Williamsburg

5 wage determinations 122 trade rates

Popular Trades In Williamsburg

Track Williamsburg County updates

Get an email when wage determinations covering Williamsburg County, South Carolina are modified.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Trade Rates

Click a row to save its rate for later, then export your selections from the Saved panel.

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Save Trade & Classification Rate Fringe Total
BOILERMAKER (TANK WORK) Heavy
SUSC1990-005
$12.96 $3.32 $16.28
BRICKLAYER Heavy
SUSC1990-005
$7.25 0.00 $7.25
BRICKLAYER Residential
SUSC2017-002
$7.25 0.00 $7.25
CARPENTER Heavy
SUSC1990-005
$7.42 0.00 $7.42
CARPENTER Residential
SUSC2017-002
$7.25 0.00 $7.25
CARPENTER, INCLUDES FORM WORK Building
SUSC2011-016
$16.00 0.00 $16.00
CEMENT MASON Residential
SUSC2017-002
$7.25 0.00 $7.25
CEMENT MASON/CONCRETE FINISHER Heavy
SUSC1990-005
$7.25 0.00 $7.25
DRYWALL FINISHER Residential
SUSC2017-002
$7.25 0.00 $7.25
DRYWALL HANGER Residential
SUSC2017-002
$7.25 0.00 $7.25
ELECTRICIAN Residential
SUSC2017-002
$7.25 0.00 $7.25
ELECTRICIAN (JASPER) Building
ELEC0508-009
$33.35 $13.40 $46.75
ELEVATOR MECHANIC Building
ELEV0032-003 (JASPER) PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE
$52.08 $38.44 $90.52
ELEVATOR MECHANIC Building
ELEV0135-002 (REMAINING COUNTIES): PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE
$51.11 $38.44 $89.55
HVAC MECHANIC/DUCT & PIPE Residential
SUSC2017-002
$7.25 0.00 $7.25
INSULATOR/ASBESTOS WORKER Residential
SUSC2017-002
$7.25 0.00 $7.25
IRONWORKER Heavy
SUSC1990-005
$10.98 0.00 $10.98
LABORER: COMMON OR GENERAL Building
SUSC2011-016
$10.42 $0.99 $11.41
LABORER: PIPELAYER Building
SUSC2011-016
$12.50 $1.23 $13.73
LABORERS: (CHAIN SAW) Heavy
SUSC1990-005
$7.25 0.00 $7.25
LABORERS: (GENERAL) Residential
SUSC2017-002
$7.25 0.00 $7.25
LABORERS: (MASON TENDER) Residential
SUSC2017-002
$7.25 0.00 $7.25
LABORERS: (MORTAR MIXER) Residential
SUSC2017-002
$7.25 0.00 $7.25
LABORERS: (PIPELAYER) Heavy
SUSC1990-005
$7.25 0.00 $7.25
LABORERS: GENERAL Heavy
SUSC1990-005
$7.25 0.00 $7.25
LINE CONSTRUCTION: LINE TECHNICIAN Heavy
SUSC1990-005
$10.08 0.00 $10.08
MANHOLE BUILDER Heavy
SUSC1990-005
$7.25 0.00 $7.25
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: COOK Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.11 $1.73 $9.84
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: COOK Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.11 $1.73 $9.84
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DECKHAND Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$7.77 $1.73 $9.50
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DECKHAND Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$7.77 $1.73 $9.50
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DREDGING :, HYDRAULIC DREDGES OVER 20"": CLASS A2: CRANE OPERATOR Heavy
ENGI0025-002 (360 SWING) . PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$43.20 $14.99 $58.19
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DREDGING :, HYDRAULIC DREDGES OVER 20"": CLASS A2: CRANE OPERATOR Heavy
ENGI0025-002 (360 SWING) . PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$43.20 $14.99 $58.19
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DREDGING :, HYDRAULIC DREDGES OVER 20"": CLASS B1: DERRICK OPERATOR Heavy
ENGI0025-002 (180 SWING), SPIDER/SPILL BARGE OPERATOR, TIMBER FORK OPERATOR, DOZER OPERATOR, ENGINEER, BLASTER/DRILLER, FILL PLACER, ELECTRICIAN, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR LICENSED ENGINEER (USCG) $1.80; OILER QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS TANKERMAN ENDORSEMENT ONLY (USCG) (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$41.93 $14.90 $56.83
