NV20260001
rev 2Building, Heavy, Highway
40 trades
Applies to
Clark, Lincoln, Nye
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Get an email when wage determinations covering Clark County, Nevada are modified.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| (1A) Flagger Heavy LABO0169-015 | $27.18 | $15.02 | $42.20 | |
| ASBESTOS / INSULATOR WORKER Building ASBE0135-001 (MECHANIC) ZONE: C - NTTR $8.00 | $69.35 | $19.88 | $89.23 | |
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0135-002 | $62.00 | $23.48 | $85.48 | |
| ASBESTOS/INSULATOR WORKER: MECHANIC Building ASBE0135-004 (ZONE PAY (0-19 MILES, LAS VEGAS): $0.00 ZONE PAY (20-45 MILES): $4.00 ZONE PAY (46-75 MILES, MERCURY): $7.00 ZONE PAY (150+ MILES, NTTR): $8.00) | $67.19 | $19.88 | $87.07 | |
| BOILERMAKER (BLACKSMITH) Building BOIL0092-002 | $44.31 | $28.96 | $73.27 | |
| BOILERMAKER: BLACKSMITH ZONE PAY Building BOIL0092-006 (ZONE A - LAS VEGAS $0.00 ZONE B - MERCURY & FORWARD AREAS $2.00 ZONE C - NTTR $2.50) | $44.31 | $28.96 | $73.27 | |
| BRICKLAYER Building BRNV0013-003 (ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | $52.79 | $20.89 | $73.68 | |
| BRICKLAYER Heavy SUNV2014-024 | $27.36 | 0.00 | $27.36 | |
| BRICKLAYER Building BRNV0013-007 Scope differs by code/WD | $53.57 | $20.05 | $73.62 | |
| BRICKLAYER ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00 Building BRNV0013-004 | $50.90 | $19.93 | $70.83 | |
| CARPENTER Building CARP1977-007 (ZONE PAY: ZONE A: LAS VEGAS - FREE ZONE ZONE B: MERCURY, FORWARD & NTTR AREAS - $4.25) | $52.12 | $28.08 | $80.20 | |
| CARPENTER Building CARP1977-002 (Includes Acoustical Ceiling Installation, Drywall Hanging, Form Work, Metal Stud Installation, and Batt Insulation) | $57.69 | $21.53 | $79.22 | |
| CARPENTER Highway CARP1977-008 | $46.50 | $17.92 | $64.42 | |
| CARPENTER ZONE PAY: ZONE 1: FREE ZONE- $0.00; ZONE 2: 40-60 MILES -$2.50; ZONE 3: OVER 60 MILES-$4.25 Building CARP1977-006 | $50.77 | $28.28 | $79.05 | |
| CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND BATT INSULATION Residential SUNV2014-028 | $16.64 | 0.00 | $16.64 | |
| CARPENTER, Includes Form Work Heavy SUNV2014-024 | $31.78 | $16.03 | $47.81 | |
| CARPENTER, LOCKSMITH ZONE PAY: ZONE 1: FREE ZONE- OVER 60 MILES-$4.25 Building CARP1977-006 | $55.85 | $28.28 | $84.13 | |
| CARPENTER, POWER SAW OPERATOR/PNEUMATIC NAILER ZONE PAY: ZONE 1: FREE ZONE- $0.00; ZONE 2: 40-60 MILES -$2.50; ZONE 3: OVER 60 MILES-$4.25 Building CARP1977-006 | $50.77 | $28.28 | $79.05 | |
| CAULKER Building BRNV0013-003 (ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | $52.79 | $20.89 | $73.68 | |
| CEMENT MASON Building PLAS0797-004 (ZONE PAY ZONE A - LAS VEGAS - NO PAY ZONE ZONE B - MERCURY AND FORWARD AREAS-$5.00 ZONE C - NTTR-$5.50) | $43.27 | $29.66 | $72.93 | |
| CEMENT MASON Building PLAS0797-004 (ZONE PAY ZONE A - LAS VEGAS - NO PAY ZONE ZONE B - MERCURY AND FORWARD AREAS-$5.00 ZONE C - NTTR-$5.50) | $43.27 | $29.66 | $72.93 | |
| CEMENT MASON ZONE PAY $4.00 Building PLAS0797-003 | $55.79 | $21.95 | $77.74 | |
| CEMENT MASON/CONCRETE FINISHER Heavy PLAS0797-007 | $52.29 | $19.79 | $72.08 | |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0797-005 | $52.29 | $19.79 | $72.08 | |
| CEMENT MASON/CONCRETE FINISHER Residential SUNV2014-028 | $17.00 | 0.00 | $17.00 | |
| CEMENT MASON/CONCRETE FINISHER Highway PLAS0797-006 | $52.29 | $19.79 | $72.08 | |
| Drilling depth of 45' maximum Highway ENGI0012-029 | $63.79 | $36.40 | $100.19 | |
| Dump Truck Highway TEAM0631-005 (16 yrds up to and including 22 yrds water level) | $37.52 | $33.41 | $70.93 | |
| Dump Truck (Tandem) Highway TEAM0631-005 | $38.20 | $33.41 | $71.61 | |
| ELECTRICIAN Building ELEC0357-002 (CABLE SPLICER) ZONE PAY: ZONE 1: 0-25 MILES - $0.00 ZONE 2: 26-55 MILES - $2.50 ZONE 3: OVER 55 MILES - $3.50 | $65.84 | $33.38 | $99.22 | |
| ELECTRICIAN Building ELEC0357-002 (COMMUNICATION TECHNICIAN) ZONE PAY: ZONE 1: 0-25 MILES - $0.00 ZONE 2: 26-55 MILES - $2.50 ZONE 3: OVER 55 MILES - $3.50 | $65.84 | $33.38 | $99.22 | |
| ELECTRICIAN Building ELEC0357-005 (ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C: OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50) | $64.37 | $28.81 | $93.18 | |
