NV20260001
rev 2Building, Heavy, Highway
Applies to
Clark, Lincoln, Nye
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Get an email when wage determinations covering Nye County, Nevada are modified.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| (4) Pipelayer Heavy LABO0169-027 | $34.45 | $16.30 | $50.75 | |
| (4) Pipelayer Building LABO0169-035 | $34.45 | $16.30 | $50.75 | |
| ASBESTOS / INSULATOR WORKER Building ASBE0135-001 (MECHANIC) ZONE: C - NTTR $8.00 | $69.35 | $19.88 | $89.23 | |
| ASBESTOS WORKER Residential ASBE0069-004 | $35.35 | $17.55 | $52.90 | |
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0016-011 | $52.36 | $26.62 | $78.98 | |
| ASBESTOS/INSULATOR WORKER: MECHANIC Building ASBE0135-004 (ZONE PAY (0-19 MILES, LAS VEGAS): $0.00 ZONE PAY (20-45 MILES): $4.00 ZONE PAY (46-75 MILES, MERCURY): $7.00 ZONE PAY (150+ MILES, NTTR): $8.00) | $67.19 | $19.88 | $87.07 | |
| BOILERMAKER (BLACKSMITH) Building BOIL0092-002 | $44.31 | $28.96 | $73.27 | |
| BOILERMAKER: BLACKSMITH ZONE PAY Building BOIL0092-006 (ZONE A - LAS VEGAS $0.00 ZONE B - MERCURY & FORWARD AREAS $2.00 ZONE C - NTTR $2.50) | $44.31 | $28.96 | $73.27 | |
| BRICKLAYER Building BRNV0013-003 (ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | $52.79 | $20.89 | $73.68 | |
| BRICKLAYER ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00 Building BRNV0013-004 | $50.90 | $19.93 | $70.83 | |
| CARPENTER Building CARP1977-007 (ZONE PAY: ZONE A: LAS VEGAS - FREE ZONE ZONE B: MERCURY, FORWARD & NTTR AREAS - $4.25) | $52.12 | $28.08 | $80.20 | |
| CARPENTER Heavy CARP1977-001 (Including Form Work) | $57.69 | $21.53 | $79.22 | |
| CARPENTER Residential SUNV1992-003 | $12.00 | 0.00 | $12.00 | |
| CARPENTER ZONE PAY: ZONE 1: FREE ZONE- $0.00; ZONE 2: 40-60 MILES -$2.50; ZONE 3: OVER 60 MILES-$4.25 Building CARP1977-006 | $50.77 | $28.28 | $79.05 | |
| CARPENTER, Includes Drywall Hanging, and Form Work Building SUNV2014-006 | $35.75 | $13.82 | $49.57 | |
| CARPENTER, LOCKSMITH ZONE PAY: ZONE 1: FREE ZONE- OVER 60 MILES-$4.25 Building CARP1977-006 | $55.85 | $28.28 | $84.13 | |
| CARPENTER, POWER SAW OPERATOR/PNEUMATIC NAILER ZONE PAY: ZONE 1: FREE ZONE- $0.00; ZONE 2: 40-60 MILES -$2.50; ZONE 3: OVER 60 MILES-$4.25 Building CARP1977-006 | $50.77 | $28.28 | $79.05 | |
| CAULKER Building BRNV0013-003 (ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | $52.79 | $20.89 | $73.68 | |
| CEMENT MASON Building PLAS0797-004 (ZONE PAY ZONE A - LAS VEGAS - NO PAY ZONE ZONE B - MERCURY AND FORWARD AREAS-$5.00 ZONE C - NTTR-$5.50) | $43.27 | $29.66 | $72.93 | |
| CEMENT MASON Building PLAS0797-004 (ZONE PAY ZONE A - LAS VEGAS - NO PAY ZONE ZONE B - MERCURY AND FORWARD AREAS-$5.00 ZONE C - NTTR-$5.50) | $43.27 | $29.66 | $72.93 | |
| CEMENT MASON ZONE PAY $4.00 Building PLAS0797-003 | $55.79 | $21.95 | $77.74 | |
| CEMENT MASON/CONCRETE FINISHER Heavy SUNV2014-031 | $40.26 | 0.00 | $40.26 | |
| CEMENT MASON/CONCRETE FINISHER Building SUNV2014-006 | $28.56 | $13.57 | $42.13 | |
| CEMENT MASON/CONCRETE FINISHER Residential SUNV1992-003 | $13.85 | 0.00 | $13.85 | |
| CEMENT MASON/CONCRETE FINISHER Highway SUNV2021-007 | $36.64 | $15.45 | $52.09 | |
| ELECTRICIAN Building ELEC0357-002 (CABLE SPLICER) ZONE PAY: ZONE 1: 0-25 MILES - $0.00 ZONE 2: 26-55 MILES - $2.50 ZONE 3: OVER 55 MILES - $3.50 | $65.84 | $33.38 | $99.22 | |
| ELECTRICIAN Building ELEC0357-002 (COMMUNICATION TECHNICIAN) ZONE PAY: ZONE 1: 0-25 MILES - $0.00 ZONE 2: 26-55 MILES - $2.50 ZONE 3: OVER 55 MILES - $3.50 | $65.84 | $33.38 | $99.22 | |
| ELECTRICIAN Building ELEC0357-005 (ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C: OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50) | $64.37 | $28.81 | $93.18 | |
