Yancey

5 wage determinations 114 trade rates

Popular Trades In Yancey

Track Yancey County updates

Get an email when wage determinations covering Yancey County, North Carolina are modified.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Trade Rates

Click a row to save its rate for later, then export your selections from the Saved panel.

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Save Trade & Classification Rate Fringe Total
BLASTER Highway
SUNC2014-001
$21.83 0.00 $21.83
BRICKLAYER Building
SUNC2011-042
$18.45 $4.18 $22.63
CARPENTER Highway
SUNC2014-001
$12.54 0.00 $12.54
CARPENTER Residential
SUNC2016-003
$14.66 0.00 $14.66
CARPENTER (DRYWALL HANGING ONLY) Building
SUNC2011-042
$17.59 $2.31 $19.90
CARPENTER (FORM WORK ONLY) Building
SUNC2011-042
$14.28 $1.13 $15.41
CARPENTER (FORM WORK ONLY) Heavy
SUNC2011-049
$14.85 $1.38 $16.23
CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK Building
SUNC2011-042
$15.60 $2.25 $17.85
CEMENT MASON/CONCRETE FINISHER Building
SUNC2011-042
$14.02 0.00 $14.02
CEMENT MASON/CONCRETE FINISHER Heavy
SUNC2011-049
$13.10 $1.32 $14.42
CEMENT MASON/CONCRETE FINISHER Highway
SUNC2014-001
$14.10 0.00 $14.10
CEMENT MASON/CONCRETE FINISHER Residential
SUNC2016-003
$15.25 0.00 $15.25
ELECTRICIAN Building
SUNC2011-042
$15.37 $0.40 $15.77
ELECTRICIAN Residential
SUNC2016-003
$14.61 0.00 $14.61
ELECTRICIAN (ELECTRICIAN) Highway
SUNC2014-001
$19.19 $2.39 $21.58
ELECTRICIAN (TELECOMMUNICATIONS TECHNICAN) Highway
SUNC2014-001
$15.13 0.00 $15.13
HVAC MECHANIC Building
SUNC2011-042 (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT)
$16.94 $3.04 $19.98
HVAC MECHANIC (HVAC DUCT INSTALLATION ONLY) Residential
SUNC2016-003
$14.11 0.00 $14.11
IRONWORKER Highway
SUNC2014-001
$14.53 0.00 $14.53
IRONWORKER, STRUCTURAL Building
SUNC2011-042
$18.75 $5.62 $24.37
LABORER (ASPHALT RAKER AND SPREADER) Highway
SUNC2014-001
$12.23 0.00 $12.23
LABORER (ASPHALT SCREED/JACKMAN) Highway
SUNC2014-001
$15.22 0.00 $15.22
LABORER (CARPENTER TENDER) Highway
SUNC2014-001
$10.00 0.00 $10.00
LABORER (CEMENT MASON/CONCRETE FINISHER TENDER) Highway
SUNC2014-001
$12.26 0.00 $12.26
LABORER (COMMON OR GENERAL) Highway
SUNC2014-001
$10.68 0.00 $10.68
LABORER (GUARDRAIL/FENCE INSTALLER) Highway
SUNC2014-001
$13.43 0.00 $13.43
LABORER (PIPELAYER) Highway
SUNC2014-001
$12.22 0.00 $12.22
LABORER (TRAFFIC SIGNAL/LIGHTING INSTALLER) Highway
SUNC2014-001
$15.85 0.00 $15.85
LABORER: COMMON OR GENERAL Building
SUNC2011-042
$11.07 $1.10 $12.17
LABORER: COMMON OR GENERAL Heavy
SUNC2011-049
$10.60 $0.49 $11.09
LABORER: COMMON OR GENERAL Residential
SUNC2016-003
$11.78 0.00 $11.78
LABORER: LANDSCAPE & IRRIGATION Building
SUNC2011-042
$10.29 $1.82 $12.11
LABORER: MASON TENDER-BRICK/CEMENT/CONCRETE Building
SUNC2011-042
$10.00 0.00 $10.00
LABORER: PIPELAYER Heavy
SUNC2011-049
$12.54 $1.56 $14.10
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: COOK Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.11 $1.73 $9.84
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: COOK Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.11 $1.73 $9.84
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DECKHAND Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$7.77 $1.73 $9.50