| ELECTRICIAN Building ELEC0357-009 (Includes Low Voltage Wiring and Installation of Alarms and Sound and Communication Systems) | $58.48 | $27.62 | $86.10 | |
| ELECTRICIAN Highway ELEC0357-006 | $58.48 | $27.62 | $86.10 | |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING) Residential ELEC0357-004 | $58.48 | $27.62 | $86.10 | |
| ELECTRICIAN Excluding Low Voltage Heavy ELEC0357-010 | $58.48 | $27.62 | $86.10 | |
| ELECTRICIAN ZONE PAY: ZONE 1: 0-25 MILES - $0.00 ZONE 2: 26-55 MILES - $2.50 ZONE 3: OVER 55 MILES - $3.50 Building ELEC0357-002 | $65.84 | $33.38 | $99.22 | |
| ELECTRICIAN: CABLE SPLICER Building ELEC0357-005 (ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C: OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50) | $61.22 | $28.70 | $89.92 | |
| ELECTRICIAN: COMMUNICATION TECHNICIAN ONLY Building ELEC0357-005 (ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C: OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50) | $64.37 | $28.81 | $93.18 | |
| ELEVATOR MACHANIC Building ELEV0018-003 (ZONE PAY: ZONE A- LAS VEGAS. ZONE B-MERCURY $2.00. ZONE C- NTTR $2.50. FOOTNOTE: ADDITIONAL FRINGE BENEFITS TO BE PAID A: PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 0 MONTHS TO 5 YEARS OF SERVICE. B: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY.) | $69.43 | $38.44 | $107.87 | |
| ELEVATOR MECHANIC Building ELEV0018-005 | $69.43 | $38.44 | $107.87 | |
| FLOOR LAYER: SOFT FLOORS Residential SUNV2014-028 | $28.26 | $12.11 | $40.37 | |
| GLAZIER Building PAIN2001-002 | $58.44 | $28.91 | $87.35 | |
| GLAZIER Residential SUNV2014-028 | $22.61 | 0.00 | $22.61 | |
| GROUP 02 Building ENGI0012-016 | $61.79 | $36.40 | $98.19 | |
| GROUP 03 Building ENGI0012-016 | $62.08 | $36.40 | $98.48 | |
| GROUP 04 Heavy ENGI0012-020 | $63.57 | $36.40 | $99.97 | |
| GROUP 04 Building ENGI0012-016 | $63.57 | $36.40 | $99.97 | |
| GROUP 05 Building ENGI0012-016 Scope differs by code/WD | $64.67 | $36.40 | $101.07 | |
| GROUP 05 Building ENGI0012-018 Scope differs by code/WD | $64.02 | $36.40 | $100.42 | |
| GROUP 06 Heavy ENGI0012-020 | $63.79 | $36.40 | $100.19 | |
| GROUP 06 Building ENGI0012-016 Scope differs by code/WD | $63.79 | $36.40 | $100.19 | |
| GROUP 06 Building ENGI0012-018 Scope differs by code/WD | $64.19 | $36.40 | $100.59 | |
| GROUP 07 Building ENGI0012-018 | $64.36 | $36.40 | $100.76 | |
| GROUP 08 Heavy ENGI0012-020 | $63.90 | $36.40 | $100.30 | |
| GROUP 08 Building ENGI0012-016 Scope differs by code/WD | $63.90 | $36.40 | $100.30 | |
| GROUP 08 Building ENGI0012-018 Scope differs by code/WD | $64.52 | $36.40 | $100.92 | |
| GROUP 09 Building ENGI0012-018 | $65.20 | $36.40 | $101.60 | |
| Group 10 Heavy ENGI0012-019 | $64.02 | $36.40 | $100.42 | |
| GROUP 10 Heavy ENGI0012-020 | $64.02 | $36.40 | $100.42 | |
| GROUP 10 Building ENGI0012-016 Scope differs by code/WD | $64.02 | $36.40 | $100.42 | |
| GROUP 10 Building ENGI0012-018 Scope differs by code/WD | $65.36 | $36.40 | $101.76 | |
| Group 12 Heavy ENGI0012-019 | $64.19 | $36.40 | $100.59 | |
| GROUP 12 Heavy ENGI0012-020 | $64.19 | $36.40 | $100.59 | |
| GROUP 12 Building ENGI0012-016 Scope differs by code/WD | $64.19 | $36.40 | $100.59 | |
| GROUP 12 Building ENGI0012-018 Scope differs by code/WD | $65.99 | $36.40 | $102.39 | |
| GROUP 13 Building ENGI0012-018 | $66.36 | $36.40 | $102.76 | |
| GROUP 15 Building ENGI0012-018 | $67.36 | $36.40 | $103.76 | |
| Group 16 Heavy ENGI0012-019 | $64.52 | $36.40 | $100.92 | |
| GROUP 16 Heavy ENGI0012-014 | $67.41 | $36.40 | $103.81 | |
| GROUP 16 Building ENGI0012-016 Scope differs by code/WD | $64.52 | $36.40 | $100.92 | |
| GROUP 16 Building ENGI0012-018 Scope differs by code/WD | $67.41 | $36.40 | $103.81 | |
| GROUP 17 Heavy ENGI0012-014 | $67.91 | $36.40 | $104.31 | |
| GROUP 17 Building ENGI0012-018 | $67.91 | $36.40 | $104.31 | |
| GROUP 18 Building ENGI0012-018 | $68.36 | $36.40 | $104.76 | |
| GROUP 19 Heavy ENGI0012-014 | $69.94 | $36.40 | $106.34 | |
| GROUP 19 Building ENGI0012-018 | $69.94 | $36.40 | $106.34 | |
| GROUP 20 Heavy ENGI0012-014 | $70.55 | $36.40 | $106.95 | |
| GROUP 20 Building ENGI0012-018 | $70.55 | $36.40 | $106.95 | |
| GROUP 21 Heavy ENGI0012-014 | $71.16 | $36.40 | $107.56 | |
| GROUP 21 Building ENGI0012-018 | $71.16 | $36.40 | $107.56 | |
| GROUP 22 Heavy ENGI0012-014 | $71.92 | $36.40 | $108.32 | |
