NE20260026
rev 0Residential
0 trades
Applies to
Johnson, Nemaha, Otoe, Pawnee, Richardson in Nebraska.
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER Building BRNE0001-001 | $34.80 | $19.94 | $54.74 |
| CARPENTER Residential SUNE1982-004 | $8.52 | $0.00 | $8.52 |
| CARPENTER Heavy SUNE2011-016 | $22.02 | $2.68 | $24.70 |
| CARPENTER, Excludes Form Work Highway SUNE2011-028 | $16.39 | $0.00 | $16.39 |
| CARPENTER, Includes Form Work Building SUNE2012-020 | $16.10 | $1.46 | $17.56 |
| CEMENT MASON/CONCRETE FINISHER Residential SUNE1982-004 | $7.25 | $0.00 | $7.25 |
| CEMENT MASON/CONCRETE FINISHER Highway SUNE2011-028 | $16.37 | $0.00 | $16.37 |
| CEMENT MASON/CONCRETE FINISHER Heavy SUNE2011-016 | $18.75 | $3.25 | $22.00 |
| CEMENT MASON/CONCRETE FINISHER Building SUNE2012-020 | $17.54 | $1.41 | $18.95 |
| ELECTRICIAN Residential SUNE1982-004 | $7.90 | $0.00 | $7.90 |
| ELECTRICIAN Highway SUNE2011-028 | $20.07 | $0.00 | $20.07 |
| ELECTRICIAN Zone 1 Building ELEC0265-003 | $35.00 | $18.88 | $53.88 |
| Electricians: Zone 1 Heavy ELEC0265-006 | $35.00 | $18.88 | $53.88 |
| Electricians: Zone 2 Heavy ELEC0265-006 | $35.30 | $18.91 | $54.21 |
| Electricians: Zone 3 Heavy ELEC0265-006 | $35.60 | $18.94 | $54.54 |
| Electricians: Zone 4 Heavy ELEC0265-006 | $36.00 | $18.99 | $54.99 |
| ELEVATOR MECHANIC Building ELEV0028-001 | $55.88 | $38.44 | $94.31 |
| FORM WORKER Highway SUNE2011-028 | $11.18 | $0.00 | $11.18 |
| IRONWORKER, REINFORCING Highway SUNE2011-028 | $17.93 | $0.00 | $17.93 |
| IRONWORKER, STRUCTURAL Building SUNE2012-020 | $22.96 | $4.50 | $27.46 |
| LABORER Residential SUNE1982-004 | $7.25 | $0.00 | $7.25 |
| LABORER Building LABO1140-010 (Mason Tender, Brick & Hod) | $24.00 | $13.48 | $37.48 |
| LABORER: Common or General Heavy SUNE2011-016 | $12.98 | $2.33 | $15.31 |
| LABORER: Common or General Building SUNE2012-020 | $14.54 | $3.63 | $18.17 |
| LABORER: Common or General Butler, Fillmore, Gage, Jefferson, Johnson, Nemaha, Otoe, Pawnee, Polk, Richardson, Thayer & York Counties Highway SUNE2011-028 | $11.76 | $0.00 | $11.76 |
| LABORER: Landscape & Irrigation Highway SUNE2011-028 | $8.30 | $0.00 | $8.30 |
| LABORER: Mason Tender - Cement/Concrete Highway SUNE2011-028 | $9.75 | $0.00 | $9.75 |
| LABORER: Pipelayer Heavy SUNE2011-016 | $14.23 | $0.39 | $14.62 |
| LABORER: Traffic Control - Flagger and Cone/Barrel Setter Highway SUNE2011-028 | $9.00 | $0.00 | $9.00 |
| Operating Engineers: Highway SUNE2011-028 (Skid Loader) | $12.74 | $0.00 | $12.74 |
| OPERATOR: Asphalt Plant Highway SUNE2011-028 | $14.09 | $0.00 | $14.09 |
| OPERATOR: Backhoe Loader Combo Highway SUNE2011-028 | $13.58 | $0.00 | $13.58 |
| OPERATOR: Backhoe/Excavator/Trackhoe Heavy SUNE2011-016 | $18.54 | $2.15 | $20.69 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUNE2012-020 | $21.82 | $2.22 | $24.04 |
| OPERATOR: Broom/Sweeper Highway SUNE2011-028 | $11.41 | $0.00 | $11.41 |
| OPERATOR: Bulldozer Highway SUNE2011-028 | $16.01 | $0.00 | $16.01 |
| OPERATOR: Compactor Highway SUNE2011-028 | $10.05 | $0.00 | $10.05 |
| OPERATOR: Crane Highway SUNE2011-028 | $16.17 | $0.00 | $16.17 |
| OPERATOR: Distributor Highway SUNE2011-028 | $14.37 | $0.00 | $14.37 |
| OPERATOR: Grader/Blade Highway SUNE2011-028 | $15.77 | $0.00 | $15.77 |
| OPERATOR: Loader Highway SUNE2011-028 | $16.63 | $0.00 | $16.63 |