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DECKHAND Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$7.77 $1.73 $9.50
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DREDGING :, HYDRAULIC DREDGES OVER 20"": CLASS A2: CRANE OPERATOR Heavy
ENGI0025-002 (360 SWING) . PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$43.20 $14.99 $58.19
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DREDGING :, HYDRAULIC DREDGES OVER 20"": CLASS A2: CRANE OPERATOR Heavy
ENGI0025-002 (360 SWING) . PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$43.20 $14.99 $58.19
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DREDGING :, HYDRAULIC DREDGES OVER 20"": CLASS B1: DERRICK OPERATOR Heavy
ENGI0025-002 (180 SWING), SPIDER/SPILL BARGE OPERATOR, TIMBER FORK OPERATOR, DOZER OPERATOR, ENGINEER, BLASTER/DRILLER, FILL PLACER, ELECTRICIAN, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR LICENSED ENGINEER (USCG) $1.80; OILER QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS TANKERMAN ENDORSEMENT ONLY (USCG) (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$41.93 $14.90 $56.83
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DREDGING :, HYDRAULIC DREDGES OVER 20"": CLASS B1: DERRICK OPERATOR Heavy
ENGI0025-002 (180 SWING), SPIDER/SPILL BARGE OPERATOR, TIMBER FORK OPERATOR, DOZER OPERATOR, ENGINEER, BLASTER/DRILLER, FILL PLACER, ELECTRICIAN, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR LICENSED ENGINEER (USCG) $1.80; OILER QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS TANKERMAN ENDORSEMENT ONLY (USCG) (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$41.93 $14.90 $56.83
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DREDGING :, HYDRAULIC DREDGES OVER 20"": CLASS C1: MATE, DRAG BARGE OPERATOR, WELDER, ASSISTANT FILL PLACER, STEWARD Heavy
ENGI0025-002 Scope differs by code/WD
$38.38 $14.66 $53.04
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DREDGING :, HYDRAULIC DREDGES OVER 20"": CLASS C1: MATE, DRAG BARGE OPERATOR, WELDER, ASSISTANT FILL PLACER, STEWARD Heavy
ENGI0025-002 Scope differs by code/WD
$38.38 $14.66 $53.04
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: ENGINEER Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$9.59 $1.73 $11.32
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: ENGINEER Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$9.59 $1.73 $11.32
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: LAUNCHMAN Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.19 $1.73 $9.92
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: LAUNCHMAN Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.19 $1.73 $9.92
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: LEVERMAN Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$10.03 $1.73 $11.76
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: LEVERMAN Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$10.03 $1.73 $11.76
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: MATE Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.82 $1.73 $10.55
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: MATE Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.82 $1.73 $10.55