| ELECTRICIAN Heavy SUNV2014-031 | $38.02 | $13.40 | $51.42 | |
| ELECTRICIAN Building ELEC0401-010 Scope differs by code/WD | $48.50 | $23.04 | $71.54 | |
| ELECTRICIAN (EXCLUDING ALARM INSTALLATION) Residential SUNV1992-003 | $10.91 | 0.00 | $10.91 | |
| ELECTRICIAN ZONE PAY: ZONE 1: 0-25 MILES - $0.00 ZONE 2: 26-55 MILES - $2.50 ZONE 3: OVER 55 MILES - $3.50 Building ELEC0357-002 | $65.84 | $33.38 | $99.22 | |
| ELECTRICIAN: CABLE SPLICER Building ELEC0357-005 (ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C: OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50) | $61.22 | $28.70 | $89.92 | |
| ELECTRICIAN: COMMUNICATION TECHNICIAN ONLY Building ELEC0357-005 (ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C: OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50) | $64.37 | $28.81 | $93.18 | |
| ELEVATOR MACHANIC Building ELEV0018-003 (ZONE PAY: ZONE A- LAS VEGAS. ZONE B-MERCURY $2.00. ZONE C- NTTR $2.50. FOOTNOTE: ADDITIONAL FRINGE BENEFITS TO BE PAID A: PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 0 MONTHS TO 5 YEARS OF SERVICE. B: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY.) | $69.43 | $38.44 | $107.87 | |
| GROUP 08 Heavy ENGI0003-016 | $49.61 | $30.38 | $79.99 | |
| Group 10 Heavy ENGI0012-019 | $64.02 | $36.40 | $100.42 | |
| GROUP 10 Heavy ENGI0003-016 | $50.28 | $30.38 | $80.66 | |
| GROUP 10A Heavy ENGI0003-016 | $42.72 | $24.50 | $67.22 | |
| GROUP 11 Heavy ENGI0003-016 | $50.71 | $30.38 | $81.09 | |
| GROUP 11A Heavy ENGI0003-016 | $52.35 | $30.38 | $82.73 | |
| Group 12 Heavy ENGI0012-019 | $64.19 | $36.40 | $100.59 | |
| Group 16 Heavy ENGI0012-019 | $64.52 | $36.40 | $100.92 | |
| GROUP 16 Heavy ENGI0012-014 | $67.41 | $36.40 | $103.81 | |
| GROUP 17 Heavy ENGI0012-014 | $67.91 | $36.40 | $104.31 | |
| GROUP 19 Heavy ENGI0012-014 | $69.94 | $36.40 | $106.34 | |
| GROUP 20 Heavy ENGI0012-014 | $70.55 | $36.40 | $106.95 | |
| GROUP 21 Heavy ENGI0012-014 | $71.16 | $36.40 | $107.56 | |
| GROUP 22 Heavy ENGI0012-014 | $71.92 | $36.40 | $108.32 | |
| GROUP 23 Heavy ENGI0012-014 | $72.38 | $36.40 | $108.78 | |
| Group 8 Heavy ENGI0012-019 | $64.29 | $36.40 | $100.69 | |
| HVAC MECHANIC: HVAC DUCT INSTALLATION ONLY Building SUNV2014-006 | $43.01 | $21.60 | $64.61 | |
| IRONWORKER (ZONE PAY- NNSS $5.50; NTTR $5.50) Building IRON0118-014 | $55.06 | $37.26 | $92.32 | |
| IRONWORKER ZONE PAY: $4.50 Building IRON0118-015 | $59.46 | $35.59 | $95.05 | |
| IRONWORKER, REINFORCING Heavy IRON0416-002 | $50.70 | $35.15 | $85.85 | |
| IRONWORKER, REINFORCING Highway IRON0118-016 | $50.70 | $35.15 | $85.85 | |
| IRONWORKER, STRUCTURAL Heavy IRON0433-002 | $46.20 | $34.30 | $80.50 | |
| IRONWORKER, STRUCTURAL Building IRON0118-008 | $50.70 | $35.15 | $85.85 | |
| KEEPER, PACKING ROD STEEL AND PANS; ZONE PAY: LABORER GROUP 1: BUILDING/OFFICE CLEANUP, FLAGPERSON; ZONE PAY: $3.75 FOOT NOTE: SAVINGS ACCOUNT OF $2.29 SHOULD BE ADDED TO THE BASE RATE Building LABO0872-008 | $46.40 | $29.35 | $75.75 | |
| KEEPER, PACKING ROD STEEL AND PANS; ZONE PAY: LABORER GROUP 2: LABORER - GENERAL Building LABO0872-008 (CONSTRUCTION CLEANUP, ETC.), DEMOLITION, DRY PACKING CONCRETE & FILLING OF FORM BOLT HOLES, FENCE BUILDER, TOOL ATTENDANT (JOBSITE ONLY), GAS & OIL PIPELINE, WINDOW CLEANERS, FINE GRADER, HIGHWAY & STREET PAVING, AIRPORT RUNWAYS & SIMILAR WORK, GUINEA CHASER, LANDSCAPE GARDENER, NURSERYMAN AND GROUNDS BE ADDED TO THE BASE RATE | $47.34 | $29.35 | $76.69 | |
| LABORER Heavy LABO0169-027 (1) Common or General | $33.95 | $16.30 | $50.25 | |
| LABORER Heavy LABO0872-013 (1) Landscape | $38.53 | $33.41 | $71.94 | |