| GROUP 22 Building ENGI0012-018 | $71.92 | $36.40 | $108.32 | |
| GROUP 23 Heavy ENGI0012-014 | $72.38 | $36.40 | $108.78 | |
| GROUP 23 Building ENGI0012-018 | $72.38 | $36.40 | $108.78 | |
| GROUP 25 Building ENGI0012-016 | $65.69 | $36.40 | $102.09 | |
| Group 8 Heavy ENGI0012-019 | $64.29 | $36.40 | $100.69 | |
| Heavy Equipment Operator Heavy ELEC0396-001 | $43.04 | $19.51 | $62.55 | |
| HIGHWAY STRIPING: Laborer Highway SUNV2021-013 | $41.54 | $21.77 | $63.31 | |
| HVAC MECHANIC Residential SUNV2014-028 (HVAC DUCT AND UNIT INSTALLATION ONLY) | $15.00 | 0.00 | $15.00 | |
| IRONWORKER Highway IRON0433-010 | $50.70 | $35.15 | $85.85 | |
| IRONWORKER (ZONE PAY- NNSS $5.50; NTTR $5.50) Building IRON0118-014 | $55.06 | $37.26 | $92.32 | |
| IRONWORKER ZONE PAY: $4.50 Building IRON0118-015 | $59.46 | $35.59 | $95.05 | |
| IRONWORKER, ORNAMENTAL Building IRON0433-004 | $50.70 | $35.15 | $85.85 | |
| IRONWORKER, REINFORCING Heavy IRON0416-002 | $50.70 | $35.15 | $85.85 | |
| IRONWORKER, REINFORCING Building IRON0416-003 | $50.70 | $35.15 | $85.85 | |
| IRONWORKER, REINFORCING Residential SUNV2014-028 | $15.21 | 0.00 | $15.21 | |
| IRONWORKER, STRUCTURAL Heavy IRON0433-002 | $46.20 | $34.30 | $80.50 | |
| IRONWORKER, STRUCTURAL Building IRON0433-004 | $50.70 | $35.15 | $85.85 | |
| IRONWORKER, STRUCTURAL Residential SUNV2014-028 | $22.09 | 0.00 | $22.09 | |
| KEEPER, PACKING ROD STEEL AND PANS; ZONE PAY: LABORER GROUP 1: BUILDING/OFFICE CLEANUP, FLAGPERSON; ZONE PAY: $3.75 FOOT NOTE: SAVINGS ACCOUNT OF $2.29 SHOULD BE ADDED TO THE BASE RATE Building LABO0872-008 | $46.40 | $29.35 | $75.75 | |
| KEEPER, PACKING ROD STEEL AND PANS; ZONE PAY: LABORER GROUP 2: LABORER - GENERAL Building LABO0872-008 (CONSTRUCTION CLEANUP, ETC.), DEMOLITION, DRY PACKING CONCRETE & FILLING OF FORM BOLT HOLES, FENCE BUILDER, TOOL ATTENDANT (JOBSITE ONLY), GAS & OIL PIPELINE, WINDOW CLEANERS, FINE GRADER, HIGHWAY & STREET PAVING, AIRPORT RUNWAYS & SIMILAR WORK, GUINEA CHASER, LANDSCAPE GARDENER, NURSERYMAN AND GROUNDS BE ADDED TO THE BASE RATE | $47.34 | $29.35 | $76.69 | |
| LABORER Heavy LABO0169-015 (1) Cones/ Barricades/ Barrels- Setter/Mover/Sweeper | $30.05 | $15.02 | $45.07 | |
| LABORER Heavy LABO0872-003 (1) Common or General | $38.53 | $33.41 | $71.94 | |
| LABORER Building LABO0169-037 (4) Pipelayer | $34.45 | $16.30 | $50.75 | |
| LABORER Building LABO0872-015 (1) Laborer: Common or General, Landscape | $38.53 | $33.41 | $71.94 | |
| LABORER ((3) MASON TENDER-CEMENT/CONCRETE) Residential LABO0169-002 | $30.30 | $15.02 | $45.32 | |
| LABORER ((4) PIPELAYER) Residential LABO0169-002 | $30.55 | $15.02 | $45.57 | |
| LABORER GROUP 3: ASBESTOS ABATEMENT, CHUCKTENDER Building LABO0872-008 (EXCEPT TUNNELS), GAS & OIL PIPELINE WRAPPER-POT TENDER AND FORM MAN, OPERATOR OF CEMENT GRINDING MACHINE, ROTO-SCRAPER, SANDBLASTER (POT TENDER), SCALER, SEPTIC TANK DIGGER & INSTALLER (LEADMAN),MAKING & CAULKING OF ALL NONMETALLIC PIPE JOINTS, TREE CLIMBER, FALLER, CHAIN SAW OPERATOR, PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHEDDERS, TANK SCALER AND CLEANER, CONCRETE SAWMAN, CONCRETE CORE CUTTER, MACHINE TOOL OPERATOR (OPERATORS AND TENDERS OF PNEUMATIC & ELECTRIC TOOLS, VIBRATING MACHINES AND SIMILAR MECHANICAL TOOLS NOT SEPARATELY CLASSIFIED HEREIN, INCLUDING HANDGUIDED DITCH WITCH AND HAND-TYPE ROLLER), ASPHALT RAKER, IRONER, SPREADER, SLURRY SEALER, BUGGYMOBILE MAN, CEMENT DUMPER, CONCRETE CURER, CESSPOOL DIGGER & INSTALLER, RIP RAP STONE PAVER; ZONE PAY: $3.75 FOOT NOTE: SAVINGS ACCOUNT OF $2.29 SHOULD BE ADDED TO THE BASE RATE | $47.55 | $29.35 | $76.90 | |
| LABORER GROUP 5: DRILLER, HEAD ROCK SLINGER, SANDBLASTER Building LABO0872-008 (NOZZLEMAN), STEEL HEADERBOARD MAN, POWDERMAN, CRIBBER OR SHORER; ZONE PAY: $3.75 FOOT NOTE: SAVINGS ACCOUNT OF $2.29 SHOULD BE ADDED TO THE BASE RATE | $48.05 | $29.35 | $77.40 | |
| LABORER GROUP 6: HERBICIDE, PESTICIDE, HANTAVIRUS SUPPRESSION; ZONE PAY: $3.75 FOOT NOTE: SAVINGS ACCOUNT OF $2.29 SHOULD BE ADDED TO THE BASE RATE Building LABO0872-008 | $48.35 | $29.35 | $77.70 | |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Highway LABO0872-011 | $38.74 | $33.41 | $72.15 | |
| LABORER: BULLGANG, MUCKER, TRACKMAN Building LABO0872-010 (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE) | $46.44 | $27.27 | $73.71 | |