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: MESS COOK Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$7.71 $1.73 $9.44
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: MESS COOK Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$7.71 $1.73 $9.44
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: MESSMAN & JANITOR Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$7.53 $1.73 $9.26
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: MESSMAN & JANITOR Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$7.53 $1.73 $9.26
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: OILER & FIREMAN (HYDRAULIC DREDGES UNDER 20"") Heavy
ENGI0025-002 Scope differs by code/WD
$8.11 $1.73 $9.84
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: OILER & FIREMAN (HYDRAULIC DREDGES UNDER 20"") Heavy
ENGI0025-002 Scope differs by code/WD
$8.11 $1.73 $9.84
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: SHOREMAN Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$7.82 $1.73 $9.55
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: SHOREMAN Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$7.82 $1.73 $9.55
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: SPIDER BARGE OPERATOR Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20"").PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.68 $1.73 $10.41
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: SPIDER BARGE OPERATOR Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20"").PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.68 $1.73 $10.41
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Building
SUNC2011-042
$18.60 $1.41 $20.01
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Heavy
SUNC2011-049
$14.86 $1.50 $16.36
OPERATOR: CRANE Building
SUNC2011-042
$19.25 $2.37 $21.62
OPERATOR: GRADER/BLADE Building
SUNC2011-042
$15.25 $1.52 $16.77
PAINTER (BRIDGE) Highway
SUNC2014-001
$19.62 0.00 $19.62
PAINTER (BRUSH AND ROLLER) Residential
SUNC2016-003
$11.91 0.00 $11.91
PAINTER: BRUSH, ROLLER AND SPRAY Building
SUNC2011-042
$14.77 $1.87 $16.64
PAINTER: SPRAY Residential
SUNC2016-003
$11.91 0.00 $11.91
PIPEFITTER (EXCLUDING HVAC SYSTEM INSTALLATION) Building
PLUM0421-004
$31.66 $12.69 $44.35
PLUMBER Residential
SUNC2016-003
$14.39 0.00 $14.39
PLUMBER, EXCLUDES HVAC UNIT INSTALLATION Building
SUNC2011-042
$17.51 $2.33 $19.84
POWER EQUIPMENT OPERATOR Highway
SUNC2014-001 (TACK TRUCK/DISTRIBUTOR OPERATOR)
$14.67 $0.06 $14.73
POWER EQUIPMENT OPERATOR Highway
SUNC2014-001 (PAVEMENT MARKING EQUIPMENT)
$13.33 0.00 $13.33
POWER EQUIPMENT OPERATOR Highway
SUNC2014-001 (OFF-ROAD HAULER/WATER TANKER)
$13.87 0.00 $13.87
POWER EQUIPMENT OPERATOR Highway
SUNC2014-001 (MATERIAL TRANSFER VEHICLE (SHUTTLE BUGGY))
$17.39 0.00 $17.39
POWER EQUIPMENT OPERATOR Highway
SUNC2014-001 (LOADER GREATER THAN 2 CUBIC YARDS)
$16.01 0.00 $16.01
POWER EQUIPMENT OPERATOR Highway
SUNC2014-001 (LOADER 2 CUBIC YARDS OR LESS)
$13.38 0.00 $13.38
POWER EQUIPMENT OPERATOR (ASPHALT BROOM TRACTOR) Highway
SUNC2014-001
$11.00 0.00 $11.00
POWER EQUIPMENT OPERATOR (BULLDOZER FINE) Highway
SUNC2014-001
$16.20 0.00 $16.20
POWER EQUIPMENT OPERATOR (BULLDOZER ROUGH) Highway
SUNC2014-001
$13.89 0.00 $13.89