| LABORER Building LABO0169-035 (1) Common or General | $33.95 | $16.30 | $50.25 | |
| LABORER (CONCRETE WORKER) Residential SUNV1992-003 | $11.67 | 0.00 | $11.67 | |
| LABORER (GENERAL) Residential SUNV1992-003 | $8.24 | 0.00 | $8.24 | |
| LABORER GROUP 3: ASBESTOS ABATEMENT, CHUCKTENDER Building LABO0872-008 (EXCEPT TUNNELS), GAS & OIL PIPELINE WRAPPER-POT TENDER AND FORM MAN, OPERATOR OF CEMENT GRINDING MACHINE, ROTO-SCRAPER, SANDBLASTER (POT TENDER), SCALER, SEPTIC TANK DIGGER & INSTALLER (LEADMAN),MAKING & CAULKING OF ALL NONMETALLIC PIPE JOINTS, TREE CLIMBER, FALLER, CHAIN SAW OPERATOR, PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHEDDERS, TANK SCALER AND CLEANER, CONCRETE SAWMAN, CONCRETE CORE CUTTER, MACHINE TOOL OPERATOR (OPERATORS AND TENDERS OF PNEUMATIC & ELECTRIC TOOLS, VIBRATING MACHINES AND SIMILAR MECHANICAL TOOLS NOT SEPARATELY CLASSIFIED HEREIN, INCLUDING HANDGUIDED DITCH WITCH AND HAND-TYPE ROLLER), ASPHALT RAKER, IRONER, SPREADER, SLURRY SEALER, BUGGYMOBILE MAN, CEMENT DUMPER, CONCRETE CURER, CESSPOOL DIGGER & INSTALLER, RIP RAP STONE PAVER; ZONE PAY: $3.75 FOOT NOTE: SAVINGS ACCOUNT OF $2.29 SHOULD BE ADDED TO THE BASE RATE | $47.55 | $29.35 | $76.90 | |
| LABORER GROUP 5: DRILLER, HEAD ROCK SLINGER, SANDBLASTER Building LABO0872-008 (NOZZLEMAN), STEEL HEADERBOARD MAN, POWDERMAN, CRIBBER OR SHORER; ZONE PAY: $3.75 FOOT NOTE: SAVINGS ACCOUNT OF $2.29 SHOULD BE ADDED TO THE BASE RATE | $48.05 | $29.35 | $77.40 | |
| LABORER GROUP 6: HERBICIDE, PESTICIDE, HANTAVIRUS SUPPRESSION; ZONE PAY: $3.75 FOOT NOTE: SAVINGS ACCOUNT OF $2.29 SHOULD BE ADDED TO THE BASE RATE Building LABO0872-008 | $48.35 | $29.35 | $77.70 | |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Highway LABO0169-014 | $34.45 | $16.30 | $50.75 | |
| LABORER: BULLGANG, MUCKER, TRACKMAN Building LABO0872-010 (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE) | $46.44 | $27.27 | $73.71 | |
| LABORER: Common or General Highway SUNV2021-007 | $35.83 | $22.78 | $58.61 | |
| LABORER: Concrete Saw Highway LABO0169-012 | $34.20 | $16.30 | $50.50 | |
| LABORER: Jackhammer Highway LABO0169-010 | $34.20 | $16.30 | $50.50 | |
| LABORER: Mason Tender - Cement/Concrete Highway LABO0169-010 | $34.20 | $16.30 | $50.50 | |
| LABORER: MINER-TUNNEL HARDROCK Building LABO0872-010 (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE) | $46.69 | $27.27 | $73.96 | |
| LABORER: Pipelayer Highway LABO0169-014 | $34.45 | $16.30 | $50.75 | |
| LABORER: PIPELAYER Residential SUNV1992-003 | $8.91 | 0.00 | $8.91 | |
| LABORER: SHAFT, RAISE, STOPE MINER Building LABO0872-010 (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE) | $47.69 | $27.27 | $74.96 | |
| LINE CONSTRUCTION Heavy ELEC1245-003 (Lineman) Lineman | $70.16 | $24.71 | $94.87 | |
| LINE CONSTRUCTION (Groundman) Heavy ELEC0396-002 | $38.74 | $19.36 | $58.10 | |
| LINE CONSTRUCTION, HEAVY EQUIPMENT OPERATOR ZONE PAY - NNSS $5.00 NTTR $5.00 Building ELEC0396-005 | $68.11 | $25.40 | $93.51 | |
| LINE CONSTRUCTION: GROUNDMAN Building ELEC0396-005 Scope differs by code/WD | $55.17 | $25.02 | $80.19 | |
| LINE CONSTRUCTION: GROUNDMAN Building ELEC0396-004 (ZONE PAY -NNSS $5.00; NTTR $5.00) | $49.66 | $31.50 | $81.16 | |
| LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATOR Building ELEC0396-004 (ZONE PAY -NNSS $5.00; NTTR $5.00) | $62.08 | $31.99 | $94.07 | |
| LINE CONSTRUCTION: LINEMAN Building ELEC0396-005 Scope differs by code/WD | $68.11 | $25.40 | $93.51 | |
| LINE CONSTRUCTION: LINEMAN Building ELEC0396-004 (ZONE PAY -NNSS $5.00; NTTR $5.00) | $62.08 | $31.99 | $94.07 | |
