Trade & Classification Rate Fringe Total
Asphalt Raker and Shoveler Highway
SUOK2011-006
$12.41 $0.00 $12.41
CARPENTER Highway
SUOK2011-006 (Excludes Form Work and Form Setting) Adair County
$13.70 $0.00 $13.70
CARPENTER (Form Work Only) Heavy
SUOK2012-011
$14.00 0.00 $14.00
ELECTRICIAN Heavy
ELEC1002-005
$51.00 $8.75 $59.75
FORM WORKER/FORM SETTER Highway
SUOK2011-006 (Including Curb Line Setting)
$12.30 $0.00 $12.30
GUARDRAIL INSTALLER Highway
SUOK2011-006 (Includes Guardrail/Post Driver Work)
$9.70 $0.00 $9.70
IRONWORKER, REINFORCING Highway
SUOK2011-006
$13.63 $0.00 $13.63
IRONWORKER, STRUCTURAL Heavy
IRON0584-020
$30.35 $16.83 $47.18
LABORER Air/Power Tool Operator Highway
SUOK2011-006 (Includes Handheld Concrete Saws and Chipping Guns)
$12.79 $0.00 $12.79
LABORER: Common or General Heavy
SUOK2012-011
$12.41 0.00 $12.41
LABORER: Pipelayer Heavy
SUOK2012-011
$13.29 0.00 $13.29
OPERATOR: Scraper Heavy
SUOK2012-011
$14.00 0.00 $14.00
Pipelayer Highway
SUOK2011-006
$11.13 $0.00 $11.13
POWER EQUIPMENT OPERATOR: Asphalt Paver Screed Highway
SUOK2011-006
$14.77 $0.00 $14.77
POWER EQUIPMENT OPERATOR: Asphalt Paving Machine Highway
SUOK2011-006
$14.84 $0.00 $14.84
POWER EQUIPMENT OPERATOR: Asphalt Plant Highway
SUOK2011-006
$14.70 $0.00 $14.70
POWER EQUIPMENT OPERATOR: Bobcat/Skid Loader Highway
SUOK2011-006
$12.56 $0.00 $12.56
POWER EQUIPMENT OPERATOR: Broom Highway
SUOK2011-006
$11.02 $0.00 $11.02
POWER EQUIPMENT OPERATOR: Concrete Paving Machine Highway
SUOK2011-006
$14.42 $0.00 $14.42
POWER EQUIPMENT OPERATOR: Concrete Saw Highway
SUOK2011-006
$14.65 $0.00 $14.65
POWER EQUIPMENT OPERATOR: Crane Highway
SUOK2011-006
$18.63 $0.00 $18.63
POWER EQUIPMENT OPERATOR: Distributor Truck Highway
SUOK2011-006
$13.34 $0.00 $13.34
POWER EQUIPMENT OPERATOR: Excavator Highway
SUOK2011-006
$14.75 $0.00 $14.75
POWER EQUIPMENT OPERATOR: Flatbed Truck Highway
SUOK2011-006
$16.18 $0.00 $16.18
POWER EQUIPMENT OPERATOR: Grader/Blade Highway
SUOK2011-006
$16.47 $0.00 $16.47
POWER EQUIPMENT OPERATOR: Group 1 Heavy
ENGI0627-017
$38.09 $19.05 $57.14
POWER EQUIPMENT OPERATOR: Group 2 Heavy
ENGI0627-017
$36.14 $19.05 $55.19
POWER EQUIPMENT OPERATOR: Group 3 Heavy
ENGI0627-017
$35.40 $19.05 $54.45
POWER EQUIPMENT OPERATOR: Group 4 Heavy
ENGI0627-017
$34.07 $19.05 $53.12
POWER EQUIPMENT OPERATOR: Group 5 Heavy
ENGI0627-017
$32.71 $19.05 $51.76
POWER EQUIPMENT OPERATOR: Group 6 Heavy
ENGI0627-017
$30.87 $19.05 $49.92
POWER EQUIPMENT OPERATOR: Group 8 Heavy
ENGI0627-017
$28.77 $19.05 $47.82
POWER EQUIPMENT OPERATOR: Group 9 Heavy
ENGI0627-017
$28.25 $19.05 $47.30
POWER EQUIPMENT OPERATOR: Group10 Heavy
ENGI0627-017
$27.25 $19.05 $46.30
POWER EQUIPMENT OPERATOR: Loader Highway
SUOK2011-006 (Front End) Muskogee County
$13.83 $0.00 $13.83
POWER EQUIPMENT OPERATOR: Lowboy/Float Highway
SUOK2011-006
$15.20 $0.69 $15.89
POWER EQUIPMENT OPERATOR: Milling Machine Highway