| LABORER: Common or General Highway LABO0872-016 | $38.53 | $33.41 | $71.94 | |
| LABORER: COMMON OR GENERAL Residential SUNV2014-028 | $15.65 | 0.00 | $15.65 | |
| LABORER: Concrete Saw Highway LABO0169-012 | $34.20 | $16.30 | $50.50 | |
| LABORER: Jackhammer Highway LABO0872-017 | $38.84 | $33.41 | $72.25 | |
| LABORER: Landscape Highway SUNV2021-013 | $31.74 | $28.79 | $60.53 | |
| LABORER: Mason Tender - Cement/Concrete Highway LABO0872-017 | $38.84 | $33.41 | $72.25 | |
| LABORER: MINER-TUNNEL HARDROCK Building LABO0872-010 (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE) | $46.69 | $27.27 | $73.96 | |
| LABORER: Pipelayer Highway LABO0872-017 | $38.84 | $33.41 | $72.25 | |
| LABORER: SHAFT, RAISE, STOPE MINER Building LABO0872-010 (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE) | $47.69 | $27.27 | $74.96 | |
| LINE CONSTRUCTION Groundman Heavy ELEC0396-001 | $38.74 | $19.36 | $58.10 | |
| LINE CONSTRUCTION, HEAVY EQUIPMENT OPERATOR ZONE PAY - NNSS $5.00 NTTR $5.00 Building ELEC0396-005 | $68.11 | $25.40 | $93.51 | |
| LINE CONSTRUCTION: GROUNDMAN Building ELEC0396-005 Scope differs by code/WD | $55.17 | $25.02 | $80.19 | |
| LINE CONSTRUCTION: GROUNDMAN Building ELEC0396-004 (ZONE PAY -NNSS $5.00; NTTR $5.00) | $49.66 | $31.50 | $81.16 | |
| LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATOR Building ELEC0396-004 (ZONE PAY -NNSS $5.00; NTTR $5.00) | $62.08 | $31.99 | $94.07 | |
| LINE CONSTRUCTION: LINEMAN Building ELEC0396-005 Scope differs by code/WD | $68.11 | $25.40 | $93.51 | |
| LINE CONSTRUCTION: LINEMAN Building ELEC0396-004 (ZONE PAY -NNSS $5.00; NTTR $5.00) | $62.08 | $31.99 | $94.07 | |
| Lineman Heavy ELEC0396-001 | $55.77 | $19.95 | $75.72 | |
| Low Voltage Wiring Only Heavy ELEC0357-010 | $58.48 | $27.62 | $86.10 | |
| MARBLE SETTER Building BRNV0013-003 (ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | $52.44 | $18.79 | $71.23 | |
| MARBLE SETTER ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00 Building BRNV0013-004 | $50.27 | $18.29 | $68.56 | |
| MASON - STONE Building SUNV2014-010 | $23.30 | 0.00 | $23.30 | |
| MILLWRIGHT Building CARP1607-006 (ZONE PAY: ZONE A: LAS VEGAS- FREE ZONE ZONE B: MERCURY, FORWARD & NTTR AREAS-$4.25) | $54.16 | $27.84 | $82.00 | |
| MILLWRIGHT Building CARP1607-003 Scope differs by code/WD | $48.93 | $31.43 | $80.36 | |
| MILLWRIGHT ZONE PAY ZONE 1: FREE ZONE; ZONE 2: $2.50 - 40-60 MILES; ZONE 3: $4.25 - OVER 60 MILES Building CARP1607-005 | $50.77 | $28.28 | $79.05 | |
| OPERATOR: Backhoe/Excavator/Trackhoe Highway ENGI0012-025 | $63.90 | $36.40 | $100.30 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Residential SUNV2014-028 | $20.16 | 0.00 | $20.16 | |
| OPERATOR: Bobcat/Skid Steer/Skid Loader Heavy SUNV2014-024 | $29.93 | 0.00 | $29.93 | |
| OPERATOR: Bobcat/Skid Steer/Skid Loader Highway ENGI0012-026 | $62.08 | $36.40 | $98.48 | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER Residential SUNV2014-028 | $24.11 | 0.00 | $24.11 | |
| OPERATOR: Broom/Sweeper Heavy SUNV2014-024 | $36.66 | $12.22 | $48.88 | |
| OPERATOR: Broom/Sweeper Highway ENGI0012-027 | $63.57 | $36.40 | $99.97 | |
| OPERATOR: Compactor Highway ENGI0012-028 | $63.90 | $36.40 | $100.30 | |
| OPERATOR: Crane Highway ENGI0012-034 (Oiler) 40 tons up to and including 200 ton M.R.C | $64.52 | $36.40 | $100.92 | |
| OPERATOR: Drill Drilling depth of 105' maximum Highway ENGI0012-029 | $64.02 | $36.40 | $100.42 | |
| OPERATOR: Forklift Under 5 Tons Highway ENGI0012-030 | $60.84 | $36.40 | $97.24 | |
| OPERATOR: Grade Checker Highway ENGI0012-028 | $63.90 | $36.40 | $100.30 | |
| OPERATOR: Grader/Blade Highway ENGI0012-032 | $64.02 | $36.40 | $100.42 | |
| OPERATOR: Loader Highway ENGI0012-033 | $63.90 | $36.40 | $100.30 | |
| OPERATOR: Mechanic Highway ENGI0012-028 | $63.90 | $36.40 | $100.30 | |
| OPERATOR: Milling Machine Highway ENGI0012-028 | $63.90 | $36.40 | $100.30 | |
| OPERATOR: Oiler Highway ENGI0012-036 | $63.57 | $36.40 | $99.97 | |
| OPERATOR: Paver Heavy SUNV2014-024 (Asphalt, Aggregate, and Concrete) | $28.99 | 0.00 | $28.99 | |
| OPERATOR: Paver Highway ENGI0012-028 (Asphalt, Aggregate, and Concrete) | $63.90 | $36.40 | $100.30 | |
| OPERATOR: Piledriver Highway ENGI0012-038 | $63.90 | $36.40 | $100.30 | |