| MARBLE SETTER Building BRNV0013-003 (ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | $52.44 | $18.79 | $71.23 | |
| MARBLE SETTER ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00 Building BRNV0013-004 | $50.27 | $18.29 | $68.56 | |
| MILLWRIGHT Building CARP1607-006 (ZONE PAY: ZONE A: LAS VEGAS- FREE ZONE ZONE B: MERCURY, FORWARD & NTTR AREAS-$4.25) | $54.16 | $27.84 | $82.00 | |
| MILLWRIGHT ZONE PAY ZONE 1: FREE ZONE; ZONE 2: $2.50 - 40-60 MILES; ZONE 3: $4.25 - OVER 60 MILES Building CARP1607-005 | $50.77 | $28.28 | $79.05 | |
| OPERATOR: Asphalt/Concrete Laydown Highway ENGI0003-037 | $60.39 | $30.38 | $90.77 | |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUNV2014-006 | $45.02 | $10.71 | $55.73 | |
| OPERATOR: Backhoe/Excavator/Trackhoe Highway ENGI0012-025 | $63.90 | $36.40 | $100.30 | |
| OPERATOR: Bobcat/Skid Steer/Skid Loader Heavy SUNV2014-031 | $49.59 | $7.48 | $57.07 | |
| OPERATOR: Bobcat/Skid Steer/Skid Loader Highway SUNV2021-007 | $39.05 | $23.76 | $62.81 | |
| OPERATOR: Broom/Sweeper Highway SUNV2021-007 | $44.42 | $19.21 | $63.63 | |
| OPERATOR: Bulldozer Highway ENGI0003-042 | $60.39 | $30.38 | $90.77 | |
| OPERATOR: Drill Highway SUNV2021-007 | $46.92 | $25.02 | $71.94 | |
| OPERATOR: Grader/Blade Highway ENGI0003-045 | $50.47 | $30.38 | $80.85 | |
| OPERATOR: Loader Highway ENGI0012-033 | $63.90 | $36.40 | $100.30 | |
| OPERATOR: Mechanic Heavy SUNV2014-031 | $32.97 | $17.65 | $50.62 | |
| OPERATOR: Mechanic Highway ENGI0003-053 | $50.28 | $30.38 | $80.66 | |
| OPERATOR: Milling Machine Highway SUNV2021-007 | $55.93 | $15.47 | $71.40 | |
| OPERATOR: Oiler Highway ENGI0012-036 | $63.57 | $36.40 | $99.97 | |
| OPERATOR: OPERATOR: Grader/Blade Building SUNV2014-006 | $37.68 | $6.04 | $43.72 | |
| OPERATOR: OPERATOR: Loader Building SUNV2014-006 | $46.74 | $3.97 | $50.71 | |
| OPERATOR: Paver Highway SUNV2021-007 (Asphalt, Aggregate, and Concrete) | $40.99 | $26.97 | $67.96 | |
| OPERATOR: PLUMBER Building SUNV2014-006 | $29.19 | $16.12 | $45.31 | |
| OPERATOR: Roller Heavy SUNV2014-031 | $41.60 | $12.77 | $54.37 | |
| OPERATOR: Roller Highway ENGI0003-065 | $60.39 | $30.38 | $90.77 | |
| OPERATOR: Screed Highway SUNV2021-007 | $43.24 | $25.09 | $68.33 | |
| PAINTER (Brush and Roller) Building PAIN0159-004 | $50.62 | $24.20 | $74.82 | |
| PAINTER (ZONE PAY- NNSS $5.00; NTTR $5.00) Building PAIN0159-002 | $51.79 | $24.18 | $75.97 | |
| PAINTER Drywall Finishing/Taping Building PAIN0567-018 | $47.90 | $23.89 | $71.79 | |
| PAINTER, GROUP 1: BRUSH AND ROLLER ZONE PAY ZONE 1: 0-40 MILES - $0.00; ZONE 2: 41-60 MILES - $2.50; ZONE 3: OVER 60 MILES - $4.25 Building PAIN0159-001 | $52.75 | $28.70 | $81.45 | |
| PAINTER, GROUP 3: FLOOR COVERS, CARPET, LINOLEUM, RESILIENT TILE WORKERS, SPRAY PAINTER Building PAIN0159-001 (STRUCTURAL STEEL, OR WHEN WORKING FROM RIGGING, SWING STAG OR BOATSWAIN CHAIR), STEEPLE-JACK AND GLAZIER. ZONE PAY ZONE 1: 0-40 MILES - $0.00; ZONE 2: 41-60 MILES - $2.50; ZONE 3: OVER 60 MILES - $4.25 | $52.75 | $28.70 | $81.45 | |
| PAINTER, SPRAY AND PAPERHANGER SIGN Building PAIN0159-002 (ZONE PAY- NNSS $5.00; NTTR $5.00) | $52.14 | $24.18 | $76.32 | |
| PAINTER, TAPER, FLUSHER AND DETAILER Building PAIN0159-002 (ZONE PAY- NNSS $5.00; NTTR $5.00) | $52.14 | $24.18 | $76.32 | |
| PAINTER: FLOORCOVERER, CARPET, LINOLEUM AND TILE GLAZIER (ZONE PAY- NNSS $5.00; NTTR $5.00) Building PAIN0159-002 | $52.40 | $24.18 | $76.58 | |
| PIPEFITTER Building PLUM0525-004 (INCLUDING CFC HVACR TECHNICIAN, INSERT GAS WELDER, BOILER TECHNICIAN) ZONE PAY: ZONE 1: $0.00 - 0-20 MILES; ZONE 2: $3.75 - 20.01-45 MILES ; ZONE 3: $7.50 - 45.01-75 MILES; ZONE 4: $11.25 - 75.01 MILES AND OVER | $65.79 | $26.55 | $92.34 | |