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DREDGING :, HYDRAULIC DREDGES OVER 20"": CLASS B1: DERRICK OPERATOR Heavy
ENGI0025-002 (180 SWING), SPIDER/SPILL BARGE OPERATOR, TIMBER FORK OPERATOR, DOZER OPERATOR, ENGINEER, BLASTER/DRILLER, FILL PLACER, ELECTRICIAN, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR LICENSED ENGINEER (USCG) $1.80; OILER QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS TANKERMAN ENDORSEMENT ONLY (USCG) (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$41.93 $14.90 $56.83
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DREDGING :, HYDRAULIC DREDGES OVER 20"": CLASS C1: MATE, DRAG BARGE OPERATOR, WELDER, ASSISTANT FILL PLACER, STEWARD Heavy
ENGI0025-002 Scope differs by code/WD
$38.38 $14.66 $53.04
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DREDGING :, HYDRAULIC DREDGES OVER 20"": CLASS C1: MATE, DRAG BARGE OPERATOR, WELDER, ASSISTANT FILL PLACER, STEWARD Heavy
ENGI0025-002 Scope differs by code/WD
$38.38 $14.66 $53.04
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: ENGINEER Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$9.59 $1.73 $11.32
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: ENGINEER Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$9.59 $1.73 $11.32
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: LAUNCHMAN Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.19 $1.73 $9.92
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: LAUNCHMAN Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.19 $1.73 $9.92
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: LEVERMAN Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$10.03 $1.73 $11.76
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: LEVERMAN Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$10.03 $1.73 $11.76
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: MATE Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.82 $1.73 $10.55
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: MATE Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.82 $1.73 $10.55
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: MESS COOK Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$7.71 $1.73 $9.44
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: MESS COOK Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$7.71 $1.73 $9.44
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: MESSMAN & JANITOR Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$7.53 $1.73 $9.26
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: MESSMAN & JANITOR Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$7.53 $1.73 $9.26
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: OILER & FIREMAN (HYDRAULIC DREDGES UNDER 20"") Heavy
ENGI0025-002 Scope differs by code/WD
$8.11 $1.73 $9.84
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: OILER & FIREMAN (HYDRAULIC DREDGES UNDER 20"") Heavy
ENGI0025-002 Scope differs by code/WD
$8.11 $1.73 $9.84
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: SHOREMAN Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$7.82 $1.73 $9.55
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: SHOREMAN Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$7.82 $1.73 $9.55
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: SPIDER BARGE OPERATOR Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20"").PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.68 $1.73 $10.41