SUOK2011-006
$14.87 $0.00 $14.87
POWER EQUIPMENT OPERATOR: Mixer Highway
SUOK2011-006
$14.56 $0.00 $14.56
POWER EQUIPMENT OPERATOR: Off the Road Truck Highway
SUOK2011-006
$13.64 $0.00 $13.64
POWER EQUIPMENT OPERATOR: Remaining Counties Highway
SUOK2011-006 Scope differs by code/WD
$16.13 $0.00 $16.13
POWER EQUIPMENT OPERATOR: Remaining Counties Highway
SUOK2011-006 Scope differs by code/WD
$14.61 $0.00 $14.61
POWER EQUIPMENT OPERATOR: Remaining Counties Highway
SUOK2011-006 Scope differs by code/WD
$13.66 $0.00 $13.66
POWER EQUIPMENT OPERATOR: Remaining Counties Highway
SUOK2011-006 Scope differs by code/WD
$18.77 $0.00 $18.77
POWER EQUIPMENT OPERATOR: Remaining Counties Highway
SUOK2011-006 Scope differs by code/WD
$14.59 $0.00 $14.59
POWER EQUIPMENT OPERATOR: Remaining Counties Highway
SUOK2011-006 Scope differs by code/WD
$13.48 $0.00 $13.48
POWER EQUIPMENT OPERATOR: Remaining Counties Highway
SUOK2011-006 Scope differs by code/WD
$13.91 $0.00 $13.91
POWER EQUIPMENT OPERATOR: Remaining Counties Highway
SUOK2011-006 Scope differs by code/WD
$15.75 $0.00 $15.75
POWER EQUIPMENT OPERATOR: Roller Highway
SUOK2011-006 (Asphalt) Adair County
$13.12 $0.00 $13.12
POWER EQUIPMENT OPERATOR: Roller (Dirt Compaction) Highway
SUOK2011-006
$12.44 $0.00 $12.44
POWER EQUIPMENT OPERATOR: Rotomill Highway
SUOK2011-006
$17.33 $0.00 $17.33
POWER EQUIPMENT OPERATOR: Scraper Highway
SUOK2011-006
$14.13 $0.00 $14.13
POWER EQUIPMENT OPERATOR: Single Axle Truck Highway
SUOK2011-006 (Includes Pilot Car)
$13.15 $0.00 $13.15
POWER EQUIPMENT OPERATOR: Straight Truck Highway
SUOK2011-006
$15.92 $0.00 $15.92
POWER EQUIPMENT OPERATOR: Striping Machine Highway
SUOK2011-006
$11.54 $0.00 $11.54
POWER EQUIPMENT OPERATOR: Tractor/Box Blade Highway
SUOK2011-006
$12.83 $0.00 $12.83
POWER EQUIPMENT OPERATOR: Transfer Material Machine Highway
SUOK2011-006
$12.38 $0.75 $13.13
POWER EQUIPMENT OPERATOR: Trencher Highway
SUOK2011-006
$14.66 $0.00 $14.66
POWER EQUIPMENT OPERATOR: TRUCK DRIVER Concrete Truck Highway
SUOK2011-006
$14.22 $0.00 $14.22
POWER EQUIPMENT OPERATOR: Water Truck Highway
SUOK2011-006
$13.44 $0.00 $13.44
Remaining Counties Highway
SUOK2011-006 Scope differs by code/WD
$13.94 $0.00 $13.94
Remaining Counties Highway
SUOK2011-006 Scope differs by code/WD
$13.70 $0.00 $13.70
Remaining Counties Highway
SUOK2011-006 Scope differs by code/WD
$10.64 $0.00 $10.64
Traffic Control Highway
SUOK2011-006 (Includes Flagger, Setting Up and Moving Cones/Barrels)
$10.28 $0.00 $10.28
TRUCK DRIVER Heavy
TEAM0516-006 (3) Flatbed Truck
$30.85 $16.65 $47.50
Vibrating Plate Highway
SUOK2011-006
$12.70 $0.00 $12.70

Wage Determinations

Highway

0 trades

Applies to

Adair, Cherokee, Craig, Delaware, Mayes, McIntosh, Muskogee, Nowata, Okfuskee, Ottawa +1 more

Heavy

0 trades

Applies to

Adair, Cherokee, Craig, Delaware, Mayes, McIntosh, Muskogee, Nowata, Okfuskee, Ottawa +1 more