| PIPEFITTER: INCLUDING INERT GAS WELDER Building PLUM0525-007 (ZONE PAY: MERCURY $7.50; FORWARD AREAS $11.25; NTTR $11.25) | $62.85 | $26.75 | $89.60 | |
| PLASTERER Building PLAS0797-004 (ZONE PAY ZONE A - LAS VEGAS - NO PAY ZONE ZONE B - MERCURY AND FORWARD AREAS-$5.00 ZONE C - NTTR-$5.50) | $42.03 | $28.05 | $70.08 | |
| PLASTERER Building PLAS0797-004 (ZONE PAY ZONE A - LAS VEGAS - NO PAY ZONE ZONE B - MERCURY AND FORWARD AREAS-$5.00 ZONE C - NTTR-$5.50) | $42.03 | $28.05 | $70.08 | |
| PLASTERER ZONE PAY $4.00 Building PLAS0797-003 | $55.79 | $21.95 | $77.74 | |
| PLUMBER Building PLUM0525-004 (INCLUDING LEAD BURNER) ZONE PAY: ZONE 1: MILES ; ZONE 3: $7.50 - 45.01-75 MILES; ZONE 4: $11.25 - 75.01 MILES AND OVER | $65.79 | $26.55 | $92.34 | |
| PLUMBER: INCLUDLING LEAD BURNER Building PLUM0525-007 (ZONE PAY: MERCURY $7.50; FORWARD AREAS $11.25; NTTR $11.25) | $62.85 | $26.75 | $89.60 | |
| PLUMBER/PIPEFITTER Residential PLUM0350-003 (CHURCHILL, DOUGLAS, ELKO, EUREKA, HUMBOLDT, LANDER, MINERAL, NYE (NORTH OF HIGHWAY #6), PERSHING & WHITE PINE COUNTIES) | $53.38 | $27.29 | $80.67 | |
| PLUMBER/PIPEFITTER Residential PLUM0525-005 (NYE COUNTY (SOUTH OF HIGHWAY #6)). ZONE PAY: ZONE 1 (0-20 MILES)-NO ZONE PAY ZONE 2 (20-45 MILES)-ADD $3.75/HOUR ZONE 3 (45-75 MILES)-ADD $7.50/HOUR ZONE 4 (OVER 75 MILES)-ADD $11.25/HOUR | $60.00 | $26.80 | $86.80 | |
| POWER EQUIPMENT OPERATOR Heavy ENGI0003-024 (09) Mechanic and Backhoe Loader Combo | $49.93 | $30.38 | $80.31 | |
| POWER EQUIPMENT OPERATOR Heavy ENGI0012-014 (Crane) GROUP 12 | $65.99 | $36.40 | $102.39 | |
| POWER EQUIPMENT OPERATOR Heavy ENGI0012-019 (Backhoe/Excavator/Trackhoe) Group 4 | $63.57 | $36.40 | $99.97 | |
| POWER EQUIPMENT OPERATOR (BACKHOE) Residential SUNV1992-003 | $10.50 | 0.00 | $10.50 | |
| POWER EQUIPMENT OPERATOR GROUP 07 Heavy ENGI0003-016 | $49.02 | $30.38 | $79.40 | |
| POWER EQUIPMENT OPERATOR GROUP 1 AIR COMPRESSOR, PUMP OR GENERATOR OPERATOR; ENGINEER- OILER AND SIGNALMAN; GUPIE OPERATOR Building ENGI0012-010 (CEMENT); STEAM CLEANER/PRESSURE WASHER, SWITCHMAN OR BRAKEMAN, BLADE OPERATOR; ROTARY DRILL TENDER (ROTARY AND CORE); STEAM CLEANER/PRESSURE WASHER; SWITCHMAN OR BRAKEMAN. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $55.94 | $34.15 | $90.09 | |
| POWER EQUIPMENT OPERATOR GROUP 2 CONCRETE MIXER OPERATOR Building ENGI0012-010 (SKID TYPE); CONVEYOR OPERATOR AND BELTMAN; FIREMAN; GENERATOR, PUMP OR COMPRESSOR OPERATOR (2 TO 5 UNITS INCLUSIVE, OVER 5 UNITS; UNITS, PORTABLE UNITS); GENERATOR, PUMP OR COMPRESSOR PLANT OPERATOR; HYDROSTATIC PUMP MOTORMAN (ROTARY AND CORE); PJU SIDE DUMP JACK; SCREENING AND CONVEYOR MACHINE OPERATOR (OR SIMILAR TYPE); SKIPLOADER ( WHEELTYPE FORD; FERGUSON; JEEP OR SIMILAR TYPE, 3/4 YARD OR LESS (WITHOUT DRAG-TYPE ATTACHMENTS); TEMPORARY HEATING PLANT OPERATOR. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $56.89 | $34.15 | $91.04 | |
| POWER EQUIPMENT OPERATOR GROUP 2 CONCRETE MIXER OPERATOR Building ENGI0012-023 (SKID TYPE); CONVEYOR AND BELTMAN; FIREMAN; GENERATOR PUMP OR COMPRESSOR OPERATOR; GENERATOR, PUMP OR COMPRESSOR PLANT OPERATOR; HYDROSTATIC PUMP MOTORMAN (ROTARY AND CORE); PJU SIDEDUMP JACK; SCREENING AND CONVEYOR MACHINE (SIMILAR TYPE); SKIPLOADER (WHEELTYPE, FORD, FERGUSON, JEEP OR SIMILAR TYPE, 3/4 YARDS OR LESS, WITHOUT DRAG-TYPE ATTACHMENTS); TEMPORARY HEATING PLANT OPERATOR; TRUCK CRANE OILER. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $54.74 | $34.00 | $88.74 | |