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: SPIDER BARGE OPERATOR Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20"").PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.68 $1.73 $10.41
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Building
SUSC2011-016
$16.95 $1.83 $18.78
PAINTER Residential
SUSC2017-002
$7.25 0.00 $7.25
PAINTER: BRUSH, ROLLER AND SPRAY Building
SUSC2011-016
$13.50 0.00 $13.50
PIPEFITTER Heavy
SUSC1990-005
$9.09 0.00 $9.09
PIPEFITTER Building
SUSC2011-016
$19.75 $3.96 $23.71
PLUMBER Building
SUSC2011-016
$17.20 $2.65 $19.85
PLUMBER/PIPEFITTER Residential
SUSC2017-002
$7.25 0.00 $7.25
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Highway
SUSC2011-038 (GEORGETOWN, HAMPTON, JASPER, WILLIAMSBURG)
$17.23 0.00 $17.23
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Highway
SUSC2011-038 (ALLENDALE, BAMBERG, BARNWELL, NEWBERRY, ORANGEBURG)
$17.56 0.00 $17.56
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (BEAUFORT) Highway
SUSC2011-038
$15.20 0.00 $15.20
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (COLLETON) Highway
SUSC2011-038
$17.78 0.00 $17.78
POWER EQUIPMENT OPERATOR: CARPENTER (FORM WORK ONLY) Highway
SUSC2011-038
$14.47 0.00 $14.47
POWER EQUIPMENT OPERATOR: CEMENT MASON/CONCRETE FINISHER Highway
SUSC2011-038
$14.11 0.00 $14.11
POWER EQUIPMENT OPERATOR: IRONWORKER, REINFORCING Highway
SUSC2011-038
$15.64 0.00 $15.64
POWER EQUIPMENT OPERATOR: LABORER Highway
SUSC2011-038 (ASPHALT, INCLUDES ASPHALT DISTRIBUTOR, RAKER, SHOVERLER, AND SPREADER)
$10.96 0.00 $10.96
POWER EQUIPMENT OPERATOR: LABORER (COLLETON) Highway
SUSC2011-038
$10.16 0.00 $10.16
POWER EQUIPMENT OPERATOR: LABORER (LUTEMAN) Highway
SUSC2011-038
$11.71 0.00 $11.71
POWER EQUIPMENT OPERATOR: LABORER (PIPELAYER) Highway
SUSC2011-038
$13.87 0.00 $13.87
POWER EQUIPMENT OPERATOR: LABORER (TRAFFIC CONTROL-FLAGGER) Highway
SUSC2011-038
$11.68 0.00 $11.68
POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL Highway
SUSC2011-038 (NEWBERRY, ALLENDALE, BAMBERG, BARNWELL)
$11.82 0.00 $11.82
POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL Highway
SUSC2011-038 (GEORGETOWN, HAMPTON, JASPER)
$10.07 0.00 $10.07
POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (BEAUFORT) Highway
SUSC2011-038
$10.15 0.00 $10.15
POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (COLLETON) Highway
SUSC2011-038
$10.16 0.00 $10.16
POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (ORANGEBURG) Highway
SUSC2011-038
$12.63 0.00 $12.63
POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (WILLIAMSBURG) Highway
SUSC2011-038
$10.01 0.00 $10.01
POWER EQUIPMENT OPERATOR: LABORER, TRAFFIC CONTROL-CONE SETTER Highway
SUSC2011-038 (BEAUFORT, COLLETON, GEORGETOWN, HAMPTON, JASPER, WILLIAMSBURG)
$12.84 0.00 $12.84
POWER EQUIPMENT OPERATOR: LABORER, TRAFFIC CONTROL-CONE SETTER Highway
SUSC2011-038 (ALLENDALE, BAMBER, BARNWELL, NEWBERRY, ORANGEBURG)
$12.98 0.00 $12.98
POWER EQUIPMENT OPERATOR: PAVER Highway
SUSC2011-038 (COLLETON, GEORGETOWN, HAMPTON, JASPER)
$13.67 0.00 $13.67
POWER EQUIPMENT OPERATOR: PAVER Highway
SUSC2011-038 (ALLENDALE, BAMBERG, BARNWELL, NEWBERRY, ORANGEBURG, WILLIAMSBURG)
$15.01 0.00 $15.01
POWER EQUIPMENT OPERATOR: PAVER (BEAUFORT) Highway
SUSC2011-038
$14.96 0.00 $14.96
POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (BULLDOZER) Highway
SUSC2011-038
$20.12 0.00 $20.12
POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (CRANE) Highway
SUSC2011-038
