
$8.03 0.00 $8.03
PAINTER: BRUSH, ROLLER AND SPRAY Building
SUID2010-013
$16.12 0.00 $16.12
PLASTERER Residential
SUID1983-001
$9.00 0.00 $9.00
PLUMBER Residential
SUID1983-001
$10.82 0.00 $10.82
PLUMBER Building
PLUM0296-003
$39.90 $18.67 $58.57
POWER EQUIPMENT OPERATOR: GROUP 10 SCRAPER Heavy
ENGI0302-040 (OVER 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE
$38.06 $16.10 $54.16
POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER Heavy
ENGI0302-040 (UP TO 4YD) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE
$36.64 $16.10 $52.74
POWER EQUIPMENT OPERATOR: GROUP 6: BLADE OPERATOR, CRANES Heavy
ENGI0302-040 (UP TO AND INCLUDING 50 TONS), DRILLING (BIT UNDER 8IN), FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS), OILER, SCRAPER (UP TO AND INCLUDING 40 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT OVER SCALE
$36.98 $16.10 $53.08
POWER EQUIPMENT OPERATOR: GROUP 70 CRANES Heavy
ENGI0302-040 (OVER 50 TONS), DRILL (BIT 8 IN AND OVER), GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC, SCRAPERS (OVER 40 YDS TO 60 YDS), TOWER CRANE ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE
$37.35 $16.10 $53.45
POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER, SCRAPER Heavy
ENGI0302-040 (OVER 80 YDS TO 100 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE
$37.58 $16.10 $53.68
ROOFER Residential
SUID1983-001
$8.00 0.00 $8.00
ROOFER Building
ROOF0189-002
$35.75 $15.21 $50.96
SHEET METAL WORKER Residential
SUID1983-001
$8.00 $0.34 $8.34
SHEET METAL WORKER Building
SHEE0055-004 (INCLUDES HVAC DUCT INSTALLATION)
$39.20 $23.59 $62.79
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER Highway
SUID2013-014
$22.66 $10.90 $33.56
TRUCK DRIVER Residential
SUID1983-001
$7.25 0.00 $7.25
TRUCK DRIVER, GROUP 5A DUMP (0-16 YDS) Heavy
TEAM0983-002
$35.60 $17.00 $52.60
TRUCK DRIVER, GROUP 5B DUMP (16-30 YDS) Heavy
TEAM0983-002
$35.78 $17.00 $52.78
TRUCK DRIVER, GROUP 5C DUMP (30-50 YDS) Heavy
TEAM0983-002
$36.01 $17.00 $53.01
TRUCK DRIVER, GROUP 5D DUMP (50-75 YDS) Heavy
TEAM0983-002
$36.12 $17.00 $53.12
TRUCK DRIVER, GROUP 5E DUMP (75-100 YDS) Heavy
TEAM0983-002
$36.75 $17.00 $53.75
TRUCK DRIVER, GROUP 5F DUMP (OVER 100 YDS) Heavy
TEAM0983-002
$37.19 $17.00 $54.19
TRUCK DRIVER: DUMP TRUCK Building
SUID2010-013
$17.82 $2.18 $20.00
TRUCK DRIVER: DUMP TRUCK Highway
SUID2013-014
$21.80 $13.95 $35.75
TRUCK DRIVER: LOWBOY TRUCK Heavy
SUID2010-057
$21.00 $12.10 $33.10
TRUCK DRIVER: LOWBOY TRUCK Highway
SUID2013-014
$22.12 $13.20 $35.32
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK Highway
SUID2013-014
$22.54 $12.35 $34.89
TRUCK DRIVER: WATER TRUCK Heavy
SUID2010-057
$24.70 $12.10 $36.80
TRUCK DRIVER: WATER TRUCK Highway
SUID2013-014
$23.99 $11.12 $35.11

Wage Determinations

Residential

12 trades

Applies to

Ada, Boise, Canyon, Elmore, Gem, Owyhee, Payette, Washington

Building

16 trades

Applies to

Adams, Elmore, Payette, Valley, Washington

Highway

30 trades

Applies to

Adams, Payette, Valley, Washington