| POWER EQUIPMENT OPERATOR GROUP 3 A-FRAME OR WINCH TRUCK OPERATOR; BOBCAT OR SIMILAR TYPE Building ENGI0012-010 (SKID STEER); DERRICKMAN (ROTARY AND CORE); DINKY LOCOMOTIVE OR TUNNEL MOTOR OPERATOR; ELEVATOR HOIST OPERATOR; EQUIPMENT GREASER; FORD, FERGUSON OR SIMILAR TYPE (WITH DRAG-TYPE ATTACHMENTS); GLOBAL POSITION SYSTEMS CHAINMAN AND RODMAN; HYDRA-HAMMER (OR SIMILAR TYPE EQUIPMENT); MATERIAL HOIST/OUTSIDE MANLIFT OPERATOR; POWER CONCRETE CURING MACHINE; POWER CONCRETE SAW OPERATOR (OR SIMILAR TYPE); POWER-DRIVEN JUMBO FORM SETTER; RODMAN AND CHAINMAN; ROSS CARRIER OPERATOR; SELF-CLIMBING SCAFFOLD (OR SIMILAR TYPE); SELF-ROPELLED TAR PIPELINING MACHINE OPERATOR; STATIONARY PIPE WRAPPING AND CLEANING MACHINE OPERATOR; TOWBLADE OPERATOR. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $57.18 | $34.15 | $91.33 | |
| POWER EQUIPMENT OPERATOR GROUP 3 A-FRAME OR WINCH TRUCK OPERATOR; BOBCAT OR SIMILAR TYPE Building ENGI0012-023 (SKIDSTEER); DERRICKMAN (ROTARY AND CORE); DINKY LOCOMOTIVE OR TUNNEL MOTOR OPERATOR; ELEVATOR HOIST OPERATOR; EQUIPMENT GREASER; FORD, FERGUSON OR SIMILAR TYPE (WITH DRAG-TYPE ATTACHMENTS); HYDRA-HAMMER OR SIMILAR TYPE EQUIPMENT; MATERIAL HOIST/OUTSIDE MANLIFT OPERATOR; POWER CONCRETE CURING MACHINE; PPOWER CONCRETE SAW OPERATOR (OR SIMILAR TYPE); POWER DRIVEN JUMBO FORM SETTER OPERATOR; RODMAN & CHAINMAN; ROSS CARRIER OPERATOR; SELF-CLIMBING SCAFFOLD (OR SIMILAR TYPE); SELF-PROPELLED TAR PIPELINING MACHINE OPERATOR; STATIONARY PIPE WRAPPING AND CLEANING MACHINE OPERATOR; STEAM AND WATER PLANT OPERATOR; TOWBLADE OPERATOR. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $55.03 | $34.00 | $89.03 | |
| POWER EQUIPMENT OPERATOR GROUP 5 ASPHALT OR CONCRETE SPREADING MECHANICAL TAMPING OR FINISHING MACHINE OPERATOR- ROLLER Building ENGI0012-010 (ALL TYPES AND SIZES), SOIL, CEMENT, ASPHALT FINISH; ASPHALT PLANT ENGINEER; DECK ENGINE OPERATOR; GRADE CHECKER; PAVEMENT-BREAKER OPERATOR; PNEUMATIC HEADING SHIELD (TUNNEL); ROAD OIL MIXING MACHINE OPERATOR; FORKLIFT (UNDER FIVE TONS); RUBBER-TIRED, HEAVY DUTY EQUIPMENT OPERATOR (OSHKOSH; DW EUCLID, LETOURNEAU; LAPLANT-CHOATE, OR SIMILAR TYPE EQUIPMENT WITH ANY TYPE ATTACHMENTS); SKIDLOADER (WHEELTYPE, OVER 3/4 YDS., UP TO AND INCLUDING 1 1/2-YARDS); SLIP FORM PUMP OPERATOR (POWER-DRIVEN HYDRAULIC LIFTING DEVICE FOR CONCRETE FORMS); TRACTOR OPERATOR (DRAG-TYPE SHOVEL, BULLDOZER, TAMPER SCRAPER AND PUSH TRACTOR. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $59.77 | $34.15 | $93.92 | |
| POWER EQUIPMENT OPERATOR GROUP 5 ASPHALT OR CONCRETE SPREADING MECHANICAL TAMPING OR FINISHING MACHINE OPERATOR-ROLLER Building ENGI0012-023 (ALL TYPES AND SIZES), SOIL CEMENT, ASPHALT FINISH; ASPHALT PLANT ENGINEER; DECK ENGINE OPERATOOR; GRADE CHECKER; PAVEMENT-BREAKER OPERATOR; PNEUMATIC HEADING SHIELD- TUNNEL; ROAD OIL MIXING MACHINE OPEREATOR; FORKLIFT (UNDER (5) TONS); RUBBER TIRED, HEAVY DUTY EQUIPMENT OPERATOR; SKIPLOADER (WHEELTYPE, OVER 3-4 YARDS); SLIP FORM PUMP OPERATOR; TRACKOR OPERATOR, DRAG-TYPE SHOVEL, BULLDOZER, TAMPER, SCRAPER, AND PUSH TRACTOR. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $57.62 | $34.00 | $91.62 | |
| POWER EQUIPMENT OPERATOR GROUP 6 BATCH PLANT OPERATOR; BULK PLANT OPERATOR; CONCRETE MIXER OPERATOR Building ENGI0012-010 (PAVING); CONCRETE MOBILE MIXER OPERATOR; CONCRETE PUMP OR PUMPCRETE GUN OPERATOR; CRUSHING PLANTEENGINEER; DANDY DIGGER; DRILLER (ROTARY AND CORE); ELEVATING GRADE OPERATOR; FORKLIFT (OVER (5) TONS); GRADE-ALL OPERATOR; HEAVY DUTY WELDER; HIGHLINE CABLEWAY OPERATOR; HOIST OPERATOR (CHICAGO BOOM AND MINE); JUMBO PIPE CARRIER; KOLMAN BELT LOADER (AND SIMILAR TYPE); LIFT SLAB MACHINE OPERATOR; LOADER OPERATOR (ATHEY, EUCLID, HANCOCK, SIERRA OR SIMILAR TYPE); MACHINIST OPERATOR; MICRO TUNNEL SYSTEM (BELOW GROUND); MOTOR PATROL OPERATOR (ANY TYPE OR SIZE); OZZIE PADDER (OR SIMILAR TYPE); PNEUMATIC CONCRETE PLACING MACHINE OPERATOR ( HACKLEY- PRESSWELL OR SIMILAR TYPE); PNEUMATIC PIPE RAMMING TOOL (AND SIMILAR TYPES); ROTOMILL OPERATOR; SEWER PLANT OPERATOR; SHOVEL, BACKHOE, DRAGLINE, CLAMSHELL, DERRICK, DERRICK BARGE, CRANE PILEDRIVER AND MUCKING MACHINE OPERATOR; SHUTTLE BUGGY; SKIPLOADER (WHEELTYPE, OVER 1-1/2 YDS); SURFACE HEATER AND PLANER OPERATOR; TRACTOR LOADER OPERATOR (CRAWLER TYPE ALL TYPES AND SIZES); TRACTOR OPERATOR (WITH BOOM ATTACHMENTS); TRAVELING PIPE WRAPPING, CLEANING AND BENDING MACHINE OPERATOR; TRENCHING MACHINE OPERATOR (OVER 6 FT. DEPTH); TUNNEL BORING MACHINE OPERATOR; WATER PULL (COMPACTION); WATER WELL DRILLER. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $59.89 | $34.15 | $94.04 | |
| POWER EQUIPMENT OPERATOR GROUP 6 BATCH PLANT OPERATOR; BULK PLANT OPERATOR; CONCRETE MIXER OPERATOR Building ENGI0012-023 (PAVING); CONCRETE MOBILE MIXER OPERATOR; CONCRETE PUMP OR PUMPCRETE GUN OPERATOR; CRUSHING PLANT ENGINEER; DANDY DIGGER; DRILLER (ROTATRY/CORE); ELEVATING GRADE OPERATOR; FORKLIFT OPERATOR (OVER 5 TIMES); GRADE-ALL OPERATOR; HIGHLINE CABLEWAY OPERATOR; HOIST OPERATOR; JUMBO PIPE CARRIER; KOLMAN BELT LOADER, AND SIMILAR TYPE; LIFT SLAB MACHINE OPERATOR; LOADER OPERATOR; MACHINIST OPERATOR; MICRO TUNNEL SYSTEM (BELOW GROUND); MOTOR PATROL OPERATOR (ANY TYPE OR SIZE); OZZIE PADDER (OR SIMILAR TYPE); PNEUMATIC CONCRETE PLACING MACHINE OPERATOR (OR SIMILAR TYPE); PNEUMATIC PIPE RAMMING TOOL (AND SIMILAR TYPES); ROTOMIL OPERATOR; SEWER PLANT OPERATOR; SHOVEL, CRANE, BACKHOE, DRAGLINE, CLAMSHELL; DERRICK, DERRICK BARGE, PILE DRIVER, AND MUCKING MACHINE OPERATOR; SHUTTLE BUGGY; SKIPLOADER (WHEEL TYPE OVER 1 1/2 YARDS); SURFACE HEATER AND PLANER OPERATOR; TRACTOR LOADER OPERATOR, (CRAWLER TYPE- ALL TYPES AND SIZES); TRACTOR OPERATOR (WITH BOOM ATTACHMENTS); TRAVELING PIPE WRAPPING, CLEANING AND BENDING MACHINE OPERATOR; TRENCHING MACHINE OPERATOR (OVER 6-FT DEPTH); TUNNEL BORING MACHINE; WATER PULL (COMPACTION); WATER WELL DRILLER. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $57.74 | $34.00 | $91.74 | |
| POWER EQUIPMENT OPERATOR GROUP 7 BODY AND FENDER MECHANIC; GLOBAL POSITION SYSTEMS PARTY CHIEF; HEAVY DUTY WELDER AND REPAIRMAN; LIGHT DUTY REPAIRMAN Building ENGI0012-010 (HYBRID/ALL ELECTRIC); PARTY CHIEF. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $60.14 | $34.15 | $94.29 | |
| POWER EQUIPMENT OPERATOR GROUP 7 HEAVY DUTY REPAIRMAN; HEAVY DUTY WELDER; LIGHT DUTY REPAIRMAN Building ENGI0012-023 (HYBRID/ALL ELECTRIC). (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $57.99 | $34.00 | $91.99 | |
| POWER EQUIPMENT OPERATOR GROUP 8 COMBINATION HEAVY DUTY REPAIRMAN AND WELDER; EXCAVATOR OPERATOR Building ENGI0012-010 (TRACK/RUBBER-TIRED-WITH ALL ATTACHMENTS); POWER PRODUCTION MECHANIC; STEAM/HOT WATER BOILER PLANT OPERATOR. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $60.39 | $34.15 | $94.54 | |
| POWER EQUIPMENT OPERATOR GROUP 8 EXCAVATOR/TRACKHOE OR SIMILAR Building ENGI0012-023 (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $58.92 | $34.00 | $92.92 | |
| POWER EQUIPMENT OPERATOR GROUP 9 COMBINATION HEAVY DUTY REPAIRMAN AND WELDER; RUBBER-TIRED ANYTANDEM, MULTIPLE ENGINE EARTH-MOVING EQUIPMENT OPERATOR Building ENGI0012-023 (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $58.74 | $34.00 | $92.74 | |
| POWER EQUIPMENT OPERATOR: GROUP 10 CRANE OPERATOR ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - ZONE 4: $4.50 - OVER 60 MILES Building ENGI0012-010 | $64.48 | $34.15 | $98.63 | |
| REFRIGERATION MECHANIC Building PLUM0525-007 (ZONE PAY: MERCURY $7.50; FORWARD AREAS $11.25; NTTR $11.25) | $62.85 | $26.75 | $89.60 | |