$16.62 0.00 $16.62
POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (GRADER/BLADE) Highway
SUSC2011-038
$16.62 0.00 $16.62
POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (LOADER (FRONT END)) Highway
SUSC2011-038
$15.51 0.00 $15.51
POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (MECHANIC) Highway
SUSC2011-038
$18.22 0.00 $18.22
POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (MILLING MACHINE) Highway
SUSC2011-038
$18.83 0.00 $18.83
POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (ROLLER) Highway
SUSC2011-038
$12.76 0.00 $12.76
POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (SCREED) Highway
SUSC2011-038
$13.01 0.00 $13.01
POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (TRACTOR) Highway
SUSC2011-038
$13.26 0.00 $13.26
POWER EQUIPMENT OPERATORS: (BACKHOE) Heavy
SUSC1990-005
$7.25 0.00 $7.25
POWER EQUIPMENT OPERATORS: (BULLDOZER) Residential
SUSC2017-002
$7.25 0.00 $7.25
POWER EQUIPMENT OPERATORS: (MOTOR GRADER) Residential
SUSC2017-002
$7.25 0.00 $7.25
POWER EQUIPMENT OPERATORS: (PAN SCRAPER) Heavy
SUSC1990-005
$7.25 0.00 $7.25
POWER EQUIPMENT OPERATORS: BACKHOE Residential
SUSC2017-002
$7.25 0.00 $7.25
POWER EQUIPMENT OPERATORS: BULLDOZER Heavy
SUSC1990-005
$7.25 0.00 $7.25
POWER EQUIPMENT OPERATORS: CRANE Heavy
SUSC1990-005
$7.98 0.00 $7.98
POWER EQUIPMENT OPERATORS: DRAGLINE Heavy
SUSC1990-005
$7.25 0.00 $7.25
POWER EQUIPMENT OPERATORS: FRONT END LOADER Heavy
SUSC1990-005
$7.25 0.00 $7.25
POWER EQUIPMENT OPERATORS: MECHANIC Heavy
SUSC1990-005
$7.25 0.00 $7.25
POWER EQUIPMENT OPERATORS: MOTOR GRADER Heavy
SUSC1990-005
$7.25 0.00 $7.25
ROOFER Residential
SUSC2017-002
$7.25 0.00 $7.25
SCAFFOLDS, BOSON CHAIRS, OR RAW STRUCTURAL STEEL: ELECTRICIAN Building
ELEC0776-001 (REMAINING COUNTIES) WORK MORE THAN 40 FT. ABOVE THE GROUND ON OR FROM SWINGING $1.00 PER HOUR ADDITIONAL
$32.80 $13.99 $46.79
SHEET METAL WORKER Residential
SUSC2017-002
$7.25 0.00 $7.25
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) Building
SUSC2011-016
$19.15 $1.15 $20.30
SOFT FLOOR LAYER Residential
SUSC2017-002
$7.25 0.00 $7.25
SPILL BARGE OPERATOR Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.68 $1.73 $10.41
SPILL BARGE OPERATOR Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.68 $1.73 $10.41
TILE SETTER Residential
SUSC2017-002
$7.25 0.00 $7.25
TRUCK DRIVER Heavy
SUSC1990-005
$7.25 0.00 $7.25
TRUCK DRIVER Building
SUSC2011-016
$13.50 $1.27 $14.77
TRUCK DRIVER Residential
SUSC2017-002
$7.25 0.00 $7.25
TRUCK DRIVER (DUMP TRUCK) Highway
SUSC2011-038
$12.00 0.00 $12.00
TRUCK DRIVER (LOWBOY TRUCK) Highway
SUSC2011-038
$14.43 0.00 $14.43
TRUCK DRIVER (SINGLE AXLE, INCLUDES PILOT CAR) Highway
SUSC2011-038
$12.04 0.00 $12.04
TRUCK DRIVER (TRACTOR HAUL TRUCK) Highway
SUSC2011-038
$16.25 0.00 $16.25
WELDER Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$9.79 $1.73 $11.52
WELDER Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$9.79 $1.73 $11.52

Wage Determinations

Heavy

20 trades

Applies to

Abbeville, Allendale, Bamberg, Barnwell, Beaufort, Cherokee, Chester, Chesterfield, Clarendon, Colleton +15 more

Heavy

32 trades

Applies to

Abbeville, Aiken, Allendale, Anderson, Bamberg, Barnwell, Beaufort, Berkeley, Calhoun, Charleston +36 more

Building

13 trades

Applies to

Georgetown, Jasper, Williamsburg

Highway

36 trades

Applies to

Allendale, Bamberg, Barnwell, Beaufort, Colleton, Georgetown, Hampton, Jasper, Newberry, Orangeburg +1 more

Residential

21 trades

Applies to

Clarendon, Dillon, Lee, Marion, Marlboro, Williamsburg