| OPERATOR: Pump Concrete Pump Operator- Truck Mounted Highway ENGI0012-039 | $65.69 | $36.40 | $102.09 | |
| OPERATOR: Roller Heavy SUNV2014-024 | $27.35 | 0.00 | $27.35 | |
| OPERATOR: Roller Highway ENGI0012-040 | $63.79 | $36.40 | $100.19 | |
| OPERATOR: Scraper Highway ENGI0012-041 | $63.90 | $36.40 | $100.30 | |
| OPERATOR: Screed Highway ENGI0012-027 | $63.57 | $36.40 | $99.97 | |
| PAINTER Building PAIN0159-005 (Brush, Roller, Spray & Drywall Finishing/Taping) | $50.62 | $24.20 | $74.82 | |
| PAINTER Highway SUNV2021-013 | $50.68 | 0.00 | $50.68 | |
| PAINTER (BRUSH AND ROLLER) Residential SUNV2014-028 | $18.76 | 0.00 | $18.76 | |
| PAINTER (ZONE PAY- NNSS $5.00; NTTR $5.00) Building PAIN0159-002 | $51.79 | $24.18 | $75.97 | |
| PAINTER, GROUP 1: BRUSH AND ROLLER ZONE PAY ZONE 1: 0-40 MILES - $0.00; ZONE 2: 41-60 MILES - $2.50; ZONE 3: OVER 60 MILES - $4.25 Building PAIN0159-001 | $52.75 | $28.70 | $81.45 | |
| PAINTER, GROUP 3: FLOOR COVERS, CARPET, LINOLEUM, RESILIENT TILE WORKERS, SPRAY PAINTER Building PAIN0159-001 (STRUCTURAL STEEL, OR WHEN WORKING FROM RIGGING, SWING STAG OR BOATSWAIN CHAIR), STEEPLE-JACK AND GLAZIER. ZONE PAY ZONE 1: 0-40 MILES - $0.00; ZONE 2: 41-60 MILES - $2.50; ZONE 3: OVER 60 MILES - $4.25 | $52.75 | $28.70 | $81.45 | |
| PAINTER, SPRAY AND PAPERHANGER SIGN Building PAIN0159-002 (ZONE PAY- NNSS $5.00; NTTR $5.00) | $52.14 | $24.18 | $76.32 | |
| PAINTER, TAPER, FLUSHER AND DETAILER Building PAIN0159-002 (ZONE PAY- NNSS $5.00; NTTR $5.00) | $52.14 | $24.18 | $76.32 | |
| PAINTER: FLOORCOVERER, CARPET, LINOLEUM AND TILE GLAZIER (ZONE PAY- NNSS $5.00; NTTR $5.00) Building PAIN0159-002 | $52.40 | $24.18 | $76.58 | |
| PAINTER: SPRAY Residential SUNV2014-028 | $19.18 | 0.00 | $19.18 | |
| PIPEFITTER Building PLUM0525-004 (INCLUDING CFC HVACR TECHNICIAN, INSERT GAS WELDER, BOILER TECHNICIAN) ZONE PAY: ZONE 1: $0.00 - 0-20 MILES; ZONE 2: $3.75 - 20.01-45 MILES ; ZONE 3: $7.50 - 45.01-75 MILES; ZONE 4: $11.25 - 75.01 MILES AND OVER | $65.79 | $26.55 | $92.34 | |
| PIPEFITTER Building PLUM0525-006 Scope differs by code/WD | $60.00 | $26.80 | $86.80 | |
| PIPEFITTER: INCLUDING INERT GAS WELDER Building PLUM0525-007 (ZONE PAY: MERCURY $7.50; FORWARD AREAS $11.25; NTTR $11.25) | $62.85 | $26.75 | $89.60 | |
| PLASTERER Building PLAS0797-004 (ZONE PAY ZONE A - LAS VEGAS - NO PAY ZONE ZONE B - MERCURY AND FORWARD AREAS-$5.00 ZONE C - NTTR-$5.50) | $42.03 | $28.05 | $70.08 | |
| PLASTERER Building PLAS0797-004 (ZONE PAY ZONE A - LAS VEGAS - NO PAY ZONE ZONE B - MERCURY AND FORWARD AREAS-$5.00 ZONE C - NTTR-$5.50) | $42.03 | $28.05 | $70.08 | |
| PLASTERER Building PLAS0797-005 Scope differs by code/WD | $51.85 | $18.73 | $70.58 | |
| PLASTERER ZONE PAY $4.00 Building PLAS0797-003 | $55.79 | $21.95 | $77.74 | |
| PLUMBER Building PLUM0525-004 (INCLUDING LEAD BURNER) ZONE PAY: ZONE 1: MILES ; ZONE 3: $7.50 - 45.01-75 MILES; ZONE 4: $11.25 - 75.01 MILES AND OVER | $65.79 | $26.55 | $92.34 | |
| PLUMBER Building PLUM0525-006 (Includes HVAC Pipe Installation and HVAC Unit Installation) | $60.00 | $26.80 | $86.80 | |
| PLUMBER Residential SUNV2014-028 | $18.94 | 0.00 | $18.94 | |
| PLUMBER: INCLUDLING LEAD BURNER Building PLUM0525-007 (ZONE PAY: MERCURY $7.50; FORWARD AREAS $11.25; NTTR $11.25) | $62.85 | $26.75 | $89.60 | |
| PLUMBER/PIPEFITTER Heavy PLUM0525-003 | $60.00 | $26.80 | $86.80 | |
| POWER EQUIPMENT OPERATOR Heavy ENGI0012-014 (Crane) GROUP 12 | $65.99 | $36.40 | $102.39 | |
| POWER EQUIPMENT OPERATOR Heavy ENGI0012-019 (Backhoe/Excavator/Trackhoe) Group 4 | $63.57 | $36.40 | $99.97 | |
| POWER EQUIPMENT OPERATOR Residential ENGI0012-006 ((8) PAVER (ASPHALT, AGGREGATE, AND CONCRETE)) | $63.90 | $36.40 | $100.30 | |
| POWER EQUIPMENT OPERATOR ((6) LOADER) Residential ENGI0012-006 | $63.79 | $36.40 | $100.19 | |
| POWER EQUIPMENT OPERATOR GROUP 01 Heavy ENGI0012-020 | $60.84 | $36.40 | $97.24 | |
| POWER EQUIPMENT OPERATOR GROUP 01 Building ENGI0012-016 | $60.84 | $36.40 | $97.24 | |
| POWER EQUIPMENT OPERATOR GROUP 04 Building ENGI0012-018 | $63.90 | $36.40 | $100.30 | |
| POWER EQUIPMENT OPERATOR GROUP 1 AIR COMPRESSOR, PUMP OR GENERATOR OPERATOR; ENGINEER- OILER AND SIGNALMAN; GUPIE OPERATOR Building ENGI0012-010 (CEMENT); STEAM CLEANER/PRESSURE WASHER, SWITCHMAN OR BRAKEMAN, BLADE OPERATOR; ROTARY DRILL TENDER (ROTARY AND CORE); STEAM CLEANER/PRESSURE WASHER; SWITCHMAN OR BRAKEMAN. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $55.94 | $34.15 | $90.09 | |