POWER EQUIPMENT OPERATOR (CONCRETE GRINDER/GROOVER) Highway
SUNC2014-001
$24.66 0.00 $24.66
POWER EQUIPMENT OPERATOR (CRANE BOOM TRUCKS) Highway
SUNC2014-001
$14.44 $0.53 $14.97
POWER EQUIPMENT OPERATOR (CRANE OTHER) Highway
SUNC2014-001
$19.59 0.00 $19.59
POWER EQUIPMENT OPERATOR (CRANE ROUGH/ALL-TERRAIN) Highway
SUNC2014-001
$21.25 0.00 $21.25
POWER EQUIPMENT OPERATOR (DRILL OPERATOR ROCK) Highway
SUNC2014-001
$15.25 0.00 $15.25
POWER EQUIPMENT OPERATOR (DRILL OPERATOR STRUCTURE) Highway
SUNC2014-001
$20.92 0.00 $20.92
POWER EQUIPMENT OPERATOR (EXCAVATOR FINE) Highway
SUNC2014-001
$16.11 0.00 $16.11
POWER EQUIPMENT OPERATOR (EXCAVATOR ROUGH) Highway
SUNC2014-001
$13.10 0.00 $13.10
POWER EQUIPMENT OPERATOR (GRADER/BLADE FINE) Highway
SUNC2014-001
$19.24 0.00 $19.24
POWER EQUIPMENT OPERATOR (GRADER/BLADE ROUGH) Highway
SUNC2014-001
$13.07 0.00 $13.07
POWER EQUIPMENT OPERATOR (OILER/GREASER) Highway
SUNC2014-001
$14.98 0.00 $14.98
POWER EQUIPMENT OPERATOR (PAVER ASPHALT) Highway
SUNC2014-001
$15.68 $0.05 $15.73
POWER EQUIPMENT OPERATOR (ROLLER ASPHALT BREAKDOWN) Highway
SUNC2014-001
$14.05 $0.06 $14.11
POWER EQUIPMENT OPERATOR (ROLLER ASPHALT FINISH) Highway
SUNC2014-001
$14.98 $0.04 $15.02
POWER EQUIPMENT OPERATOR (ROLLER OTHER) Highway
SUNC2014-001
$11.75 0.00 $11.75
POWER EQUIPMENT OPERATOR (SCRAPER FINISH) Highway
SUNC2014-001
$13.87 0.00 $13.87
POWER EQUIPMENT OPERATOR (SCRAPER ROUGH) Highway
SUNC2014-001
$11.53 0.00 $11.53
POWER EQUIPMENT OPERATOR (SLIP FORM MACHINE) Highway
SUNC2014-001
$20.79 0.00 $20.79
POWER EQUIPMENT OPERATOR: MECHANIC Highway
SUNC2014-001
$18.51 0.00 $18.51
POWER EQUIPMENT OPERATOR: MILLING MACHINE Highway
SUNC2014-001
$13.88 0.00 $13.88
ROOFER Building
SUNC2011-042
$13.55 $0.80 $14.35
ROOFER Residential
SUNC2016-003
$14.41 0.00 $14.41
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) Building
SUNC2011-042
$15.62 $2.09 $17.71
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION Building
SUNC2011-042
$13.61 $1.10 $14.71
SPILL BARGE OPERATOR Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.68 $1.73 $10.41
SPILL BARGE OPERATOR Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.68 $1.73 $10.41
TRUCK DRIVER Heavy
SUNC2011-049
$12.32 $1.46 $13.78
TRUCK DRIVER (GVWR OF 26,000 OR LESS) Highway
SUNC2014-001
$11.72 0.00 $11.72
TRUCK DRIVER (GVWR OF 26,001 LBS OR GREATER) Highway
SUNC2014-001
$13.50 0.00 $13.50
TRUCK DRIVER: DUMP TRUCK Building
SUNC2011-042
$12.50 $1.36 $13.86
WELDER Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$9.79 $1.73 $11.52
WELDER Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$9.79 $1.73 $11.52

Wage Determinations

Heavy

32 trades

Applies to

Alamance, Alexander, Alleghany, Anson, Ashe, Avery, Beaufort, Bertie, Bladen, Brunswick +90 more

Building

21 trades

Applies to

Ashe, Clay, Graham, Macon, McDowell, Mitchell, Polk, Rutherford, Surry, Swain +3 more

Heavy

6 trades

Applies to

Ashe, Avery, Cherokee, Clay, Graham, Jackson, Macon, McDowell, Mitchell, Polk +7 more

Highway

46 trades

Applies to

Alleghany, Ashe, Avery, Cherokee, Clay, Cleveland, Graham, Jackson, Lincoln, Macon +10 more

Residential

9 trades

Applies to

Alleghany, Ashe, Avery, Cherokee, Clay, Graham, Jackson, Macon, McDowell, Mitchell +5 more