OK20260011
rev 0Residential
0 trades
Applies to
Greer, Harmon, Jackson, Kiowa, Tillman in Oklahoma.
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| Asphalt Raker and Shoveler Highway SUOK2011-005 | $10.49 | $0.00 | $10.49 |
| BRICKLAYER Residential SUOK1997-010 | $8.50 | $0.00 | $8.50 |
| CARPENTER Residential SUOK1997-010 | $7.25 | $0.00 | $7.25 |
| CARPENTER Highway SUOK2011-005 (Excludes Form Work) Caddo County | $12.18 | $0.00 | $12.18 |
| CARPENTER (Form Work Only) Heavy SUOK2012-014 | $14.00 | 0.00 | $14.00 |
| CEMENT MASON/CONCRETE FINISHER Residential SUOK1997-010 | $7.25 | $0.00 | $7.25 |
| ELECTRICIAN Residential SUOK1997-010 | $7.25 | $0.00 | $7.25 |
| ELECTRICIAN Heavy ELEC1002-005 | $51.00 | $8.75 | $59.75 |
| FLOOR LAYER: Carpet Residential SUOK1997-010 | $7.50 | $0.00 | $7.50 |
| FORM WORKER Remaining Counties Highway SUOK2011-005 | $11.46 | $0.00 | $11.46 |
| GUARDRAIL INSTALLER Highway SUOK2011-005 (Includes Guardrail/Post Driver Work) | $9.70 | $0.00 | $9.70 |
| Insulation Installer Residential SUOK1997-010 | $7.25 | $0.00 | $7.25 |
| IRONWORKER, REINFORCING Highway SUOK2011-005 | $13.63 | $0.00 | $13.63 |
| IRONWORKER, STRUCTURAL Heavy IRON0048-006 | $32.10 | $17.38 | $49.48 |
| LABORER Residential SUOK1997-010 | $7.25 | $0.00 | $7.25 |
| LABORER Air/Power Tool Operator Highway SUOK2011-005 (Includes Handheld Concrete Saws and Chipping Guns) | $12.79 | $0.00 | $12.79 |
| LABORER: Common or General Heavy SUOK2012-014 | $10.00 | 0.00 | $10.00 |
| LABORER: Pipelayer Heavy SUOK2012-014 | $11.00 | $0.30 | $11.30 |
| OPERATOR: Backhoe Heavy SUOK2012-014 | $18.00 | $0.97 | $18.97 |
| OPERATOR: Scraper Heavy SUOK2012-014 | $14.00 | 0.00 | $14.00 |
| Painters: BRUSH Residential SUOK1997-010 | $7.25 | $0.00 | $7.25 |
| Painters: PLUMBER Residential SUOK1997-010 | $7.25 | $0.00 | $7.25 |
| Painters: ROOFER Residential SUOK1997-010 | $7.25 | $0.00 | $7.25 |
| Painters: Sheet metal worker Residential SUOK1997-010 | $7.85 | $0.00 | $7.85 |
| Painters: SPRAY Residential SUOK1997-010 | $7.25 | $0.00 | $7.25 |
| Painters: TILE SETTER Residential SUOK1997-010 | $7.25 | $0.00 | $7.25 |
| Painters: TRUCK DRIVER Residential SUOK1997-010 | $7.25 | $0.00 | $7.25 |
| Pipelayer Highway SUOK2011-005 | $11.83 | $0.00 | $11.83 |
| POWER EQUIPMENT OPERATOR: Asphalt Paver Screed Highway SUOK2011-005 | $13.19 | $0.00 | $13.19 |
| POWER EQUIPMENT OPERATOR: Asphalt Paving Machine Highway SUOK2011-005 | $12.32 | $0.00 | $12.32 |
| POWER EQUIPMENT OPERATOR: Asphalt Plant Highway SUOK2011-005 | $14.70 | $0.00 | $14.70 |
| POWER EQUIPMENT OPERATOR: Bobcat/Skid Loader Highway SUOK2011-005 | $12.06 | $0.00 | $12.06 |
| POWER EQUIPMENT OPERATOR: Broom Highway SUOK2011-005 | $11.02 | $0.00 | $11.02 |
| POWER EQUIPMENT OPERATOR: Bulldozer Highway SUOK2011-005 | $13.69 | $0.00 | $13.69 |
| POWER EQUIPMENT OPERATOR: Concrete Paving Machine Highway SUOK2011-005 | $14.42 | $0.00 | $14.42 |
| POWER EQUIPMENT OPERATOR: Concrete Saw Highway SUOK2011-005 | $12.46 | $0.00 | $12.46 |
| POWER EQUIPMENT OPERATOR: Crane Highway SUOK2011-005 | $16.61 | $0.00 | $16.61 |
| POWER EQUIPMENT OPERATOR: Distributor Truck Highway SUOK2011-005 | $12.24 | $0.00 | $12.24 |
| POWER EQUIPMENT OPERATOR: Dump Truck Highway SUOK2011-005 | $12.84 | $0.00 | $12.84 |
| POWER EQUIPMENT OPERATOR: Excavator Highway SUOK2011-005 | $15.45 | $0.00 | $15.45 |
| POWER EQUIPMENT OPERATOR: Flatbed Truck Highway SUOK2011-005 | $15.30 | $0.00 | $15.30 |
| POWER EQUIPMENT OPERATOR: Group 1 Heavy ENGI0627-016 | $38.09 | $19.05 | $57.14 |
| POWER EQUIPMENT OPERATOR: Group 2 Heavy ENGI0627-016 | $36.14 | $19.05 | $55.19 |
| POWER EQUIPMENT OPERATOR: Group 3 Heavy ENGI0627-016 | $35.40 | $19.05 | $54.45 |