| POWER EQUIPMENT OPERATOR GROUP 2 CONCRETE MIXER OPERATOR Building ENGI0012-010 (SKID TYPE); CONVEYOR OPERATOR AND BELTMAN; FIREMAN; GENERATOR, PUMP OR COMPRESSOR OPERATOR (2 TO 5 UNITS INCLUSIVE, OVER 5 UNITS; UNITS, PORTABLE UNITS); GENERATOR, PUMP OR COMPRESSOR PLANT OPERATOR; HYDROSTATIC PUMP MOTORMAN (ROTARY AND CORE); PJU SIDE DUMP JACK; SCREENING AND CONVEYOR MACHINE OPERATOR (OR SIMILAR TYPE); SKIPLOADER ( WHEELTYPE FORD; FERGUSON; JEEP OR SIMILAR TYPE, 3/4 YARD OR LESS (WITHOUT DRAG-TYPE ATTACHMENTS); TEMPORARY HEATING PLANT OPERATOR. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $56.89 | $34.15 | $91.04 | |
| POWER EQUIPMENT OPERATOR GROUP 2 CONCRETE MIXER OPERATOR Building ENGI0012-023 (SKID TYPE); CONVEYOR AND BELTMAN; FIREMAN; GENERATOR PUMP OR COMPRESSOR OPERATOR; GENERATOR, PUMP OR COMPRESSOR PLANT OPERATOR; HYDROSTATIC PUMP MOTORMAN (ROTARY AND CORE); PJU SIDEDUMP JACK; SCREENING AND CONVEYOR MACHINE (SIMILAR TYPE); SKIPLOADER (WHEELTYPE, FORD, FERGUSON, JEEP OR SIMILAR TYPE, 3/4 YARDS OR LESS, WITHOUT DRAG-TYPE ATTACHMENTS); TEMPORARY HEATING PLANT OPERATOR; TRUCK CRANE OILER. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $54.74 | $34.00 | $88.74 | |
| POWER EQUIPMENT OPERATOR GROUP 3 A-FRAME OR WINCH TRUCK OPERATOR; BOBCAT OR SIMILAR TYPE Building ENGI0012-010 (SKID STEER); DERRICKMAN (ROTARY AND CORE); DINKY LOCOMOTIVE OR TUNNEL MOTOR OPERATOR; ELEVATOR HOIST OPERATOR; EQUIPMENT GREASER; FORD, FERGUSON OR SIMILAR TYPE (WITH DRAG-TYPE ATTACHMENTS); GLOBAL POSITION SYSTEMS CHAINMAN AND RODMAN; HYDRA-HAMMER (OR SIMILAR TYPE EQUIPMENT); MATERIAL HOIST/OUTSIDE MANLIFT OPERATOR; POWER CONCRETE CURING MACHINE; POWER CONCRETE SAW OPERATOR (OR SIMILAR TYPE); POWER-DRIVEN JUMBO FORM SETTER; RODMAN AND CHAINMAN; ROSS CARRIER OPERATOR; SELF-CLIMBING SCAFFOLD (OR SIMILAR TYPE); SELF-ROPELLED TAR PIPELINING MACHINE OPERATOR; STATIONARY PIPE WRAPPING AND CLEANING MACHINE OPERATOR; TOWBLADE OPERATOR. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $57.18 | $34.15 | $91.33 | |
| POWER EQUIPMENT OPERATOR GROUP 3 A-FRAME OR WINCH TRUCK OPERATOR; BOBCAT OR SIMILAR TYPE Building ENGI0012-023 (SKIDSTEER); DERRICKMAN (ROTARY AND CORE); DINKY LOCOMOTIVE OR TUNNEL MOTOR OPERATOR; ELEVATOR HOIST OPERATOR; EQUIPMENT GREASER; FORD, FERGUSON OR SIMILAR TYPE (WITH DRAG-TYPE ATTACHMENTS); HYDRA-HAMMER OR SIMILAR TYPE EQUIPMENT; MATERIAL HOIST/OUTSIDE MANLIFT OPERATOR; POWER CONCRETE CURING MACHINE; PPOWER CONCRETE SAW OPERATOR (OR SIMILAR TYPE); POWER DRIVEN JUMBO FORM SETTER OPERATOR; RODMAN & CHAINMAN; ROSS CARRIER OPERATOR; SELF-CLIMBING SCAFFOLD (OR SIMILAR TYPE); SELF-PROPELLED TAR PIPELINING MACHINE OPERATOR; STATIONARY PIPE WRAPPING AND CLEANING MACHINE OPERATOR; STEAM AND WATER PLANT OPERATOR; TOWBLADE OPERATOR. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $55.03 | $34.00 | $89.03 | |
| POWER EQUIPMENT OPERATOR GROUP 5 ASPHALT OR CONCRETE SPREADING MECHANICAL TAMPING OR FINISHING MACHINE OPERATOR- ROLLER Building ENGI0012-010 (ALL TYPES AND SIZES), SOIL, CEMENT, ASPHALT FINISH; ASPHALT PLANT ENGINEER; DECK ENGINE OPERATOR; GRADE CHECKER; PAVEMENT-BREAKER OPERATOR; PNEUMATIC HEADING SHIELD (TUNNEL); ROAD OIL MIXING MACHINE OPERATOR; FORKLIFT (UNDER FIVE TONS); RUBBER-TIRED, HEAVY DUTY EQUIPMENT OPERATOR (OSHKOSH; DW EUCLID, LETOURNEAU; LAPLANT-CHOATE, OR SIMILAR TYPE EQUIPMENT WITH ANY TYPE ATTACHMENTS); SKIDLOADER (WHEELTYPE, OVER 3/4 YDS., UP TO AND INCLUDING 1 1/2-YARDS); SLIP FORM PUMP OPERATOR (POWER-DRIVEN HYDRAULIC LIFTING DEVICE FOR CONCRETE FORMS); TRACTOR OPERATOR (DRAG-TYPE SHOVEL, BULLDOZER, TAMPER SCRAPER AND PUSH TRACTOR. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $59.77 | $34.15 | $93.92 | |
| POWER EQUIPMENT OPERATOR GROUP 5 ASPHALT OR CONCRETE SPREADING MECHANICAL TAMPING OR FINISHING MACHINE OPERATOR-ROLLER Building ENGI0012-023 (ALL TYPES AND SIZES), SOIL CEMENT, ASPHALT FINISH; ASPHALT PLANT ENGINEER; DECK ENGINE OPERATOOR; GRADE CHECKER; PAVEMENT-BREAKER OPERATOR; PNEUMATIC HEADING SHIELD- TUNNEL; ROAD OIL MIXING MACHINE OPEREATOR; FORKLIFT (UNDER (5) TONS); RUBBER TIRED, HEAVY DUTY EQUIPMENT OPERATOR; SKIPLOADER (WHEELTYPE, OVER 3-4 YARDS); SLIP FORM PUMP OPERATOR; TRACKOR OPERATOR, DRAG-TYPE SHOVEL, BULLDOZER, TAMPER, SCRAPER, AND PUSH TRACTOR. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $57.62 | $34.00 | $91.62 | |