| ROOFER (INCLUDING WATERPROOFING) Building ROOF0162-002 Scope differs by code/WD | $37.76 | $12.42 | $50.18 | |
| ROOFER (INCLUDING WATERPROOFING) Building ROOF0162-003 Scope differs by code/WD | $39.74 | $12.42 | $52.16 | |
| SHEET METAL WORKER Building SHEE0088-003 (ZONE PAY: NNSS $5.50; NTTR $5.50) | $66.73 | $30.01 | $96.74 | |
| SHEET METAL WORKER Building SHEE0026-008 (HVAC Unit Installation Only) | $47.51 | $29.38 | $76.89 | |
| SHEET METAL WORKER ZONE PAY ZONE 1: 0-30 MILES MILES $3.50; ZONE 4: OVER 100 MILES $5.00 Building SHEE0088-002 | $69.73 | $30.85 | $100.58 | |
| Spray Building PAIN0567-018 | $33.10 | $14.34 | $47.44 | |
| SPRINKLER FITTER ZONE PAY ZONE A: LAS VEGAS - $0.00 ZONE B: NNSS - $4.50 ZONE C: NTTR - $4.50 Building SFNV0669-003 | $56.69 | $28.62 | $85.31 | |
| SPRINKLER FITTER ZONE PAY ZONE A: LAS VEGAS - $0.00; ZONE B: NNSS - $2.50; ZONE C: NTTR - $2.50 Building SFNV0669-004 | $66.22 | $20.34 | $86.56 | |
| TERRAZZO WORKER/SETTER Building BRNV0013-003 (ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | $52.44 | $18.79 | $71.23 | |
| TILE FINISHER Building BRNV0013-003 (ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | $37.07 | $14.74 | $51.81 | |
| TILE FINISHER ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00 Building BRNV0013-004 | $35.64 | $14.20 | $49.84 | |
| TILE SETTER Building BRNV0013-003 (ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | $49.74 | $18.79 | $68.53 | |
| TILE SETTER ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00 Building BRNV0013-004 | $47.70 | $18.23 | $65.93 | |
| TRAFFIC CONTROL: Flagger Highway LABO0169-016 | $32.08 | $16.30 | $48.38 | |
| TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper Highway LABO0169-013 | $36.70 | $16.30 | $53.00 | |
| TRUCK DRIVER, GROUP 1 LIGHT DUTY DRIVER, LIGHT VEHICLE DISPATCHER, TRUCK GREASER Building TEAM0631-007 (ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | $43.69 | $28.37 | $72.06 | |
| TRUCK DRIVER, GROUP 2 EQUIPMENT PARTS CLERK, FLEET OPERATIONS DISPATCHER, FORKLIFT DRIVER Building TEAM0631-007 (UNDER 15 TONS), HEAVY DUTY DRIVER, WAREHOUSEMAN. (ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | $43.86 | $28.37 | $72.23 | |
| TRUCK DRIVER, GROUP 3 EXTRA HEAVY DUTY DRIVER, FORKLIFT DRIVER Building TEAM0631-007 (OVER 15 TONS). (ZONE PAY ZONE 1: 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | $44.06 | $28.37 | $72.43 | |
| TRUCK DRIVER, GROUP 4 BOOTMAN, OFF-ROAD AND SPECIAL EQUIPMENT DRIVER Building TEAM0631-007 (ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | $44.78 | $28.37 | $73.15 | |
| TRUCK DRIVER, GROUP 4 EXTRA HEAVY DUTY DRIVER, FORKLIFT DRIVER Building TEAM0631-006 (OVER 15 TON) AND WAREHOUSEMAN. ZONE PAY ZONE 1: FREE ZONE $0.00 1-20 MILES; ZONE 2: $1.50 20-40 MILES; ZONE 3: $2.50 40-60 MILES; ZONE 4: $3.50 OVER 60 MILES | $51.69 | $28.10 | $79.79 | |
| TRUCK DRIVER, GROUP 5 TIREMAN Building TEAM0631-007 (ZONE PAY ZONE 1: 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | $44.26 | $28.37 | $72.63 | |
| TRUCK DRIVER: Dump Truck Heavy SUNV2014-031 | $31.77 | $4.16 | $35.93 | |
| TRUCK DRIVER: Dump Truck Highway SUNV2021-007 | $55.30 | $6.86 | $62.16 | |
| TRUCK DRIVER: Water Truck Heavy SUNV2014-031 | $16.64 | $4.16 | $20.80 | |
| TRUCK DRIVER: Water Truck Highway SUNV2021-007 | $42.48 | 0.00 | $42.48 |
No trade rates match your search and filter selection.
Building, Heavy, Highway
Applies to
Clark, Lincoln, Nye
Building, Heavy, Highway
Applies to
Clark, Lincoln, Nye
Heavy
Building
Residential
Applies to
Churchill, Douglas, Elko, Esmeralda, Eureka, Humboldt, Lander, Lincoln, Lyon, Mineral +3 more
Highway