| POWER EQUIPMENT OPERATOR: Group 4 Heavy ENGI0627-016 | $34.07 | $19.05 | $53.12 |
| POWER EQUIPMENT OPERATOR: Group 5 Heavy ENGI0627-016 | $32.71 | $19.05 | $51.76 |
| POWER EQUIPMENT OPERATOR: Group 6 Heavy ENGI0627-016 | $30.87 | $19.05 | $49.92 |
| POWER EQUIPMENT OPERATOR: Group 8 Heavy ENGI0627-016 | $28.77 | $19.05 | $47.82 |
| POWER EQUIPMENT OPERATOR: Group 9 Heavy ENGI0627-016 | $28.25 | $19.05 | $47.30 |
| POWER EQUIPMENT OPERATOR: Group10 Heavy ENGI0627-016 | $27.25 | $19.05 | $46.30 |
| POWER EQUIPMENT OPERATOR: Loader (Front End) Highway SUOK2011-005 | $12.21 | $0.00 | $12.21 |
| POWER EQUIPMENT OPERATOR: Lowboy/Float Highway SUOK2011-005 | $16.02 | $0.00 | $16.02 |
| POWER EQUIPMENT OPERATOR: Mechanic Highway SUOK2011-005 | $16.89 | $0.00 | $16.89 |
| POWER EQUIPMENT OPERATOR: Milling Machine Highway SUOK2011-005 | $11.81 | $0.00 | $11.81 |
| POWER EQUIPMENT OPERATOR: Mixer Highway SUOK2011-005 | $14.56 | $0.00 | $14.56 |
| POWER EQUIPMENT OPERATOR: Off the Road Truck Highway SUOK2011-005 | $11.84 | $0.00 | $11.84 |
| POWER EQUIPMENT OPERATOR: Oiler Highway SUOK2011-005 | $13.84 | $0.00 | $13.84 |
| POWER EQUIPMENT OPERATOR: Remaining Counties Highway SUOK2011-005 Scope differs by code/WD | $13.71 | $0.00 | $13.71 |
| POWER EQUIPMENT OPERATOR: Remaining Counties Highway SUOK2011-005 Scope differs by code/WD | $13.30 | $0.00 | $13.30 |
| POWER EQUIPMENT OPERATOR: Remaining Counties Highway SUOK2011-005 Scope differs by code/WD | $12.61 | $0.00 | $12.61 |
| POWER EQUIPMENT OPERATOR: Roller Highway SUOK2011-005 (Asphalt) Caddo County | $12.73 | $0.00 | $12.73 |
| POWER EQUIPMENT OPERATOR: Roller (Dirt Compaction) Highway SUOK2011-005 | $10.22 | $0.00 | $10.22 |
| POWER EQUIPMENT OPERATOR: Rotomill Highway SUOK2011-005 | $17.33 | $0.00 | $17.33 |
| POWER EQUIPMENT OPERATOR: Scraper Highway SUOK2011-005 | $12.82 | $0.00 | $12.82 |
| POWER EQUIPMENT OPERATOR: Single Axle Truck Highway SUOK2011-005 (Includes Pilot Car) | $12.30 | $0.00 | $12.30 |
| POWER EQUIPMENT OPERATOR: Straight Truck Highway SUOK2011-005 | $15.92 | $0.00 | $15.92 |
| POWER EQUIPMENT OPERATOR: Striping Machine Highway SUOK2011-005 | $12.11 | $0.00 | $12.11 |
| POWER EQUIPMENT OPERATOR: Tandem Axle/Semi Trailer Highway SUOK2011-005 | $13.53 | $0.00 | $13.53 |
| POWER EQUIPMENT OPERATOR: Tractor/Box Blade Highway SUOK2011-005 | $9.79 | $0.00 | $9.79 |
| POWER EQUIPMENT OPERATOR: Transfer Material Machine Highway SUOK2011-005 | $12.38 | $0.75 | $13.13 |
| POWER EQUIPMENT OPERATOR: Trencher Highway SUOK2011-005 | $14.66 | $0.00 | $14.66 |
| POWER EQUIPMENT OPERATOR: TRUCK DRIVER Concrete Truck Highway SUOK2011-005 | $14.22 | $0.00 | $14.22 |
| POWER EQUIPMENT OPERATOR: Water Truck Highway SUOK2011-005 | $12.00 | $0.00 | $12.00 |
| Remaining Counties Highway SUOK2011-005 Scope differs by code/WD | $12.57 | $0.00 | $12.57 |
| Remaining Counties Highway SUOK2011-005 Scope differs by code/WD | $12.53 | $0.00 | $12.53 |
| Remaining Counties Highway SUOK2011-005 Scope differs by code/WD | $10.29 | $0.00 | $10.29 |
| Traffic Control Highway SUOK2011-005 (Includes Flagger, Setting Up and Moving Cones/Barrels) | $10.39 | $0.00 | $10.39 |
| TRUCK DRIVER Heavy TEAM0516-006 (3) Flatbed Truck | $30.85 | $16.65 | $47.50 |
| Vibrating Plate Highway SUOK2011-005 | $12.70 | $0.00 | $12.70 |
No trade rates match your search and filter selection.
Residential
Applies to
Greer, Harmon, Jackson, Kiowa, Tillman in Oklahoma.
Highway
Applies to
Beckham, Caddo, Cotton, Custer, Greer, Harmon, Jackson, Jefferson, Kiowa, Roger Mills +3 more
Heavy
Applies to
Beckham, Caddo, Cotton, Custer, Greer, Harmon, Jackson, Jefferson, Kiowa, Roger Mills +3 more