| POWER EQUIPMENT OPERATOR GROUP 6 BATCH PLANT OPERATOR; BULK PLANT OPERATOR; CONCRETE MIXER OPERATOR Building ENGI0012-010 (PAVING); CONCRETE MOBILE MIXER OPERATOR; CONCRETE PUMP OR PUMPCRETE GUN OPERATOR; CRUSHING PLANTEENGINEER; DANDY DIGGER; DRILLER (ROTARY AND CORE); ELEVATING GRADE OPERATOR; FORKLIFT (OVER (5) TONS); GRADE-ALL OPERATOR; HEAVY DUTY WELDER; HIGHLINE CABLEWAY OPERATOR; HOIST OPERATOR (CHICAGO BOOM AND MINE); JUMBO PIPE CARRIER; KOLMAN BELT LOADER (AND SIMILAR TYPE); LIFT SLAB MACHINE OPERATOR; LOADER OPERATOR (ATHEY, EUCLID, HANCOCK, SIERRA OR SIMILAR TYPE); MACHINIST OPERATOR; MICRO TUNNEL SYSTEM (BELOW GROUND); MOTOR PATROL OPERATOR (ANY TYPE OR SIZE); OZZIE PADDER (OR SIMILAR TYPE); PNEUMATIC CONCRETE PLACING MACHINE OPERATOR ( HACKLEY- PRESSWELL OR SIMILAR TYPE); PNEUMATIC PIPE RAMMING TOOL (AND SIMILAR TYPES); ROTOMILL OPERATOR; SEWER PLANT OPERATOR; SHOVEL, BACKHOE, DRAGLINE, CLAMSHELL, DERRICK, DERRICK BARGE, CRANE PILEDRIVER AND MUCKING MACHINE OPERATOR; SHUTTLE BUGGY; SKIPLOADER (WHEELTYPE, OVER 1-1/2 YDS); SURFACE HEATER AND PLANER OPERATOR; TRACTOR LOADER OPERATOR (CRAWLER TYPE ALL TYPES AND SIZES); TRACTOR OPERATOR (WITH BOOM ATTACHMENTS); TRAVELING PIPE WRAPPING, CLEANING AND BENDING MACHINE OPERATOR; TRENCHING MACHINE OPERATOR (OVER 6 FT. DEPTH); TUNNEL BORING MACHINE OPERATOR; WATER PULL (COMPACTION); WATER WELL DRILLER. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $59.89 | $34.15 | $94.04 | |
| POWER EQUIPMENT OPERATOR GROUP 6 BATCH PLANT OPERATOR; BULK PLANT OPERATOR; CONCRETE MIXER OPERATOR Building ENGI0012-023 (PAVING); CONCRETE MOBILE MIXER OPERATOR; CONCRETE PUMP OR PUMPCRETE GUN OPERATOR; CRUSHING PLANT ENGINEER; DANDY DIGGER; DRILLER (ROTATRY/CORE); ELEVATING GRADE OPERATOR; FORKLIFT OPERATOR (OVER 5 TIMES); GRADE-ALL OPERATOR; HIGHLINE CABLEWAY OPERATOR; HOIST OPERATOR; JUMBO PIPE CARRIER; KOLMAN BELT LOADER, AND SIMILAR TYPE; LIFT SLAB MACHINE OPERATOR; LOADER OPERATOR; MACHINIST OPERATOR; MICRO TUNNEL SYSTEM (BELOW GROUND); MOTOR PATROL OPERATOR (ANY TYPE OR SIZE); OZZIE PADDER (OR SIMILAR TYPE); PNEUMATIC CONCRETE PLACING MACHINE OPERATOR (OR SIMILAR TYPE); PNEUMATIC PIPE RAMMING TOOL (AND SIMILAR TYPES); ROTOMIL OPERATOR; SEWER PLANT OPERATOR; SHOVEL, CRANE, BACKHOE, DRAGLINE, CLAMSHELL; DERRICK, DERRICK BARGE, PILE DRIVER, AND MUCKING MACHINE OPERATOR; SHUTTLE BUGGY; SKIPLOADER (WHEEL TYPE OVER 1 1/2 YARDS); SURFACE HEATER AND PLANER OPERATOR; TRACTOR LOADER OPERATOR, (CRAWLER TYPE- ALL TYPES AND SIZES); TRACTOR OPERATOR (WITH BOOM ATTACHMENTS); TRAVELING PIPE WRAPPING, CLEANING AND BENDING MACHINE OPERATOR; TRENCHING MACHINE OPERATOR (OVER 6-FT DEPTH); TUNNEL BORING MACHINE; WATER PULL (COMPACTION); WATER WELL DRILLER. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $57.74 | $34.00 | $91.74 | |
| POWER EQUIPMENT OPERATOR GROUP 7 BODY AND FENDER MECHANIC; GLOBAL POSITION SYSTEMS PARTY CHIEF; HEAVY DUTY WELDER AND REPAIRMAN; LIGHT DUTY REPAIRMAN Building ENGI0012-010 (HYBRID/ALL ELECTRIC); PARTY CHIEF. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $60.14 | $34.15 | $94.29 | |
| POWER EQUIPMENT OPERATOR GROUP 7 HEAVY DUTY REPAIRMAN; HEAVY DUTY WELDER; LIGHT DUTY REPAIRMAN Building ENGI0012-023 (HYBRID/ALL ELECTRIC). (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $57.99 | $34.00 | $91.99 | |
| POWER EQUIPMENT OPERATOR GROUP 8 COMBINATION HEAVY DUTY REPAIRMAN AND WELDER; EXCAVATOR OPERATOR Building ENGI0012-010 (TRACK/RUBBER-TIRED-WITH ALL ATTACHMENTS); POWER PRODUCTION MECHANIC; STEAM/HOT WATER BOILER PLANT OPERATOR. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $60.39 | $34.15 | $94.54 | |
| POWER EQUIPMENT OPERATOR GROUP 8 EXCAVATOR/TRACKHOE OR SIMILAR Building ENGI0012-023 (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $58.92 | $34.00 | $92.92 | |
| POWER EQUIPMENT OPERATOR GROUP 9 COMBINATION HEAVY DUTY REPAIRMAN AND WELDER; RUBBER-TIRED ANYTANDEM, MULTIPLE ENGINE EARTH-MOVING EQUIPMENT OPERATOR Building ENGI0012-023 (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $58.74 | $34.00 | $92.74 | |