| OPERATOR: Mechanic Highway SUNE2011-028 | $14.64 | $0.00 | $14.64 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Heavy SUNE2011-016 | $19.47 | $4.07 | $23.54 |
| OPERATOR: OPERATOR: Bulldozer Heavy SUNE2011-016 | $15.95 | $3.04 | $18.99 |
| OPERATOR: OPERATOR: Loader Heavy SUNE2011-016 | $15.76 | $0.90 | $16.66 |
| OPERATOR: OPERATOR: Loader Building SUNE2012-020 | $16.58 | $0.94 | $17.52 |
| OPERATOR: OPERATOR: Scraper Heavy SUNE2011-016 | $14.89 | $2.06 | $16.95 |
| OPERATOR: Paver Highway SUNE2011-028 (Asphalt, Aggregate, and Concrete) | $17.90 | $0.00 | $17.90 |
| OPERATOR: PLUMBER Building SUNE2012-020 (HVAC Pipe Installation) | $25.55 | $7.54 | $33.09 |
| OPERATOR: PLUMBER Building SUNE2012-020 Scope differs by code/WD | $26.55 | $8.87 | $35.42 |
| OPERATOR: Roller Highway SUNE2011-028 | $13.02 | $0.00 | $13.02 |
| OPERATOR: ROOFER Building SUNE2012-020 | $14.52 | $0.65 | $15.17 |
| OPERATOR: Scraper Highway SUNE2011-028 | $15.23 | $0.00 | $15.23 |
| OPERATOR: Screed Highway SUNE2011-028 | $12.35 | $0.00 | $12.35 |
| OPERATOR: Tractor Highway SUNE2011-028 | $12.45 | $0.00 | $12.45 |
| OPERATOR: Trencher Highway ENGI0571-005 | $32.18 | $19.75 | $51.93 |
| OPERATOR: TRUCK DRIVER: Dump Truck Heavy SUNE2011-016 | $13.62 | 0.00 | $13.62 |
| OPERATOR: TRUCK DRIVER: Dump, Lowboy and Tandem Building SUNE2012-020 | $14.56 | $1.68 | $16.24 |
| PAINTER Residential SUNE1982-004 | $7.27 | $0.00 | $7.27 |
| PIPEFITTER Building PLUM0464-003 (does not include HVAC piping) | $46.25 | $21.10 | $67.35 |
| PLUMBER Residential SUNE1982-004 | $7.25 | $0.00 | $7.25 |
| Power equipment operators: Bulldozer Residential SUNE1982-004 | $7.88 | $0.00 | $7.88 |
| Power equipment operators: Front end loader Residential SUNE1982-004 | $7.25 | $0.00 | $7.25 |
| Power equipment operators: Motor grader Residential SUNE1982-004 | $7.25 | $0.00 | $7.25 |
| Power equipment operators: ROOFER Residential SUNE1982-004 | $12.15 | $2.50 | $14.65 |
| Power equipment operators: Scraper Residential SUNE1982-004 | $7.50 | $0.00 | $7.50 |
| Power equipment operators: Sheet metal worker Residential SUNE1982-004 | $7.25 | $0.00 | $7.25 |
| Power equipment operators: Tractor Residential SUNE1982-004 | $7.25 | $0.00 | $7.25 |
| Power equipment operators: TRUCK DRIVER Residential SUNE1982-004 | $7.25 | $0.00 | $7.25 |
| SHEET METAL WORKER Building SHEE0003-006 (Includes HVAC Duct Installation) | $39.65 | $19.87 | $59.52 |
| TRUCK DRIVER: Lowboy Truck Highway SUNE2011-028 | $11.97 | $0.00 | $11.97 |
| TRUCK DRIVER: Oil Distributor Truck Highway SUNE2011-028 | $13.25 | $0.00 | $13.25 |
| TRUCK DRIVER: Semi-Trailer Truck Highway SUNE2011-028 | $14.20 | $0.00 | $14.20 |
| TRUCK DRIVER: Water Truck Highway SUNE2011-028 | $13.47 | $0.00 | $13.47 |
| Zone 2 Building ELEC0265-003 | $35.30 | $18.91 | $54.21 |
| Zone 3 Building ELEC0265-003 | $35.60 | $18.94 | $54.54 |
| Zone 4 Building ELEC0265-003 | $36.00 | $18.99 | $54.99 |
No trade rates match your search and filter selection.
Residential
Applies to
Johnson, Nemaha, Otoe, Pawnee, Richardson in Nebraska.
Highway
Applies to
Butler, Fillmore, Gage, Jefferson, Johnson, Nemaha, Otoe, Pawnee, Polk, Richardson +3 more
Heavy
Applies to
Fillmore, Gage, Johnson, Nemaha, Otoe, Pawnee, Polk, Richardson, Saline, Thayer +1 more
Building
Applies to
Otoe, Pawnee in Nebraska.