| POWER EQUIPMENT OPERATOR: GROUP 10 CRANE OPERATOR ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - ZONE 4: $4.50 - OVER 60 MILES Building ENGI0012-010 | $64.48 | $34.15 | $98.63 | |
| REFRIGERATION MECHANIC Building PLUM0525-007 (ZONE PAY: MERCURY $7.50; FORWARD AREAS $11.25; NTTR $11.25) | $62.85 | $26.75 | $89.60 | |
| ROOFER Building ROOF0162-004 | $40.76 | $12.42 | $53.18 | |
| ROOFER Residential SUNV2014-028 | $18.50 | 0.00 | $18.50 | |
| ROOFER (INCLUDING WATERPROOFING) Building ROOF0162-002 Scope differs by code/WD | $37.76 | $12.42 | $50.18 | |
| ROOFER (INCLUDING WATERPROOFING) Building ROOF0162-003 Scope differs by code/WD | $39.74 | $12.42 | $52.16 | |
| SHEET METAL WORKER Building SHEE0088-003 (ZONE PAY: NNSS $5.50; NTTR $5.50) | $66.73 | $30.01 | $96.74 | |
| SHEET METAL WORKER Building SHEE0088-004 (Includes HVAC Duct Installation) | $59.85 | $32.76 | $92.61 | |
| SHEET METAL WORKER ZONE PAY ZONE 1: 0-30 MILES MILES $3.50; ZONE 4: OVER 100 MILES $5.00 Building SHEE0088-002 | $69.73 | $30.85 | $100.58 | |
| SOFT FLOOR LAYER Building PAIN1512-001 | $45.47 | $18.79 | $64.26 | |
| SPRINKLER FITTER Building SFNV0669-002 (Fire Sprinklers) | $48.97 | $31.40 | $80.37 | |
| SPRINKLER FITTER ZONE PAY ZONE A: LAS VEGAS - $0.00 ZONE B: NNSS - $4.50 ZONE C: NTTR - $4.50 Building SFNV0669-003 | $56.69 | $28.62 | $85.31 | |
| SPRINKLER FITTER ZONE PAY ZONE A: LAS VEGAS - $0.00; ZONE B: NNSS - $2.50; ZONE C: NTTR - $2.50 Building SFNV0669-004 | $66.22 | $20.34 | $86.56 | |
| TERRAZZO WORKER/SETTER Building BRNV0013-003 (ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | $52.44 | $18.79 | $71.23 | |
| TILE FINISHER Building BRNV0013-003 (ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | $37.07 | $14.74 | $51.81 | |
| TILE FINISHER Building BRNV0013-009 Scope differs by code/WD | $37.35 | $14.22 | $51.57 | |
| TILE FINISHER ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00 Building BRNV0013-004 | $35.64 | $14.20 | $49.84 | |
| TILE SETTER Building BRNV0013-003 (ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | $49.74 | $18.79 | $68.53 | |
| TILE SETTER Building BRNV0013-009 Scope differs by code/WD | $49.39 | $18.10 | $67.49 | |
| TILE SETTER Residential SUNV2014-028 | $29.22 | 0.00 | $29.22 | |
| TILE SETTER ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00 Building BRNV0013-004 | $47.70 | $18.23 | $65.93 | |
| TRAFFIC CONTROL PERSON Highway LABO0872-016 | $38.53 | $33.41 | $71.94 | |
| TRUCK DRIVER (Dump Truck) Building TEAM0631-001 | $37.21 | $33.41 | $70.62 | |
| TRUCK DRIVER, GROUP 1 LIGHT DUTY DRIVER, LIGHT VEHICLE DISPATCHER, TRUCK GREASER Building TEAM0631-007 (ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | $43.69 | $28.37 | $72.06 | |
| TRUCK DRIVER, GROUP 2 EQUIPMENT PARTS CLERK, FLEET OPERATIONS DISPATCHER, FORKLIFT DRIVER Building TEAM0631-007 (UNDER 15 TONS), HEAVY DUTY DRIVER, WAREHOUSEMAN. (ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | $43.86 | $28.37 | $72.23 | |
| TRUCK DRIVER, GROUP 3 EXTRA HEAVY DUTY DRIVER, FORKLIFT DRIVER Building TEAM0631-007 (OVER 15 TONS). (ZONE PAY ZONE 1: 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | $44.06 | $28.37 | $72.43 | |
| TRUCK DRIVER, GROUP 4 BOOTMAN, OFF-ROAD AND SPECIAL EQUIPMENT DRIVER Building TEAM0631-007 (ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | $44.78 | $28.37 | $73.15 | |
| TRUCK DRIVER, GROUP 4 EXTRA HEAVY DUTY DRIVER, FORKLIFT DRIVER Building TEAM0631-006 (OVER 15 TON) AND WAREHOUSEMAN. ZONE PAY ZONE 1: FREE ZONE $0.00 1-20 MILES; ZONE 2: $1.50 20-40 MILES; ZONE 3: $2.50 40-60 MILES; ZONE 4: $3.50 OVER 60 MILES | $51.69 | $28.10 | $79.79 | |
| TRUCK DRIVER, GROUP 5 TIREMAN Building TEAM0631-007 (ZONE PAY ZONE 1: 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | $44.26 | $28.37 | $72.63 | |
| TRUCK DRIVER: Dump Truck Heavy SUNV2014-024 | $22.43 | 0.00 | $22.43 | |
| TRUCK DRIVER: Dump Truck Drivers of trucks and trailers in combination six axles or more Highway TEAM0631-005 | $37.85 | $33.41 | $71.26 | |
| TRUCK DRIVER: Off Road Truck Highway TEAM0631-008 | $38.20 | $33.41 | $71.61 | |
| TRUCK DRIVER: Water Truck Highway SUNV2021-013 | $31.44 | $28.32 | $59.76 |
No trade rates match your search and filter selection.
Building, Heavy, Highway
Applies to
Clark, Lincoln, Nye
Building, Heavy, Highway
Applies to
Clark, Lincoln, Nye
Heavy
Building
Residential
Highway